Case Summary (BLD) | | | 11/10/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 7/12/2007 | | |
|
|
|
|
Case Summary (BLD) | | | 7/12/2007 | | |
|
|
|
|
Fee Review-notes | 6/14/1999 | | 4/17/2000 | | DONE |
|
|
|
|
BLD-Final | 2/4/2000 | 2/7/2000 | 2/7/2000 | A | PASS |
|
|
|
Church - done hardware installed and elec signed off 2/10/00 10:11:07 AM
|
Letter of compliance | | | 2/4/2000 | | DONE |
|
|
|
Letter of Compliance #18355 issued 2-4-00.
|
Telephone call | | | 1/20/2000 | | DONE |
|
|
|
Talked w/Paul Hoffman re: unfinished items on project - heads up on his temp. occ.
|
BLD-Conference | 1/6/2000 | 1/6/2000 | 1/6/2000 | A | PASS |
|
|
|
with arch about temp 45 day call made I explained required signoffs and proceedures.
|
Temporary occupancy | | | 11/10/1999 | | PART |
|
|
|
Temp. Occ. Cert. #3940 issued 11-10-99 to First Presbyterian Church.
|
BLD-Final | 11/9/1999 | 11/9/1999 | 11/9/1999 | P | PART |
|
|
|
dwayne ###-#### Ok for temp occ. Ele. C/N in force.
|
BLD-Final | 11/2/1999 | 11/3/1999 | 11/4/1999 | P | FAIL |
|
|
|
dwaine ###-#### temp occ Exit doors do not operate correctly.
|
FIRE-Final Inspection | 10/29/1999 | 11/1/1999 | 11/1/1999 | P | PASS |
Rick Jackson
|
|
|
RE-INSP FN-- ###-####--DWAYNE Occupancy approved
|
BLD-Framing/Rough-in | 10/26/1999 | 10/27/1999 | 10/27/1999 | A | FAIL |
|
|
|
Dwayne ###-#### C/N issued seizmic slack wires missing and diffuser to grid connection
|
FIRE-Alarm Testing | 10/25/1999 | 10/26/1999 | 10/26/1999 | P | FAIL |
Rick Jackson
|
|
|
ALARMCO ###-#### Duct detectors for AHU's not installed
|
FIRE-Final Inspection | 10/20/1999 | 10/25/1999 | 10/25/1999 | A | FAIL |
Rick Jackson
|
|
|
FN FIRE ALARMCO-- ###-#### Exit light; emergency lights; alarm plans; sprinkler room 103; occupant load sign.
|
INSP - Framing/Rough-in | 8/26/1999 | 8/26/1999 | 8/26/1999 | P | PART |
|
|
|
08/26/99 338 - need to write correction for new contractor
|
INSP-Conference | 8/27/1999 | | 8/26/1999 | | PART |
|
|
|
conf on the un-completed parts of the prior permit bld97-1561 c/n to be issued on the corrections to be made
|
Issue PAID IN FULL permit | | | 7/9/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 6/29/1999 | | 6/29/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/1999 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 6/24/1999 | | 6/29/1999 | | PASS |
Carl Westfall
|
|
|
06/29/99 14:28:07 CJW - this action updated by action script from <<>> in Case No. BLD99-1714
|
Inspection Record Card- Bld | | | 6/29/1999 | | |
|
|
|
|
Telephone call | | | 6/29/1999 | | PASS |
|
|
|
talked to paul to verify plans are ready
|
Print Occupancy Form | | | 6/29/1999 | | |
|
|
|
|
Plan Review Completed(1st rev) | | | 6/28/1999 | | PASS |
|
|
|
|
Routing - FIRE | 6/25/1999 | | 6/28/1999 | | PASS |
|
|
|
|
testing condition printout | | | 6/25/1999 | | |
|
|
|
|
Print permit w/o conditions | | | 6/25/1999 | | |
|
|
|
|
Plan assigned to (MYS) | 6/14/1999 | | 6/24/1999 | | |
Marlene Southard
|
|
|
|
Plan Reviewer's activity | | | 6/24/1999 | | PASS |
|
|
|
UBC plan review started June 24, 1999 and finished June 25, 1999. The drawings were approved with conditions. See the conditions list.
|
Routing - PLAN CHECK | 6/24/1999 | | 6/24/1999 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 6/24/1999 | | |
|
|
|
Route to PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 6/14/1999 | | PEND |
|
|
|
Left message to Paul Hoffman to let him no that A6.2 was not in the 2 set of plans that were taken in. (Stone Details) Asked for a letter that it does not need to be attached to the plans.
|
Application received | | | 6/14/1999 | | |
|
|
|
|
Received Certificate of Value | | | 6/14/1999 | | PASS |
|
|
|
|