Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD99-01672
StatusFinaled
Name HEWLETT-PACKARD ATT: OLGA
Site Address 303 N KIMBALL ST
Project NameHP #26
Customer Number46B11152
ePlanReviewNo
Description
TO COMPLETE THE INTERIOR OF A NEW SHELL BUILDING INTO OFFICE SPACE WITH RESTROOMS AND MECHANCIAL ROOM FOR SWITCH GEAR. WORK TO INCLUDE NEW SUSPENDED CEILING, NON-RATED INTERIOR PARTITIONS OF STEEL STUD A GYP. BOARD AND OTHER RELATED WORK PER APPROVED PLANS AND ATTACHMENTS. THIS BUILDING IS FULLY FIRE SPRINKLERED FOR AREA INCREASE.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/9/1999 4/17/2000 DONE
additional value from subs
(F) Reprint permit  4/14/2000 DONE
Permanent occupancy  11/12/1999 DONE
Perm. Occ. Cert. #8004 issued 11-12-99 to Hewlett-Packard, Bldg. #26.
Permanent Occupancy 11/9/199911/9/1999 DONE
Details
BLD-Final11/8/199911/9/199911/9/1999PPASS
DetailsCarl Dependahl
KENT ###-#### Card to cont.
BLD-Final11/5/199911/8/199911/8/1999PFAIL
DetailsCarl Dependahl
KEN ###-#### Keep C/N, has T/O
Code Occupancy Approval  11/3/1999 DONE
DetailsCarol Montgomery
Complies with DRH98-0006 & DRH-00138 - Signed Final (Req. by Kent Giese ####-####).
FIRE-Final Inspection10/20/199910/22/199910/22/1999PPASS
DetailsJoe Tawney
MIKE ###-#### FN FIRE Reinsp. Ok for permanent occupancy
BLD-Final10/14/199910/15/199910/15/1999AFAIL
DetailsCarl Dependahl
KENT--- ###-#### FN OCC Ok for T/O- C/N: handrails, misc. finish, other finals.
FIRE-Final Inspection10/12/199910/13/199910/13/1999PPART
DetailsJoe Tawney
Mike ###-#### Ok for Temporary occupancy per Lan Smith
BLD-Framing/Rough-in10/11/199910/12/199910/12/1999AFAIL
DetailsCarl Dependahl
CONFERENCE Mike Hatash ###-#### Need elec. Final
FIRE-Hydro test above ground10/7/199910/7/199910/7/1999APART
DetailsJoe Tawney
okay for an above ground hrdro test
FIRE-Supply Line Hydro10/6/199910/6/199910/6/1999PFAIL
DetailsJoe Tawney
Jeff ###-#### hydro test fail reschedule
BLD-Framing/Rough-in9/28/19999/28/19999/28/1999PPART
DetailsWes Worcester
CEILING GRID KENT ###-#### Need installation criteria, entrance not done, ok to drop panels
BLD-Framing/Rough-in9/23/19999/24/19999/23/1999AFAIL
DetailsWes Worcester
GRID CEILING #26 KENT ###-#### Seismic pods & spreader bars to be installed per Mfg's specs
FIRE-Sprinkler Rough-in9/23/19999/23/19999/23/1999PPART
DetailsJoe Tawney
JEFF-- ###-#### R/I FOR FIRE Ok on sprinkler system R/I
(F) Reprint permit  9/15/1999 DONE
Plan assigned to (MLO)8/5/1999 9/10/1999 PASS
DetailsMike Otto
PLAN MODIFICATION
Sprinkler Rough-in9/9/19999/9/19999/9/1999PPART
DetailsJoe Tawney
R/I ok pm preaction sprlr system - ok to cover
Routing - FIRE9/9/1999 9/9/1999 PASS
Many of the same issues not addressed from first review.
Routing - PLUMBING8/31/1999 8/31/1999 PASA
Routing - PUBLIC WORKS8/27/1999 8/31/1999 PASS
Routing - PLANNING8/25/1999 8/27/1999 PASS
Routing - PLAN CHECK8/5/1999 8/25/1999 PASS
PLAN MODIFICATION COMPLETED. MLO
INSP - Framing/Rough-in8/17/19998/18/19998/18/1999APART
DetailsWes Worcester
08/18/99 342 - one hr walls not done, 45 brace missing above door at rea
Plan Modification Accepted  8/5/1999 PEND
Telephone call  7/30/1999
CONTACTED ARCHITECT TO SUBMIT APPLAICATION FOR PLAN MODIFICATION FOR REVISED PLANS BROUGHT INTO OFFICE 07/30/99. MLO
INSP - Framing/Rough-in7/26/19997/27/19997/27/1999APART
DetailsCarl Dependahl
07/27/99 340 - hard lid at telecom rm, need see roof drain areaScheduled
Issue PAID IN FULL permit  7/7/1999
Inspection Record Card- Bld  7/6/1999
Print Occupancy Form  7/6/1999
Telephone call  7/6/1999 MESS
left voice message\\###-####
Routing - PLANNING7/6/1999 7/6/1999 PASS
DRH99-0138 approved additional parking.
PLANS/APPL TAKEN TO FRONT DESK  7/6/1999 PASS
Plan assigned to (MLO)6/10/1999 7/6/1999 PASS
DetailsMike Otto
Plan Review Completed(1st rev)  7/2/1999
Plan resubmittals received  7/2/1999 PEND
LANDSCAPE REVISIONS RECEIVED. MLO
Routing - FIRE6/25/1999 6/30/1999 PASS
FED EXED ONE COPY TO FLOYD. BILL WILL HOLD THE OTHER COPY. KMM 7-1-99 RECEIVED PLANS BACK FROM FLOYD AND ROUTED TO BILL A. FAXED COPY OF FIRE PLAN REVIEW TO ARCH. KMM
SUPER- Supervisor's review6/24/19996/24/19996/24/1999
kimball reviewd with perry and he has talked with linda and will get issuse straightend out
SUPER- Supervisor's review6/22/19996/22/19996/22/1999
entry problem on this permit solved by perry paine. ok
Routing - PLAN CHECK6/18/1999 6/21/1999 PASS
SUPER- Supervisor's review6/18/19996/18/19996/18/1999
turned over to perry paine for resolve this is perrys old area and we were working on project on another similar problem. linda should have an answer right away on this project.
Routing - PLUMBING6/17/1999 6/18/1999 PASS
Routing - PUBLIC WORKS6/11/1999 6/17/1999 PASS
Telephone call  6/14/1999 PASS
LEFT MESS FOR JONATHAN SEAL THAT PERMIT IS READY
Plan resubmittals requested  6/11/1999 FAIL
Plan Reviewer's activity  6/11/1999 PASS
PARTIAL PERMIT ISSUED AT THE REQUEST OF JONATHAN SEEL IN ACCORDANCE WITH RESOLUTION #13535.
Plan routing begun/TENANTS  6/10/1999
Plans ACCEPTED BY PLAN TECH  6/10/1999 PASS
Kathy called Cornel Larson about him bringing in 3 more sets of plans for civil engineering. Will bring in today will route to p & z than p.w and plumbing.mps
Received Certificate of Value  6/10/1999 PASS
Plan assigned to (MYS)6/9/1999 6/9/1999
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  6/9/1999
Application received  6/9/1999
Routing - PLAN CHECK9/10/19999/10/1999   
Routing - PLAN CHECK9/10/19999/10/1999   
Code Occupancy Approval    FAIL
iNSP. 10/14/99-SIGNED TEMP.- STILL NEED TO PUT UP AN ABOVE GRADE H/;C PRKG. SIGN AND RELOCATE BIKE RACK