Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01067
StatusFinaled
Name R TOWLE
Site Address 7301 W EMERALD ST
Project NameEMERALD PLAZA
Customer Number 
ePlanReviewNo
Description
EMERALD PLAZA * (SHELL BUILDING ONLY) TO CONSTRUCT A NEW 8373 SQ. FT. SINGLE STORY, WOOD FRAMED, BRICK VENEER, TYPE V NONRATED, MULTI TENANT, SHELL OFFICE BUILDING. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. THIS PERMIT IS FOR A SHELL BUILDING ONLY. THERE WILL NOT BE A CERTIFICATE OF OCCUPANCY ISSUED WITH THIS PERMIT. SEPARATE PERMITS AND CERTIFICATE OF OCCUPANCY MUST BE OBTAINED FOR EACH FUTURE TENANT SPACE TO BE OCCUPIED. MJP DRH98-0221/7301 PC#283-99
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes4/30/1999 3/21/2001 DONE
Letter of compliance  11/17/2000 DONE
Letter of Compliance #20022 issued 11/17/00.
BLD-Final10/23/200010/24/200010/24/2000APASS
DetailsCarl Dependahl
FN- CLAY- ###-#### ; card to cont 10/24/2000 11:53:45 AM
Code Occupancy Approval  8/4/2000 PASS
PASS - COMPLIES W/ NEW PLANS APPROVED BY MARTIN S. IN PLANNING (DRH98-00221)
BLD-Final7/31/20007/31/20007/31/2000PCANC
DetailsJim Storey
###-#### call first 340. 7/31/2000 1:45:49 PM
BLD-Final7/31/20007/31/20007/31/2000PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 7/31/2000
FIRE-Final Inspection7/6/20007/6/20007/6/2000PPASS
DetailsJoe Tawney
###-#### Reinsp ok for cert. of compl 7/7/00 1:22:27 PM
BLD-Final5/4/20005/4/20005/4/2000PFAIL
DetailsJoe Tawney
Final fail curb paint & letter for FD access.
BLD-Framing/Rough-in10/4/199910/5/199910/5/1999AFAIL
DetailsCarl Dependahl
###-#### need truss calc's, anchor bolt clarification , etc. keep c/n
BLD-Framing/Rough-in9/20/19999/21/19999/21/1999APART
DetailsCarl Dependahl
clay ###-#### Gypsum @ 1hr. Wall east side; need to complete soffit areas
INSP - Framing/Rough-in8/16/19998/17/19998/17/1999APART
DetailsCarl Dependahl
08/17/99 340 - CLAY-- ###-#### FOR CONF CALL 1ST BEFORE INSP; met w/ sup
INSP - Foundation8/2/19998/3/19998/3/1999APART
DetailsTom Arcoraci
robert ###-#### ok execpt part where truck is using for access west side
INSP - Foundation7/29/19998/2/19998/2/1999AFAIL
DetailsWes Worcester
08/02/99 342 - ROBERT ###-#### need 11" clears to finish
INSP - Foundation7/27/19997/28/19997/28/1999APART
DetailsCarl Dependahl
07/28/99 340 - ROBERT ###-####LATE AM IF POSSIBLE; ftg part ok pending e
(F) Reprint permit  7/14/1999
Issue PAID IN FULL permit  7/13/1999
Inspection Record Card- Bld  7/12/1999
Print Occupancy Form  7/12/1999
Telephone call  7/12/1999 MESS
left mess that permit is ready
PLANS/APPL TAKEN TO FRONT DESK  7/9/1999 PASS
Routing - PLAN CHECK7/8/1999 7/9/1999
Print Pending Permit.LaserJet4  7/9/1999 PASS
Plan Reviewer's activity  7/9/1999 PASS
Plan assigned to (M_P)4/20/1999 7/9/1999 PASS
DetailsMike Phillips
07/09/99 16:46:08 M_P - this action updated by action script from <<>> in Case No. BLD99-1067
Plan resubmittals received  7/8/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM DESIGN RESOURCES, ROCKY TOWLE, FORWARDED SAME TO MIKE PHILLIPS. DAR 7/8/99
Routing - PLUMBING7/8/1999 7/8/1999 FAIL
still needs service sizing
Routing - PLAN CHECK7/6/1999 7/8/1999
Routing to Plumbing.
