Permit Information
Permit NumberBLD99-00975
StatusFinaled
Name GAP/GAP BODY/GAP KIDS/BABY GAP
Site Address 350 N MILWAUKEE ST Unit: 1306
Project NameBTS - #1306 TO 1314
Customer Number 
ePlanReviewNo
Description
To finish 4 interconnected retail spaces per approved plans on file. Work to include, construction of two one-hour fire-rated exit corridors, construction of interior noncombustible partitions to divide up spaces to create a stockroom, fitting rooms, four separate sales areas, an office and an accessible restroom, Construction of a self supporting storefront system, per attached engineering, installation of a suspended ceiling system, new Mechnical, electrical and plumbing, Miscelaneous interior finishes, counters, cabinets, and shelving. NOTE: This building is fully fire sprinklered and has a smoke control system. Any alterations or modifications to the fire sprikler system shall be per NFPA #13 as regulated by the fire department, Any modifications to the smoke evacuation system must be maintained as installed under the 1985 UBC requirements. (P.C.#259-99)*RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/5/2000 DONE
Receive PAYMENT IN FULL  3/28/2000 DONE
Fee Review-notes6/17/1999 2/11/2000 DONE
additional values from subs--cert said no ele plm mech lh
Plan resubmittals received  10/27/1999 DONE
RECEIVED ONE COPY OF LETTER REGARDING THE ELECTRO-MAGNETIC LOCKING SYSTEM. ROUTED TO RON HILL. KMM
INSP-Final Inspection9/3/19999/7/19999/7/1999APASS
DetailsJoe Tawney
steve ###-#### fn fire insp; 9/7PM per 406 ok for permanent occupancy. jrb
INSP - Final9/3/19999/7/19999/7/1999APASS
DetailsCarl Dependahl
steve- 658-*8968 fn occ insp; 9/7 Corrections ok - c/o card to contractor. jrb;
Permanent occupancy UNPAID FEE  9/7/1999 DONE
Perm. Occ. Cert. #7887 issued 9-7-99 to Gap/Gap Body/Gap Kids/Baby Gap at Boise Towne Square.
INSP - Final9/2/19999/3/19999/3/1999AFAIL
DetailsCarl Dependahl
09/03/99 340 - LATE AM PLEASE, STEVE ###-####; need fire, seal corr's, d
INSP-Final Inspection9/2/19999/3/19999/3/1999AFAIL
DetailsRick Jackson
c/n issued - exit signs; test AHU and smoke control systems; magnetic entry doors require test and compliance with local code; sprinkler obstructed in storage room; damper access needed; etc.
INSP - Final9/1/19999/2/19999/2/1999PFAIL
DetailsCarl Dependahl
09/02/99 340 - STEVE ###-#### ; NEED FIRE, ETC.
INSP-Final Inspection8/31/19999/1/19999/1/1999PNR
DetailsJoe Tawney
09/01/99 406 - FINAL NOT READY FOR INSPECTION
INSP-Conference8/30/19998/30/19998/30/1999PPART
DetailsJoe Tawney
09/01/99 406 - CONF W/STEVE REG FIRE CODE ISSUES
INSP - Framing/Rough-in8/18/19998/19/19998/19/1999APART
DetailsCarl Dependahl
08/19/99 340 - ACCOUSTICAL CEILING. SHAWN ###-####
INSP - Framing/ Rough-in8/12/19998/12/19998/12/1999 PART
DetailsCarl Dependahl
/ / 340 - GRID CLG, CONF W/ BLDR ONLY
INSP-Final Inspection8/10/19998/11/19998/11/1999PPART
DetailsJoe Tawney
08/11/99 406 - OK ON ROUGH IN OF SPKLR SYSTEM
INSP - Framing/Rough-in8/9/19998/9/19998/9/1999PPART
DetailsCarl Dependahl
08/09/99 340 - SHAWN ###-####-ok pend elec ok at 3 south bays( 4 Gap Sto
INSP-Sprinkler Rough-in/Hydro8/9/19998/9/19998/9/1999 PART
DetailsJoe Tawney
/ / 406 - FAIL MISSING HD, DUCT OVER STOR, DIST FR VENT
Permanent Occupancy 8/5/19998/5/1999 DONE
Details
INSP - Framing/Rough-in7/23/19997/26/19997/26/1999APART
DetailsCarl Dependahl
07/26/99 340 - LEON ###-####; south corridor frame ok to cover, add fire
INSP - Framing/Rough-in7/16/19997/16/19997/16/1999 FAIL
DetailsCarl Dependahl
