Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01232
StatusExpired
Name CALVARY CHAPEL (BLD A)
Site Address 123 S AUTO DR
Project NameCALVARY CHAPEL
Customer Number 
ePlanReviewNo
Description
(CALVARY CHAPEL - BUILDING "A" SANCTUARY - CONCRETE ONLY) Fire sprinklers used for building area increase. To place new concrete footings, foundations, and floor slabs all per approved drawings and engineering on file. This work is in preparation for the future tenant improvement construction. A demo permit was issued earlier. No construction beyond concrete foundations and slabs is allowed under this permit. Any stated occupant loads are approximate and for reference only. THIS PERMIT DOES NOT ESTABLISH A CERTIFICATE OF OCCUPANCY. The holder of this partial permit shall proceed without assurance that the permit for the entire building will be granted. PC-21-99 DRH98-0208 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/17/2009 DONE
(F) Reprint permit  1/7/2004  
BLD-Footing7/31/20007/31/20007/31/2000PCANC
Details
###-#### done by 340 7/31/2000 1:48:21 PM
BLD-Concrete11/2/199911/2/199911/2/1999PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/02/1999 at 09:48:51. Contact: ###-####. Wall @ east side.
BLD-Foundation10/19/199910/20/199910/20/1999APART
DetailsCarl Dependahl
BRIAN--- ###-#### FOUND BLOCK INSP Will need Eng's clarification RE: shear wall/ foundation/ roof connection
INSP - Foundation9/8/19999/8/19999/8/1999PPART
DetailsCarl Dependahl
bryan ###-####; EXT COLUMN FND'S AT EAST & NORTH SIDE CHAPEL
INSP - Foundation8/31/19999/1/19999/1/1999APART
DetailsCarl Dependahl
09/01/99 340 - brian ###-#### cell- ft insp; ext col ftgs ok
INSP - Foundation8/26/19998/27/19998/27/1999APART
DetailsCarl Dependahl
08/27/99 340 - BRYAN ###-#### BLD A; infill wall ftgs; need engs clarifi
INSP - Foundation8/18/19998/18/19998/18/1999PPART
DetailsCarl Dependahl
08/18/99 340 - brian ###-#### call 1st fd exterior wall insp; ext infill
INSP - Foundation8/6/19998/9/19998/9/1999APART
DetailsCarl Dependahl
08/09/99 340 - CRAIG BAKER ###-#### FOOTING; int ftgs, part. met arch on
INSP - Footings6/23/19996/23/19996/23/1999 PART
DetailsCarl Dependahl
/ / 340 - INFILL AT EXT WALL OPENINGS OK
Issue PAID IN FULL permit  6/3/1999
Plan assigned to (CJW)5/3/1999 6/2/1999 PASS
DetailsCarl Westfall
06/02/99 08:06:26 CJW - this action updated by action script from <<>> in Case No. BLD99-1232
Inspection Record Card- Bld  6/2/1999
PLANS/APPL TAKEN TO FRONT DESK  6/2/1999 PASS
Routing - PLAN CHECK5/26/1999 6/2/1999
Plan Review Completed(1st rev)  5/26/1999
Routing - PLAN CHECK5/25/1999 5/26/1999
Routing - FIRE5/25/1999 5/26/1999 PASS
9/16/1999 Buttler & Associates
(Reference letter dated 8/26/1999, item # 2) for the fire hydrant requirement.
The Fire Department will accept the condition requested and waive the requirement of a new hydrant located within 300 feet of the fire department connection of Building "C" until the proposed change of occupancy is requested from a "B" to an "E".
Note: This letter shall be attached as a conditional requirement to this facility.
Routing - PLAN CHECK5/10/1999 5/18/1999 PASS
Print permit w/o conditions  5/18/1999
Plan Reviewer's activity  5/17/1999 PASS
UBC plan review started May 17, 1999 and finished May 18, 1999. Drawings approved.
Routing - PLANNING5/6/1999 5/10/1999 PASS
x-ref. drh98-0208
Routing - PUBLIC WORKS5/3/1999 5/5/1999 PASS
Plans ACCEPTED BY PLAN TECH  5/3/1999 PASS
Plan routing begun/TENANTS  5/3/1999
Application received  4/30/1999 PASS
Received Certificate of Value  4/30/1999 PASS
INSP - Foundation6/28/19996/28/19996/28/1989PPART
DetailsCarl Dependahl
06/28/99 340 - CRAIG FOOTING ###-#### EXT FTGS OK
Routing - PLANNING5/18/1999