Fee Review-notes | 7/27/1999 | | 5/9/2001 | | DONE |
|
|
|
drainage fees were overlooked
|
BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PASS |
Jim Storey
|
|
|
###-####--dave-- found wall insp walls ok retaining. 6/9/00 11:37:28 AM
|
BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PASS |
Jim Storey
|
|
|
###-####--dave-- found wall insp
|
BLD-Footing | 6/1/2000 | 6/2/2000 | 6/2/2000 | P | PASS |
Jim Storey
|
|
|
retaining wall ###-####
|
BLD-Final | 3/9/2000 | 3/10/2000 | 3/10/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 16:00:48. Contact: ###-####.
|
BLD-Final | 2/25/2000 | 2/25/2000 | 2/25/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### drainage, ext. steps, energy code, permit for completion of basement. 2/28/00 2:11:25 PM
|
BLD-Framing/Rough-in | 1/14/2000 | 1/14/2000 | 1/14/2000 | P | FAIL |
Carl Dependahl
|
|
|
re-bar-- insp jack ###-####---cancel per jack Need compaction/soils; concrete "sub" has pulled off job. 1/18/00 9:12:44 AM
|
BLD-Footing | 1/4/2000 | 1/4/2000 | 1/4/2000 | P | PART |
Carl Dependahl
|
|
|
part, south side ret. wall ftg; need further clarification of eng'g; how is excav & slope above wall to be performed? 342' s area
|
BLD-Footing | 12/23/1999 | 12/23/1999 | 12/23/1999 | P | PART |
Carl Dependahl
|
|
|
Partial ftg., South side took for Russ.
|
BLD-Footing | 12/22/1999 | 12/23/1999 | 12/23/1999 | P | CANC |
Russ Owen
|
|
|
randy ###-#### or jack ###-####. Transfer to Carl D. 340.
|
BLD-Framing/Rough-in | 10/27/1999 | 10/27/1999 | 10/27/1999 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 10/27/1999 at 10:44:10. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/21/1999 | 10/22/1999 | 10/22/1999 | A | FAIL |
Wes Worcester
|
|
|
Ogata construction ###-#### #2 & #4 previous C/N not done
|
BLD-Framing/Rough-in | 10/19/1999 | 10/20/1999 | 10/20/1999 | A | FAIL |
Wes Worcester
|
|
|
gib--- - ###-#### fr insp-- Nailing, Truss engineering, stair rise landing etc.
|
BLD-Framing/Rough-in | 10/6/1999 | 10/6/1999 | 10/6/1999 | P | PART |
Wes Worcester
|
|
|
sheer wall \\###-#### Gibb
|
BLD-Framing/Rough-in | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | FAIL |
Wes Worcester
|
|
|
BRITTA-- ###-#### SHEAR WALL INSP need approved plan w/ revisions on site
|
BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 | A | FAIL |
Wes Worcester
|
|
|
BIRTTA- ###-#### SHEAR WALL INSP Need approved plan and engineering do shear per plan and engineering
|
Receive PAYMENT IN FULL | | | 9/2/1999 | | |
|
|
|
|
INSP - Concrete | 8/12/1999 | 8/13/1999 | 8/13/1999 | P | PART |
Wes Worcester
|
|
|
08/13/99 342 - BASEMENT WALL, READY AFT. 1PM. JAKE ###-####X17145
|
INSP - Foundation | 8/10/1999 | 8/10/1999 | 8/10/1999 | | PART |
Wes Worcester
|
|
|
/ / 342 - WILL CALL WHEN READY poured per eng letter
|
INSP - Foundation | 8/9/1999 | 8/10/1999 | 8/9/1999 | A | FAIL |
Wes Worcester
|
|
|
08/10/99 342 - 1ST THING PLEASE. JAKE ###-#### X17145....fw4.35 incorrec
|
INSP - Foundation | 8/6/1999 | 8/6/1999 | 8/6/1999 | P | FAIL |
Wes Worcester
|
|
|
08/06/99 342 - DAVE ###-#### READY AT 2PM. plan and eng flawed, need e
|
INSP - Foundation | 7/30/1999 | 8/2/1999 | 8/2/1999 | P | FAIL |
Wes Worcester
|
|
|
08/02/99 342 - DAVE ###-#### EARLY PM IF POSSIBLE hole is wrong
|
CHANGE STATUS TO (F) | | | 7/27/1999 | | |
|
|
|
drainage fees were overlooked
|
Issue PAID IN FULL permit | | | 7/21/1999 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/20/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 7/20/1999 | | PASS |
|
|
|
ZONING FINISHED REVIEW AND SENT PLANS BACK TO PLAN CHECK
|
Inspection Record Card- Bld | | | 7/20/1999 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/20/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/1999 | | PASS |
|
|
|
|
Plan assigned to (DJO) | 6/17/1999 | | 7/20/1999 | | PASS |
Dan Overy
|
|
|
07/20/99 13:32:01 DJO - this action updated by action script from <<>> in Case No. BLD99-1763
|
Plan Reviewer's activity | | | 7/19/1999 | | PEND |
|
|
|
plans have never been to planning and zoning. returned to angie.
|
Routing - PLANNING | 7/19/1999 | | 7/19/1999 | | PASS |
|
|
|
routed back to planning for setback approval. dave abo and roger jones passed 7/19/99
|
Routing - PLANNING | 7/19/1999 | | 7/19/1999 | | PASS |
|
|
|
angie gave to dave abo. 7/19/99 dave abo and roger passed
|
Routing - PUBLIC WORKS GRADING | 7/12/1999 | | 7/12/1999 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 1.
|
Routing - PUBLIC WORKS GRADING | 6/17/1999 | | 6/17/1999 | | FAIL |
Rita DeYoung
|
|
|
No soils report submitted with application. Left message on contractor's phone asking for 2 copies of soils report and additional copy of grading plan.
|
Application received | | | 6/17/1999 | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/17/1999 | | 6/17/1999 | | PASS |
|
|
|
sent to terry records for hillside review.
|