Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01350
StatusFinaled
Name BROADWAY 111
Site Address 111 S BROADWAY AVE Unit: 129
Project NameBROADWAY 111
Customer Number 
ePlanReviewNo
Description
To remodel a 1,969 sq.ft. existing tenant space for use as a new assembly occupancy for food service and dining (frozen yogurt shop), including new accessible restrooms per approved plans on file. Work to include demolition of all interior components of existing tenant space, demolition of existing storefront, construction of new storefront, new interior walls, new suspended ceiling, finish work, intall walk-in freezers, new exterior landings and sidewalk work at exit doors, mechanical, plumbing, and electrical work. (P.C.#356-99) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Receive PAYMENT IN FULL  5/24/2000 DONE
Fee Review-notes5/11/1999 3/22/2000 DONE
NEED TO ADD 23,880.00 ADDITIONAL VALUE from subs
BLD-Final10/21/199910/22/199910/22/1999APART
Details
TCBY - final reinspect Ok for 310 to sign occ. Req. card
Permanent Occupancy 10/21/199910/21/1999 DONE
Details
Permanent occupancy  10/21/1999 DONE
Perm. Occ. Cert. #7961 issued 10-21-99 to TCBY.
FIRE-Final Inspection10/13/199910/14/199910/14/1999PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/13/1999 at 17:05:11. Contact: ###-####. Don’t have assembly permit
FIRE-Final Inspection10/14/199910/14/199910/14/1999PFAIL
DetailsRick Jackson
Lafe ###-#### Don’t have assembly permit
Code Occupancy Approval  8/16/1999
Temporary Occupancy requested by Lafe ###-####
INSP - Final8/12/19998/13/19998/13/1999APART
Details
08/13/99 338 - signed temp col
INSP-Final Inspection8/13/19998/13/19998/13/1999PPART
DetailsRick Jackson
LAFE ###-#### need assembly permit
INSP - Wall cover8/10/19998/11/19998/11/1999APASS
DetailsJim Storey
08/11/99 301 - CEILLING OK
INSP - Wall cover8/9/19998/10/19998/10/1999AFAIL
Details
08/10/99 338 - c/n issued
INSP - Final8/4/19998/5/19998/5/1999ANR
DetailsRuss Owen
08/05/99 407 - need to install lights.
INSP - Framing/Rough-in7/16/19997/16/19997/16/1999 PART
Details
07/16/99 338 - made ok to cover the walls int
Plan assigned to (JCB)5/13/1999 6/28/1999 PASS
DetailsJason Blais
Print Occupancy Form  6/28/1999
Inspection Record Card- Bld  6/28/1999
Telephone call  6/28/1999 PASS
###-####
Routing - PLAN CHECK6/24/1999 6/28/1999 PASS
Plans approved & taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  6/28/1999
Issue PAID IN FULL permit  6/28/1999
Print Pending Permit.LaserJet4  6/28/1999
Routing - FIRE6/23/1999 6/24/1999 PASS
Plan Review Completed(1st rev)  6/24/1999
Routing - PUBLIC WORKS6/22/1999 6/23/1999 PASS
Routing - PLAN CHECK6/15/1999 6/22/1999 PEND
Plan approval pending on another plumbing review (plumbing plans changed) and fire dept. review. Plans routed to these departments.
Plan Reviewer's activity  6/22/1999 PEND
A final third set of resubmittal drawings were provided with code compliance. Plans need another review by the plumbing division because of changes and review by fire.
Received Certificate of Value  6/22/1999 PASS
Received updated Certificate of Value.
Routing - PLUMBING6/22/1999 6/22/1999 PASS
ADDED 2 FLOOR SINKS, 2 FLOOR DRAINS AND MISC. DRAINAGE PIPING
Plan resubmittals received  6/21/1999 PEND
Received two full sets of resubmittal drawings.
Telephone call  6/16/1999
Talked to architect on the phone and again told him requirements for restroom to meet accessibility. He acknowledged and said resubmittal plans would be coming.
Plan resubmittals received  6/15/1999 PEND
Received two full sets of resubmittal drawings. Plans not approved.
Routing - PLANNING6/15/1999 6/15/1999 PASS
approved; see letter (attached to plans) from Jim Mowbray which states that seating will not increase from the previous location within the center.
Routing - PLAN CHECK5/25/1999 6/15/1999 FAIL
Routed to planning.
Plan resubmittals received  6/10/1999 PEND
Received 2 full sets of resubmittal drawings. A sheet A11 was added in the plans. Plans not approved.
Routing - PLANNING5/21/1999 5/25/1999 FAIL
New exterior work and change of use requires a zoning certificate.
Routing - PLAN CHECK5/20/1999 5/21/1999 PEND
Plans need to go through planning and zoning review before I can review the plans.
Routing - PLUMBING  5/20/1999 PASS
Routing - PUBLIC WORKS5/14/1999 5/18/1999 PASS
Received Certificate of Value  5/13/1999 PASS
Plan assigned to (MYS)5/11/1999 5/13/1999
DetailsMarlene Southard
Plan routing begun/TENANTS  5/13/1999
Route to PUBLIC WORKS, PLUMBING, PLANNING, PLAN CHECK and FIRE. Previously approved by Carol Johnson, CDH, on 5/11/99.
Plans ACCEPTED BY PLAN TECH  5/12/1999 PASS
APPLICATION REQUIRES RECORD DECL. FORM. NOTIFIED JIM MOWBRAY OF THIS NEED. KMM
Recd Pcfee & Taken To Pln CK  5/11/1999
Application received  5/11/1999
(F) Reprint permit