Description
To remodel and existing 2886 sq ft retail tenant space per approved plans on file. Work to include, selective demolition of interior partitions, existing storefront system and interior finishes. New work to include, construction of a one hour fire-resistive exit corridor, construction of one new fulluy accessible restroom, new interior partition to divide store room from sales area, the installation of a suspended ceiling system per UBC Standard 25-2, construction of a new storefront system per attached engineering, installation of a new roll up security grill, and Miscelaneous interior finishes. NOTE: This building is fully fire sprinklered and has a smoke control system. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. The smoke evacuation system shall be maintained as installed per the 1985 UBC.(P.C.#271-99)*RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes4/26/1999 3/21/2000 DONE
Permanent occupancy  11/18/1999 DONE
Perm. Occ. Cert. #8018 issued 11-18-99 to Brookstone at Boise Towne Square.
Permanent Occupancy 11/9/199911/9/1999 DONE
Details
BLD-Final11/8/199911/9/199911/9/1999APASS
DetailsCarl Dependahl
Rich ###-#### ext 11 Store Contact Bob Speck ###-#### Ok for C/O; card to Cathy.
INSP - Final9/7/19999/8/19999/8/1999 PASS
DetailsJoe Tawney
9/8 ok for permanent occupancy. jrb
INSP-Final Inspection9/7/19999/7/19999/7/1999APART
DetailsJoe Tawney
RICH ###-####; 9/7 OK for temp occupancy. jrb
INSP - Final9/3/19999/7/19999/7/1999AFAIL
DetailsCarl Dependahl
rich ###-#### fn occ insp; 9/7 Waiting for fire ok, need add'l permit for racks verified/finaled. jrb
INSP-Final Inspection9/1/19999/2/19999/2/1999AFAIL
DetailsJoe Tawney
09/02/99 406 - FINAL FAIL DUCT DET, DOORS & HDWRE, RATING TAGS, FIRE EXT
INSP - Framing/Rough-in8/19/19998/20/19998/20/1999APART
DetailsCarl Dependahl
08/20/99 340 - RICH ###-#### CEILING; complete wires at seismic pod, chk
INSP - Framing/ Rough-in8/19/19998/19/19998/19/1999 PART
DetailsCarl Dependahl
/ / 340 - SOFFITS/ CORRIDOR OK
INSP-Final Inspection8/18/19998/18/19998/19/1999PPART
DetailsJoe Tawney
08/19/99 406 - OK ON SPKLR ROUGH IN
INSP-Sprinkler Rough-in/Hydro8/9/19998/9/19998/9/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON PARTIAL ROUGH IN FRONT OF STORE
INSP - Framing/Rough-in8/6/19998/9/19998/9/1999APART
DetailsCarl Dependahl
08/09/99 340 - REINSPECTION. RICH ###-####; part, add rest 45 deg strut
INSP - Framing/Rough-in8/5/19998/6/19998/6/1999PFAIL
DetailsCarl Dependahl
08/06/99 340 - RICH ###-#### REINSPECTION KEEP C/N
INSP - Framing/Rough-in8/4/19998/5/19998/5/1999AFAIL
DetailsCarl Dependahl
08/05/99 340 - UNIT 1099 RICH ###-####-; ok to 1 side pend elec r/i. com
Issue PAID IN FULL permit  7/13/1999
Telephone call  5/26/1999 PASS
talked to david moody to verify plans are ready gave buck amount
Print Occupancy Form  5/26/1999
Inspection Record Card- Bld  5/26/1999
Print Pending Permit.LaserJet4  5/25/1999 PASS
Plan resubmittals received  5/25/1999 PEND
Received plan resubmittals from Cortland Morgan Architect, forwarded same to Ron Hill. DAR 5/25/99
PLANS/APPL TAKEN TO FRONT DESK  5/25/1999 PASS
Routing - PLAN CHECK4/21/1999 5/25/1999 PASS
Plan assigned to (R_H)4/19/1999 5/25/1999 PASS
Details
05/25/99 15:24:23 RMH - this action updated by action script from <<>> in Case No. BLD99-1027
Plan Reviewer's activity  4/29/1999 FAIL
spoke with architect by phone and went over each requirement.
Routing - FIRE4/21/1999 4/21/1999 PASS
smoke dampers can be removed
Routing - PLAN CHECK4/20/1999 4/21/1999 FAIL
Plan assigned to (MYS)4/15/1999 4/19/1999
DetailsMarlene Southard
Plan routing begun/TENANTS  4/19/1999
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Routing - PUBLIC WORKS4/19/1999 4/19/1999 PASS
Received Certificate of Value  4/15/1999 PEND
ONLY A PROJECT VALUE WAS FILLED IN AT THIS TIME. LEFT A MESSAGE WITH DAVID MOODY ABOUT ELEC. PLUMB. MECH. AND FIRE SPRINKLER VALUES. KMM
Recd Pcfee & Taken To Pln CK  4/15/1999
Application received  4/15/1999
Plans ACCEPTED BY PLAN TECH  4/15/1999 PASS