Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01752
StatusFinaled
Name MICRON TECH
Site Address 8000 S FEDERAL WAY
Project NameMIC #5 (2ND FL.)
Customer NumberPCS 2497
ePlanReviewNo
Description
MICRON BUILDING #5 - 2ND FL. QA OFFICE REMODELING - (PROJECT #05-992497) TO DEMO AND REMOVE THE INTERIOR COMMON PARTITIONS AND DOORS BETWEEN OFFICES 201D, 201E, 201G AND OPEN OFFICE AREA 201A. THIS PERMIT IS ALSO TO RELOCATE THE COMMON INTERIOR PARTITIONS AND DOORS BETWEEN OFFICES 201B, 201C AND OPEN OFFICE AREA 201A APPROXIMATELY 5 FEET TO THE WEST. THIS DEMO AND RECONSTRUCTION IS TO ENLARGE OPEN OFFICE AREA 201A (MATERIALS PROGRARIMING) FROM 1710 SQ. FT. TO 2865 SQ. FT.. TO DEMO AND REMOVE THE COMMON INTERIOR PARTITIONS AND DOOR BETWEEN Q. A. CONFERNCE ROOM 210Q AND OPEN OFFICE AREA 210J (QUALITY ASSURANCE). THIS DEMO AND RECONSTRUCTION IS TO ENLARGE THE QUALITY ASSURANCE OPEN OFFICE AREA FROM 3350 SQ. FT. TO 3610 SQ. FT.. THIS PERMIT IS ALSO TO REMOVE A 4 FOOT BY 7 FOOT SECTION OF THE TWO-HOUR AREA SEPARATION WALL BETWEEN THESE TWO OPEN OFFICE AREAS AND TO INSTALL A NEW 90 MINUTE RATED DOOR ASSEMBLY. THIS WORK IS BEING DONE ON THE SECOND FLOOR OF BUILDING #5 BETWEEN GRID LINES 7&12 AND B&D. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. PC#451-99/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/16/1999 5/2/2000 DONE
FIRE-Final Inspection1/14/20001/14/20001/14/2000APASS
DetailsRick Jackson
Letter of compliance  1/14/2000 DONE
Letter of Compliance #18333 issued 1-14-00.
BLD-Final1/12/20001/13/20001/13/2000PPASS
DetailsJim Storey
###-####
BLD-Final12/30/19991/3/20001/3/2000AFAIL
DetailsJim Storey
ernie ###-####
FIRE-Final Inspection12/14/199912/15/199912/15/1999AFAIL
DetailsRick Jackson
###-#### 10:00 Detector required on both sides of door.
BLD-Final12/14/199912/15/199912/15/1999AFAIL
DetailsJim Storey
###-#### 10:00 Smoke detectors required both sides of 90 min. door for mag hold back.
BLD-Final10/5/199910/5/199910/5/1999PNR
Details
Curt Stegerwald ###-#### page when you get there will recall for 301
Receive PAYMENT IN FULL  9/9/1999 DONE
INSP - Framing/Rough-in9/2/19999/3/19999/3/1999APART
DetailsJim Storey
09/03/99 301 - shaft wall ok
INSP - Final8/16/19998/16/19998/16/1999PPART
DetailsJim Storey
08/16/99 301 - ok pending others
INSP - Final7/30/19998/5/19998/6/1999AFAIL
DetailsJim Storey
08/05/99 301 - c/n corridor penatrations/ ceilling ok
Issue & PRINT FEE-DUE permit  7/20/1999
Inspection Record Card- Bld  7/19/1999
PLANS/APPL TAKEN TO FRONT DESK  7/19/1999 PASS
Telephone call  7/19/1999
e-mailed Micron permit ready
Routing - PLAN CHECK7/16/1999 7/19/1999 PASS
Print Occupancy Form  7/19/1999
Plan assigned to (JCM)6/17/1999 7/19/1999 PASS
DetailsJohn Menard
Routing - FIRE7/15/1999 7/16/1999 PASS
Plan Reviewer's activity  7/15/1999 PASS
REVIEWED RESUBMITTALS AND APPROVED WITH ATTACHED REQUIREMENT LIST.
Plan resubmittals received  7/14/1999
RECEIVED FOUR COPIES OF FOR INFORMATION ONLY SHEET FOR SPRINKLER PLAN. TWO COPIES OF REVISED SHEETS M2.0 M2.1, E2.0, E2.1, E2.2, E2.3. ROUTED TO JOHN M. KMM
Plan resubmittals received  6/30/1999 PEND
Received plan resubmittals from Micron, forwarded same to John Menard
Plan Review Completed(1st rev)  6/24/1999 FAIL
Routing - FIRE6/24/1999 6/24/1999 FAIL
UFC code issues.
Routing - PLAN CHECK6/18/1999 6/24/1999 PEND
Plan resubmittals requested  6/24/1999 PEND
E-MAILED DAVE WHITE WITH THE ATTACHED PLAN REVIEW COMMENTS REQUESTING REVISIONS.
Routing - PUBLIC WORKS6/17/1999 6/18/1999 PASS
Plan routing begun/TENANTS  6/17/1999 PASS
Plan assigned to (MYS)6/16/1999 6/17/1999
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  6/17/1999 PASS
Application received  6/16/1999
Received Certificate of Value  6/16/1999 PASS