BLD-Final | 8/28/2000 | 8/29/2000 | 8/29/2000 | P | PASS |
Tony Young
|
|
|
Mark ###-####
c. of c. # 19715 issued 8/29/2000 2:58:47 PM
|
BLD-Grading Inspection | 8/29/2000 | 8/29/2000 | 8/29/2000 | | PASS |
Rita DeYoung
|
|
|
Grading and drainage completed completed in substantial compliance to approved plan, with 2 exceptions. The driveway was not extended into the adjacent lot and the proposed swimming pool was not built. Both of these reduced the amount of grading and have been approved by the engineer. Therefore the final grading and drainage is approved by Public Works.
|
BLD-Final | 8/23/2000 | 8/24/2000 | 8/24/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/23/2000 at 13:06:49. Contact: ###-####.
all ok except need one smoke detector in lower hall way, need to look under floor when reinspect 8/24/2000 10:29:41 AM
also verify Terry Records sign off 8/24/2000 10:37:43 AM
|
BLD-Conference | 8/10/2000 | 8/11/2000 | 8/11/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 17:10:58. Contact: ###-####.
pre final. 8/11/2000 12:05:35 PM
|
BLD-Energy code compliance | 1/7/2000 | 1/10/2000 | 1/10/2000 | A | PASS |
Russ Owen
|
|
|
mark ###-####
|
BLD-Framing/Rough-in | 1/6/2000 | 1/6/2000 | 1/6/2000 | P | FAIL |
Russ Owen
|
|
|
fr insp--- mark ###-#### Chase's not fire stopped.
|
BLD-Energy code compliance | 1/6/2000 | 1/6/2000 | 1/6/2000 | P | FAIL |
Russ Owen
|
|
|
mark ###-#### energy code insp Some areas at stair well, not done.
|
BLD-Framing/Rough-in | 1/4/2000 | 1/5/2000 | 1/5/2000 | A | CANC |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 1/5/2000 | 1/5/2000 | 1/5/2000 | A | CANC |
Russ Owen
|
|
|
Already done.
|
BLD-Framing/Rough-in | 1/3/2000 | 1/4/2000 | 1/4/2000 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 10:31:40. Contact: ###-####. Truss engineering.
|
BLD-Framing/Rough-in | 12/13/1999 | 12/14/1999 | 12/14/1999 | A | PASS |
Russ Owen
|
|
|
MARK ###-#### SHEAR NAIL INSP
|
BLD-Foundation | 10/28/1999 | 10/29/1999 | 10/29/1999 | A | PASS |
Wes Worcester
|
|
|
MARK ###-####
|
BLD-Foundation | 9/17/1999 | 9/17/1999 | 9/17/1999 | P | PASS |
Russ Owen
|
|
|
Garage walls- pending letter from soils engineer, which was also required at Last Inpsection
|
INSP - Foundation | 9/9/1999 | 9/10/1999 | 9/10/1999 | A | PASS |
Russ Owen
|
|
|
garage area ok - pending letter from soils engineer
|
INSP - Foundation | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | FAIL |
Russ Owen
|
|
|
|
INSP - Foundation | 8/17/1999 | 8/18/1999 | 8/18/1999 | A | PASS |
Russ Owen
|
|
|
08/18/99 407 - note,corrections had to be made.
|
INSP - Foundation | 7/29/1999 | 7/30/1999 | 7/30/1999 | A | PASS |
Russ Owen
|
|
|
07/30/99 407 - footings
|
Issue PAID IN FULL permit | | | 7/7/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/15/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/15/1999 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/14/1999 | | PASS |
|
|
|
contractor submitted information that was requested.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/14/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/14/1999 | | PASS |
|
|
|
|
Plan assigned to (DJO) | 4/21/1999 | | 6/14/1999 | | PASS |
Dan Overy
|
|
|
06/14/99 16:04:55 DJO - this action updated by action script from <<>> in Case No. BLD99-1098
|
Meeting | | | 6/3/1999 | | PEND |
|
|
|
mark field came in and areas of concern were addressed. contractor took marked set and will return as soon as problems are resolved.
|
Plan Reviewer's activity | | | 6/2/1999 | | PEND |
|
|
|
called mark field. will be here in morning to discuss items that need addressed before issuance.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/2/1999 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 4/21/1999 | | 5/21/1999 | | PASS |
|
|
|
took to terry records
|
Routing - PLANNING | 4/21/1999 | | 5/21/1999 | | PASS |
|
|
|
took to terry records first, hillside lot accepted site plan per angie/jr
|
Routing - PUBLIC WORKS GRADING | 5/20/1999 | | 5/20/1999 | | PASS |
Rita DeYoung
|
|
|
approved as category 1. Retaining wall at end of driveway on lot 4 approved but design must be submitted and approved.
|
Application received | | | 4/21/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 5/21/1999 | | | | PEND |
|
|
|
|