Fee Review-notes | 6/19/2003 | 6/19/2003 | 6/19/2003 | | DONE |
|
|
|
|
Fee Review-notes | 5/11/1999 | | 3/22/2000 | | DONE |
|
|
|
NEED TO ADD 38,559.00 TO PROJECT VALUE--from subs
|
(F) Reprint permit | | | 3/22/2000 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/7/2000 | 1/7/2000 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/7/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8072 issued 1-7-00 to McDonald's.
|
Code Occupancy Approval | | | 1/5/2000 | | PASS |
|
|
|
all conditions have been met for drh98-00227 final signed off and bond released.
|
BLD-Final | 12/14/1999 | 12/15/1999 | 12/14/1999 | A | PART |
Wes Worcester
|
|
|
Temp. occ. Only
|
FIRE-Final Inspection | 12/14/1999 | 12/14/1999 | 12/14/1999 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 09:55:59. Contact: ###-####.
|
Code Occupancy Approval | | | 12/14/1999 | | FAIL |
|
|
|
PARKING LOT STRIPPING AND SOME LANDSCAPE NOT IN PLACE, REQUIRED TO POST BOND FOR AT TOTAL OF $1,540.00 BEFORE TEMPORARY CAN BE SIGNED.
|
Temporary occupancy | | | 12/14/1999 | | DONE |
|
|
|
Temp. Occ. Cert. #3957 issued 12-14-99 to McDonald's Restaurant.
|
FIRE-Final Inspection | 12/13/1999 | 12/13/1999 | 12/13/1999 | P | PART |
Rick Jackson
|
|
|
RBO ###-#### Awaiting assembly point.
|
BLD-Final | 12/13/1999 | 12/13/1999 | 12/13/1999 | P | FAIL |
Jim Storey
|
|
|
ROB ###-#### FIRE IS ALSO GOING OUT TODAY
|
Plan resubmittals received | | | 12/13/1999 | | DONE |
|
|
|
RECEIVED FIVE COPIES OF REVISED TRASH CORRAL SEWER AND STORM DRAIN DRAWINGS. ROUTED TWO TO BILL V. AND THREE TO THE FILE. BRIAN OF PUBLIC WORKS HAS HIS COPIES. KMM
|
FIRE-Final Inspection | 12/9/1999 | 12/10/1999 | 12/10/1999 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 17:10:02. Contact: ###-####. Not ready for fire final
|
FIRE-Final Inspection | 12/8/1999 | 12/9/1999 | 12/9/1999 | A | FAIL |
Rick Jackson
|
|
|
FOR A TRIP TEST-- ROB-###-#### FIRE FN Kitchen extinguishing system tested ok; not ready for final.
|
Plan resubmittals received | | | 12/9/1999 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEET C3.1 SHEET. ROUTED TO BILL V. KMM BILL GAVE BACK ONE COPY OF SHEET C3.1 I ROUTED TO RECORDS. KMM
|
Print Occupancy Form | | | 12/9/1999 | | DONE |
|
|
|
|
BLD-Other | 12/8/1999 | 12/8/1999 | 12/8/1999 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/08/1999 at 10:26:57. Contact: ###-####. Bottom of type I shaft ok.
|
BLD-Framing/Rough-in | 11/29/1999 | 11/30/1999 | 11/30/1999 | A | PART |
Jim Storey
|
|
|
Jay ###-#### Shaft ok.
|
Telephone call | | | 11/30/1999 | | DONE |
|
|
|
CONTACTED BAUMGART CONST. REQUESTING THE TWO ADDITIONAL REVISED C3.1 SHEETS. I RECEIVED ONLY THREE COPIES ON 11-22-99. I ROUTED THOSE TO BRIAN MURPHY. I SPOKE WITH CHRIS TO LET HIM KNOW THAT I NEED TWO ADDITIONAL COPIES FOR INSPECTOR AND OFFICE COPY OF PLANS. KMM
|
Plan resubmittals received | | | 11/22/1999 | | DONE |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEETS C3.1. ROUTED THESE TO PUBLIC WORKS. CONTACTED BAUMGART CONSTRUCTION REQUESTING TWO ADDITIONAL COPIES. WHEN I RECEIVE THEM I WILL ROUTE TO JIM STOREY. KMM
|
BLD-Energy code compliance | 11/3/1999 | 11/4/1999 | 11/4/1999 | P | PASS |
Russ Owen
|
|
|
ROB ###-#### ENERGY CODE Exterior walls ok to cover.
|
BLD-Wall cover | 11/2/1999 | 11/3/1999 | 11/3/1999 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 11/02/1999 at 16:19:10. Contact: ###-####. Ok to insulate only need to check anchor bolts east and north ends.
