Permit NumberBLD99-01714
StatusFinaled
Name FIRST PRESBYTERIAN CHURCH
Site Address 950 W STATE ST
Project NameFIRST PRES. CHURCH
Customer Number 
ePlanReviewNo
Description
(FIRST PRESBYTERIAN CHURCH - PROMENADE INTERIOR FINISH) Fire sprinklers used to substitute for 1-hr fire-resistive construction of the building. To complete the interior finish of the promenade and associated office areas. Work is to include interior nonbearing walls, suspended ceilings, interior doors, interior windows, interior finishes, and a new structural column with associated footing, beam modifications, and attachments. The location of fire sprinkler heads shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-443-99 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/10/2008  
Case Summary (BLD)  7/12/2007  
Case Summary (BLD)  7/12/2007  
Fee Review-notes6/14/1999 4/17/2000 DONE
BLD-Final2/4/20002/7/20002/7/2000APASS
Details
Church - done hardware installed and elec signed off 2/10/00 10:11:07 AM
Letter of compliance  2/4/2000 DONE
Letter of Compliance #18355 issued 2-4-00.
Telephone call  1/20/2000 DONE
Talked w/Paul Hoffman re: unfinished items on project - heads up on his temp. occ.
BLD-Conference1/6/20001/6/20001/6/2000APASS
Details
with arch about temp 45 day call made I explained required signoffs and proceedures.
Temporary occupancy  11/10/1999 PART
Temp. Occ. Cert. #3940 issued 11-10-99 to First Presbyterian Church.
BLD-Final11/9/199911/9/199911/9/1999PPART
Details
dwayne ###-#### Ok for temp occ. Ele. C/N in force.
BLD-Final11/2/199911/3/199911/4/1999PFAIL
Details
dwaine ###-#### temp occ Exit doors do not operate correctly.
FIRE-Final Inspection10/29/199911/1/199911/1/1999PPASS
DetailsRick Jackson
RE-INSP FN-- ###-####--DWAYNE Occupancy approved
BLD-Framing/Rough-in10/26/199910/27/199910/27/1999AFAIL
Details
Dwayne ###-#### C/N issued seizmic slack wires missing and diffuser to grid connection
FIRE-Alarm Testing10/25/199910/26/199910/26/1999PFAIL
DetailsRick Jackson
ALARMCO ###-#### Duct detectors for AHU's not installed
FIRE-Final Inspection10/20/199910/25/199910/25/1999AFAIL
DetailsRick Jackson
FN FIRE ALARMCO-- ###-#### Exit light; emergency lights; alarm plans; sprinkler room 103; occupant load sign.
INSP - Framing/Rough-in8/26/19998/26/19998/26/1999PPART
Details
08/26/99 338 - need to write correction for new contractor
INSP-Conference8/27/1999 8/26/1999 PART
conf on the un-completed parts of the prior permit bld97-1561 c/n to be issued on the corrections to be made
Issue PAID IN FULL permit  7/9/1999
Routing - PLAN CHECK6/29/1999 6/29/1999
PLANS/APPL TAKEN TO FRONT DESK  6/29/1999 PASS
Plan assigned to (CJW)6/24/1999 6/29/1999 PASS
DetailsCarl Westfall
06/29/99 14:28:07 CJW - this action updated by action script from <<>> in Case No. BLD99-1714
Inspection Record Card- Bld  6/29/1999
Telephone call  6/29/1999 PASS
talked to paul to verify plans are ready
Print Occupancy Form  6/29/1999
Plan Review Completed(1st rev)  6/28/1999 PASS
Routing - FIRE6/25/1999 6/28/1999 PASS
testing condition printout  6/25/1999
Print permit w/o conditions  6/25/1999
Plan assigned to (MYS)6/14/1999 6/24/1999
DetailsMarlene Southard
Plan Reviewer's activity  6/24/1999 PASS
UBC plan review started June 24, 1999 and finished June 25, 1999. The drawings were approved with conditions. See the conditions list.
Routing - PLAN CHECK6/24/1999 6/24/1999 PASS
Plan routing begun/TENANTS  6/24/1999
Route to PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  6/14/1999 PEND
Left message to Paul Hoffman to let him no that A6.2 was not in the 2 set of plans that were taken in. (Stone Details) Asked for a letter that it does not need to be attached to the plans.
Application received  6/14/1999
Received Certificate of Value  6/14/1999 PASS