Routing - PLUMBING7/8/1999 7/8/1999 PASS
as per conversayion with clay a 2" service line will be run in from emerald
Routing - PLUMBING6/29/1999 7/6/1999 FAIL
jerry talked to these guys days ago and they were going to send a revised plan, it never showed up so i sent them back to routing and resent origional review to arch.
Routing - PLAN CHECK6/29/1999 6/29/1999
Routing to fire department for follow up review.
Plan resubmittals received  6/29/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM ROCKY TOWLE, FORWARDED SAME TO MIKE PHILLIPS. DAR 6/29/99
Routing - FIRE6/29/1999 6/29/1999 PASS
Plan Review Completed(1st rev)  6/28/1999 FAIL
Routing - FIRE6/22/1999 6/28/1999 FAIL
FED EXED ONE COPY TO FLOYD GAVE ISSUE COPY TO BILL A TO HOLD. KMM 6-28-99 RECEIVED COPY OF FIRE PLAN REVIEW, AND PLANS. DENIED, ROUTED TO BILL A. KMM
Plan resubmittals received  6/24/1999
RECEIVED THREE COPIES OF REVISED SHEETS C1.2 AND A7.1. ROUTED TO MIKE P. KMM
Routing - PLAN CHECK5/13/1999 6/22/1999
Routing Off Site - STRUCTURAL6/16/1999 6/22/1999 PASS
sent plans to OUTSIDE ENG. via pdq.mps Faxed comment to Rocky waiting for responce. Received comments and verified ok.
Plan Reviewer's activity  6/22/1999 PEND
WAITING FOR FIRE DEPARTMENT, PLUMBING AND OUTSIDE ENGINEERING FIRM APPROVALS.
Plan resubmittals received  6/11/1999
RECEIVED THREE COPIES OF REVISED CALCS AND SHEETS C1.1, C1.3, LS1.1, A1.1, A2.1, A3.1, A6.1, A7.1, S1.0, S2.0 ROUTED TO MIKE P. KMM
Routing - PLANNING5/7/1999 5/13/1999 PASS
approved per DRH98-0221 and as noted on sheet LS1.1.
Routing Off Site - STRUCTURAL4/21/1999 5/12/1999 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM Additional comment required for follow up review. Faxed comment to Rocky on 5/13/99.
Routing - PLAN CHECK5/3/1999 5/7/1999
Plan Reviewer's activity  5/6/1999
Waiting for Architect to submit new plans reflecting building is moved and not one-hour.
Plan Reviewer's activity  5/5/1999 HOLD
Set up meeting with architect to come in and do preliminary.
Routing - PLUMBING4/28/1999 5/3/1999 FAIL
Routing - PLANNING4/28/1999 4/30/1999 FAIL
landscape plan does not comply with D.R. conditions. Phoned Rocky and informed him of this.
Routing - PUBLIC WORKS4/21/1999 4/28/1999 PASS
Recd Pcfee & Taken To Pln CK  4/20/1999
Received Certificate of Value  4/20/1999 PASS
Plan routing begun/NEW & ADDTN  4/20/1999 PASS
Plans ACCEPTED BY PLAN TECH  4/20/1999 PASS
SPOKE TO CLAY O'DELL. PLANS WERE SUBMITTED AS A SHELL AND CORE, HOWEVER THERE WERE NO PLUMB. ELEC. OR MECH. PLANS. CLAY SPOKE WITH JOHN M. AFTER WHICH CLAY DECIDED TO GO WITH A SHELL ONLY PERMIT AT THIS TIME. KMM
Application received  4/20/1999
Plan assigned to (MYS)4/20/1999 4/20/1999 PASS
DetailsMarlene Southard
Routing Off Site - A.C.H.D7/13/1999  
received impact fee certificate #99-5408