Permit Information
Permit NumberBLD99-01663
StatusFinaled
Name THE BON MARCHE
Site Address 350 N MILWAUKEE ST Unit: 0103
Project NameBTS - #1057 TO #1060
Customer Number 
ePlanReviewNo
Description
To remodel the shoe department to create a 468 sq.ft. cosmetics area per approved plans on file. Work to include, construction of approximatley 49 lf of nonbearing noncombustible partition, install a new gypboard ceiling and lighting cove, new flooring, install new door through the existing glass storefront, Miscelaneous interior related finishes. NOTE: This building is fully fire sprinklered and has a smoke control system. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. The Smoke evacuation system shall be maintained as installed under the 1985 UBC. (P.C.#422-99) *RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 9/18/19999/18/1999 DONE
Details
Permanent occupancy  9/16/1999 DONE
Perm. Occ. Cert. #3901 issued 9-8-99 to The Bon Marche for the cosmetics dept.
INSP - Final9/7/19999/8/19999/8/1999APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/07/1999 at 10:23:01. Contact: ###-####; 9/8 Card to owner. jrb
INSP-Final Inspection9/7/19999/7/19999/7/1999PPASS
DetailsJoe Tawney
ERIC ###-#### THIS IS FOR OCC; 9/7 ok for permanent occupancy. jrb
INSP - Final8/19/19998/20/19998/20/1999AFAIL
DetailsAlan Hauser
08/20/99 350 - done #340
INSP - Final8/20/19998/20/19998/20/1999 PART
DetailsCarl Dependahl
/ / 340 - OK FOR T/O, HAS FIRE C/N. CARD TO CONT.
INSP - Final8/20/19998/20/19998/20/1999 PART
DetailsJoe Tawney
/ / 406 - REINSP OK FOR TEMP OCC
INSP - Framing/ Rough-in8/20/19998/20/19998/20/1999 PART
DetailsCarl Dependahl
/ / 340 - C/N OK, REC'D ARCH'S LETTER RE STUD CHANGE
INSP-Final Inspection8/18/19998/19/19998/19/1999AFAIL
DetailsJoe Tawney
08/19/99 406 - FINAL FAIL DOOR HDWRE, SMOKE DET, DOOR SIGN
INSP - Framing/Rough-in7/29/19998/2/19998/2/1999AFAIL
DetailsTom Arcoraci
08/02/99 408 - need ok form arch for stud change
INSP-Sprinkler Rough-in/Hydro7/30/19997/30/19997/30/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON PARTIAL SPKLR ROUGH IN
Issue PAID IN FULL permit  7/14/1999
Print Pending Permit.LaserJet4  7/13/1999 PASS
Print Occupancy Form  7/13/1999
PLANS/APPL TAKEN TO FRONT DESK  7/13/1999 PASS
Inspection Record Card- Bld  7/13/1999
Plan assigned to (R_H)6/11/1999 7/13/1999 PASS
Details
07/13/99 10:22:39 RMH - this action updated by action script from <<>> in Case No. BLD99-1663
Routing - PLAN CHECK6/25/1999 7/13/1999 PASS
Plan resubmittals received  7/12/1999
RECEIVED PLAN RESUBMITTALS FROM WILLIAM POLK ASSOCIATES, FORWARDED SAME TO RON HILL. DAR 7/22/99
Plan Reviewer's activity  7/9/1999 FAIL
Incomplete resubmited details, faxed new requirements to Terry Dir and William Polk.
Plan Reviewer's activity  7/8/1999 FAIL
Recieved resubmitals, were incomplete, called Architect, talked to Terry Dir, she indicated that they had not sent all the details as thought and they would send them today.
Plan resubmittals received  7/6/1999 FAIL
RECEIVED REVISED SHEETS. HOWEVER ARCH. SHEETS WERE NOT STAMPED OR SIGNED. CONTACTED WILLAM POLK OF THIS NEED. HE WILL GET A HOLD OF 4 WEST PARALLEL ABOUT A SHEETS. I WILL PUT IN HOLD BOX UNTIL I RECEIVE STAMPED AND SIGNED PLANS. KMM
Routing - FIRE6/24/1999 6/24/1999 PASS
Routing - PLAN CHECK6/11/1999 6/24/1999 FAIL
Route to fire department.
Plan Reviewer's activity  6/24/1999 FAIL
Faxed requirements to Architect and Owner.
Plan routing begun/TENANTS  6/11/1999
Route to PLAN CHECK and FIRE.
Plan assigned to (MYS)6/9/1999 6/11/1999
DetailsMarlene Southard
Application received  6/9/1999
Plans ACCEPTED BY PLAN TECH  6/9/1999
NO DIMENSIONS CONTACTED WILLIAM POLE
Received Certificate of Value  6/9/1999 PASS
Recd Pcfee & Taken To Pln CK  6/9/1999