BLD-Final | 2/28/2000 | 2/29/2000 | 2/29/2000 | P | PASS |
Wes Worcester
|
|
|
###-#### chip\\ C/C issued. 3/1/00 11:10:13 AM
|
BLD-Final | 2/16/2000 | 2/17/2000 | 2/17/2000 | P | CANC |
Wes Worcester
|
|
|
###-#### Disp set to [CANC] by a contractor via Hello! on 02/17/2000 at 06:35:41.
|
BLD-Grading Inspection | 2/16/2000 | 2/16/2000 | 2/16/2000 | | BOND |
Rita DeYoung
|
|
|
Rough grading has been completed and roof drain connection to street storm drain verified. Contractor has submitted $1000.00 surety that was recommended by the engineer. The grading and drainage is therefore conditionally approved by Public Works.
|
BLD-Final | 2/10/2000 | 2/11/2000 | 2/11/2000 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 14:11:04. Contact: ###-####. Not approved by Terry Records, until after 3:30 pm. 2/14/00 2:00:16 PM
|
BLD-Final | 2/9/2000 | 2/10/2000 | 2/10/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### not ready will recall
|
BLD-Framing/Rough-in | 12/13/1999 | 12/13/1999 | 12/13/1999 | P | PASS |
Russ Owen
|
|
|
STAIRS BILL ###-#### Stairs ok.
|
BLD-Energy code compliance | 10/29/1999 | 11/1/1999 | 11/1/1999 | A | PASS |
Russ Owen
|
|
|
chip ###-#### Energy code compliance ok to sheetrock will need to have stairs inspected when completed
|
BLD-Energy code compliance | 10/26/1999 | 10/27/1999 | 10/27/1999 | P | PART |
Wes Worcester
|
|
|
merit homes- chip cell ###-#### after 2pm BCHE infiltration package Ok
|
BLD-Framing/Rough-in | 10/26/1999 | 10/27/1999 | 10/27/1999 | P | PASS |
Wes Worcester
|
|
|
merit homes--- ###-#### fr insp after 2 pm
|
Receive PAYMENT IN FULL | | | 10/14/1999 | | DONE |
|
|
|
|
INSP - Foundation | 8/19/1999 | 8/19/1999 | 8/19/1999 | P | PASS |
Russ Owen
|
|
|
08/19/99 407 - Scheduled by Hello!.
|
INSP - Foundation | 8/18/1999 | 8/19/1999 | 8/19/1999 | A | PASS |
Russ Owen
|
|
|
08/19/99 407 - FOOTING. KEVIN ###-####
|
INSP - Foundation | 8/9/1999 | 8/9/1999 | 8/9/1999 | P | FAIL |
Russ Owen
|
|
|
08/09/99 407 - left corrections,property pins,engineer approval.
|
INSP - Foundation | 8/6/1999 | 8/6/1999 | 8/6/1999 | P | FAIL |
Tom Arcoraci
|
|
|
08/06/99 408 - no plans
|
INSP - Foundation | 7/29/1999 | 7/29/1999 | 7/29/1999 | P | PASS |
Russ Owen
|
|
|
07/29/99 407 - footings ok,need to string line property pins next insp.
|
Issue PAID IN FULL permit | | | 7/28/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/13/1999 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/13/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/13/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/1999 | | PASS |
|
|
|
|
Plan assigned to (DJO) | 6/16/1999 | | 7/13/1999 | | PASS |
Dan Overy
|
|
|
07/13/99 10:07:23 DJO - this action updated by action script from <<>> in Case No. BLD99-1756
|
Routing - PUBLIC WORKS | 6/16/1999 | | 7/2/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 7/2/1999 | | 7/2/1999 | | PASS |
|
|
|
gave to roger and angie to do set-backs. 7/2/99
|
Routing - PUBLIC WORKS GRADING | 7/1/1999 | | 7/1/1999 | | PASS |
Rita DeYoung
|
|
|
approved as category 3
|
Routing - PUBLIC WORKS GRADING | 6/16/1999 | | 6/16/1999 | | FAIL |
Rita DeYoung
|
|
|
Grading plan indicates up to 5 feet of fill. Sub approval restricts cuts and fills to 3 feet max. Soils report indicates highly expansive clay but does not indicate what method will be used to deal with it. Several other minor deficiencies in soils report. Talked to Roger Smith at Pinnacle engineers and wrote letter detailing complete list of deficiencies.
|
Application received | | | 6/16/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 7/2/1999 | | | | PEND |
|
|
|
|