Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD99-01697
StatusFinaled
Name ANSER CHARTER SCHOOL
Site Address 733 S PIONEER ST
Project NameANSER CHARTER SCHOOL
Customer Number 
ePlanReviewNo
Description
ANSER CHARTER SCHOOL * CHANGE EXISTING HANDBALL COURTS TO CLASSROOMS AND UPGRADE RESTROOMS, COMPLETE TWO-HOUR AREA SEPARATION WALL CONSTRUCT NEW HALLWAYS AND ENLARAGE DAYCARE ROOM PER APPROVED PLANS. CUP99-0051 PC#439-99 NOTE: BLEACHERS MUST BE REMOVED FROM LARAGE EXCERCISE ROOM TO REDUCE OCCUPANT LOAD TO LESS THAN 300 FOR NON-RATED CONSTRUCTION. FIRE SPRINKLERS ARE USED FOR AREA INCREASE.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/22/2010  
Case Summary (BLD)  8/4/2009  
Case Summary (BLD)  1/7/2004  
Fee Review-notes6/11/1999 4/17/2000 DONE
additioanal value from subs 5/16/00-update name to Anser Charter school-so they get bill..lh
(F) Reprint permit  4/17/2000 DONE
Permanent Occupancy 3/7/20003/7/2000 DONE
Details
Permanent occupancy  3/7/2000 DONE
Perm. Occ. Cert. #8154 issued 3-7-00 to the Anser Charter School.
Telephone call  2/28/2000 DONE
Talked w/Tom Henderson again and he said he would contact the mechanical sub to request a final inspection. Supposedly, work is finished.
Telephone call  2/16/2000 DONE
Called re: status of temp. occ. & left msg.
Temporary occupancy  1/5/2000 DONE
Gave Temp occ to Answer Charter School-Mec and Structural still pending-April 4th is the expiration of the temp occ.mps Temp. Occ. #3964
BLD-Final1/3/20001/3/20001/3/2000PPART
Details
tom ###-#### signed the temp col as mech is still temp.
FIRE-Final Inspection1/3/20001/3/20001/3/2000APASS
DetailsRick Jackson
FIRE-Final Inspection12/27/199912/28/199912/28/1999PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/27/1999 at 14:08:29. Contact: ###-####. Alarm panel problems.
FIRE-Final Inspection12/6/199912/7/199912/7/1999AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/06/1999 at 11:44:16. Contact: ###-####. Exit signs as beam detector.
FIRE-Final Inspection11/12/199911/12/199911/12/1999AFAIL
DetailsRick Jackson
C/N issued
FIRE-Final Inspection11/4/199911/8/199911/8/1999AFAIL
DetailsRick Jackson
JEFF-- PAGER ###-#### FIRE FN Alarm plans; sprinkler problems.
BLD-Framing/Rough-in10/29/199910/29/199910/29/1999PPART
Details
PER LINDA R/I INSP Cabo And. Issues
BLD-Conference10/25/199910/25/199910/25/1999PPASS
Details
jeff ###-#### pager hand rails @ ramps and ramp curbing
FIRE-Conference10/5/199910/6/199910/6/1999AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/05/1999 at 13:54:02. Contact: . Not a fire conference
BLD-Framing/Rough-in10/1/199910/4/199910/4/1999APART
Details
Tad ###-#### made ok for the restroom area only
INSP - Foundation9/2/19999/2/19999/2/1999PFAIL
DetailsWes Worcester
09/02/99 342 - tad house--###-#### pager-ramp .... met w/Perry, no found
Telephone call  8/30/1999
CALLED ACHD. THIS SCHOOL IS EXEMPT. NO FEES ARE REQUIRED AT ACHD.
Issue PAID IN FULL permit  8/30/1999
Print Occupancy Form  8/30/1999
PLANS/APPL TAKEN TO FRONT DESK  8/30/1999 PASS
Plan resubmittals received  8/30/1999 PASS
RECEIVED RECORDED RECORD OF SURVEY FOR PROPERTY LINE ADJUSTMENT AND 20 FOOT EASEMENT FOR ACCESS PER AGREEMENT SIGNED BY MAYOR BRENT COLES. MLO
Inspection Record Card- Bld  8/30/1999
Routing - PLAN CHECK7/26/1999 8/30/1999 PASS
PLAN REVIEW COMMENTS SATISIFED EXCEPT FOR ACCESS TO PROPERTY BY EASEMENT AGREEMENT. 7-26-99 MLO
Telephone call  8/30/1999
they called jeff jones he told them they would be ready in 1/2 hour
Plan assigned to (MLO)6/14/1999 8/30/1999 PASS
DetailsMike Otto
THIS PROJECT HAS BEEN APPROVED AFTER RECIEPT OF PROPERTY LINE ADJUSTMENT AND 20 FOOT ACCESS EASEMENT IN ACCORDANCE WITH RECORD OF SURVEY INSTRUMENT # 99086410. - 8/30/99 MLO.
Routing - FIRE8/25/1999 8/25/1999 PASS
Plan resubmittals received  7/26/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM BEN HILL OF ARROWROCK ARCHITECTS, FORWARDED SAME TO MIKE OTTO. DAR 7/26/99
Plan Review Completed(1st rev)  7/15/1999 FAIL
Routing - FIRE7/13/1999 7/15/1999 FAIL
UFC ISSUES WITH HYDRANT LOCATION/S, FIRE APPARATUS ACCESS ON THE PROPERTY, CHEMICAL STORAGE CLARIFICATIONS (POOL). PLANS RETURNED TO PLAN CHECK.
Plan resubmittals requested  7/13/1999 FAIL
CORRECTIONS FAXED AND MAILED TO ARCHITECT.
Routing - PLAN CHECK6/25/1999 7/12/1999 FAIL
Routing - PLUMBING6/25/1999 6/25/1999 PASS
Routing - PLANNING6/21/1999 6/24/1999 PASS
Routing - PUBLIC WORKS6/14/1999 6/21/1999 PASS
Plan assigned to (MYS)6/11/1999 6/14/1999
DetailsMarlene Southard
Plan routing begun/TENANTS6/14/1999 6/14/1999
Plans ACCEPTED BY PLAN TECH  6/14/1999 PASS
REQUIRES RECORD DECLARATION FORM. FAXED ONE TO BEN HILL. KMM
Received Certificate of Value  6/11/1999 PASS
Application received  6/11/1999
Case Summary (BLD)    PEND