07/16/99 340 - Leon ###-#### The Gap space #1###-####; c/n, seal corrido
INSP-Sprinkler Rough-in/Hydro7/15/19997/15/19997/15/1999 PART
DetailsJoe Tawney
/ / 406 - OK ROUGH IN FRONT ENTR AND REAR ROMS
INSP - Framing/Rough-in7/15/19997/15/19997/15/1999PFAIL
DetailsCarl Dependahl
07/15/99 340 - Leon ###-####; add diagonals & connections at storefront
INSP - Framing/Rough-in7/7/19997/8/19997/9/1999PPART
DetailsTom Arcoraci
07/08/99 408 - LEFT C/N OK TO COVER PART
INSP - Framing/Rough-in6/29/19996/29/19996/29/1999PPART
DetailsCarl Dependahl
soffits, walls ok exc. at corridor
INSP-Sprinkler Rough-in/Hydro6/28/19996/28/19996/28/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON PARTIAL ROUGH IN HARD LID
INSP - Framing/Rough-in6/25/19996/28/19996/28/1999APART
DetailsCarl Dependahl
06/28/99 340 - dave ###-#### unit 1306 soffits, int part's ok; need rein
INSP - Framing/Rough-in6/23/19996/23/19996/23/1999PPART
DetailsCarl Dependahl
06/23/99 340 - Dave ###-####; OK TO COVER SO. DEMISING WALL ONLY, CONSUL
INSP - Framing/Rough-in6/10/19996/11/19996/11/1999APART
DetailsCarl Dependahl
06/11/99 340 - Dave ###-#### rear ext wall only ok to cover; discussed n
Issue PAID IN FULL permit  5/25/1999
Print Pending Permit.LaserJet4  5/24/1999 PASS
Telephone call  5/24/1999 PASS
talked to gary palmer to verify plans are ready
Inspection Record Card- Bld  5/24/1999
Print Occupancy Form  5/24/1999
PLANS/APPL TAKEN TO FRONT DESK  5/24/1999 PASS
Routing - PLAN CHECK5/21/1999 5/24/1999 PASS
Plan assigned to (R_H)4/19/1999 5/24/1999 PASS
Details
Finished plan reveiw will route to fire department 05/24/99 08:18:47 RMH - this action updated by action script from <<>> in Case No. BLD99-0975
Routing - FIRE5/21/1999 5/21/1999 PASS
Plan Review Completed(1st rev)  5/21/1999
Plan Reviewer's activity  5/20/1999 PASS
Plan resubmittals received  5/13/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM RMJ ARCHITECTS, FRANCESCA ZITO, FORWARDED SAME TO RON HILL. DAR 5/13/999
Plan Reviewer's activity  5/12/1999
GAVE PLANS TO KEN BONDE, CONTRACTOR FOR THE GAP, HE IS TO CORALATE ALL THE RESUBMITTALS INTO THREE SETS OF PLANS AND RESUBMIT THEM TO THE ME FOR REVIEW. KEN BONDE AT ###-####
Plan Reviewer's activity  4/29/1999
Received resubmitted floor plans, Called and talked to architech informed her that I would do a partial plan review but that I would need three new complete set of plans to do a complete review.
Routing - PUBLIC WORKS4/27/1999 4/28/1999 PASS
Plan Reviewer's activity  4/27/1999
ALL NEW PLANS HAVE BEEN RESUBMITTED TO THE BUILDING DEPARTMENT FOR REVIEW. I WILL REROUTE THE PLANS BACK THROUGH THE APPROPRIATE DEPARTMENTS.
Routing - PLAN CHECK4/20/1999 4/27/1999 FAIL
REROUTE TO PUBLIC WORKS FOR SIGNATURES.
Plan resubmittals received  4/26/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM GENSLER ARCHITECTS VIA J.P. PRICE COMPANY, FORWARDED SAME TO RON HILL. DAR 4/26/99
Routing - PUBLIC WORKS4/19/1999 4/20/1999 PASS
Plan assigned to (MYS)4/12/1999 4/19/1999
DetailsMarlene Southard
Plan routing begun/TENANTS  4/19/1999
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Received Certificate of Value  4/15/1999 PASS
RECEIVED REVISED CERT. OF VALUE. KMM
Received Certificate of Value  4/13/1999 PEND
LEFT MESSAGE WITH GARY PALMER ABOUT THE FACT THAT IF HE WANTS SEPARATE PLUMB. ELEC. MECH. AND OR FIRE SPRINKLER PERMITS HE NEED TO SUBMIT VALUES FOR THOSE. KMM
Plans ACCEPTED BY PLAN TECH  4/13/1999 PASS
Recd Pcfee & Taken To Pln CK  4/12/1999
Application received  4/12/1999