|
BLD-Wall cover | 11/1/1999 | 11/2/1999 | 11/2/1999 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/01/1999 at 14:28:04. Contact: ###-####. No correction notice from previous inspection.
|
BLD-Framing/Rough-in | 10/29/1999 | 11/1/1999 | 11/1/1999 | A | FAIL |
Jim Storey
|
|
|
ROB-- ###-#### FOR WALL COVER/FR Called and canceled plumbing fail no insp.
|
BLD-Other | 10/19/1999 | 10/19/1999 | 10/19/1999 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/19/1999 at 09:25:36. Contact: ###-####. Shear nailing ok
|
BLD-Framing/Rough-in | 10/12/1999 | 10/14/1999 | 10/14/1999 | A | FAIL |
Jim Storey
|
|
|
CONFERENCE Rob ###-#### Roof nailing incorrect.
|
BLD-Framing/Rough-in | 10/13/1999 | 10/14/1999 | 10/14/1999 | P | PART |
Jim Storey
|
|
|
Roof decking submittal required, no clips or T/E.
|
BLD-Framing/Rough-in | 9/20/1999 | 9/20/1999 | 9/21/1999 | P | FAIL |
Jim Storey
|
|
|
JULIE--- 323-011 ground work-mcdonalds-
|
INSP - Foundation | 9/13/1999 | 9/14/1999 | 9/14/1999 | P | PART |
Russ Owen
|
|
|
UNABLE TO MAKE INSPECTION THIS DAY, OK PENDING SPECIAL INSPECTN REPORT
|
Footing | 9/13/1999 | 9/13/1999 | 9/13/1999 | P | PART |
|
|
|
made ok to pour center footing with sp insp approval
|
INSP - Foundation | 9/9/1999 | 9/10/1999 | 9/10/1999 | P | PART |
Jim Storey
|
|
|
rebar ok pending special insp. Report
|
(F) Reprint permit | | | 9/2/1999 | | |
|
|
|
|
Telephone call | | | 8/13/1999 | | |
|
|
|
CALLED AR, SPOKE WITH DAVE BLISS. GAVE HIM FEE AMOUNTS AND TOLD HIM PERMIT WAS READY ###-####
|
Plan assigned to (JCM) | 5/13/1999 | | 6/22/1999 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 6/17/1999 | | 6/22/1999 | | PASS |
|
|
|
sent TO OUTSIDE ENG. as per John M.mps
|
Routing - PLAN CHECK | 6/7/1999 | | 6/22/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/1999 | | PASS |
|
|
|
|
Telephone call | | | 6/22/1999 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/22/1999 | | |
|
|
|
|
Telephone call | | | 6/22/1999 | | PASS |
|
|
|
talked to steve trout to verify plans are ready-gave dollar amount
|
Print Occupancy Form | | | 6/22/1999 | | |
|
|
|
|
Plan resubmittals received | | | 6/16/1999 | | PASS |
|
|
|
Received 3 sets of resubmittals S1,S2,S3,S3A,S4, plus cover sheet, forward to John M.mps
|
Routing Off Site - STRUCTURAL | 5/13/1999 | | 6/8/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
|
Plan resubmittals requested | | | 6/8/1999 | | PEND |
|
|
|
FAXED STEVE TROUT A COPY OF COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS.
|
Routing - FIRE | 6/2/1999 | | 6/7/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 6/7/1999 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/2/1999 | | 6/2/1999 | | PEND |
|
|
|
Sent page S-3 to consultanting engineer as requested by him.
|
Plan Reviewer's activity | | | 6/2/1999 | | PASS |
|
|
|
PLANS REVIEWED AND APPROVED AS DRAWN WITH RED LINED NOTES AND ATTACHED REQUIREMENT LIST.
|
Routing - PLAN CHECK | 6/1/1999 | | 6/2/1999 | | PEND |
|
|
|
|
Routing - PLANNING | 5/24/1999 | | 6/1/1999 | | PASS |
|
|
|
PLANNING APPROVAL PER ATTACHED CONDITIONS OF CUP98-0143, and per DRH98-0227.
|
Routing - PLUMBING | 5/19/1999 | | 5/24/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/13/1999 | | 5/19/1999 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 5/11/1999 | | 5/13/1999 | | PASS |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 5/13/1999 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/13/1999 | | PASS |
|
|
|
|
Received Certificate of Value | | | 5/12/1999 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/11/1999 | | |
|
|
|
|
Application received | | | 5/11/1999 | | |
|
|
|
|
Routing Off Site - C.D.H | 5/5/1999 | | 5/5/1999 | | PASS |
|
|
|
|