Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01767
StatusFinaled
Name DENNIS ADAMS
Site Address 923 N LIBERTY RD
Project NameMAN. PARAMEDICS QTRS
Customer Number 
ePlanReviewNo
Description
TO REMOVE EXISTING PARAMEDICS QUARTERS & FOUNDATION. TO INSTALL AN ENGINEERED FOUNDATION & HOLD-DOWN SYSTEM AND PERIMETER WOOD ENCLOSURE WALLS FOR A 2,249 SQ. FT., PRE-MANUFACTURED, STATE OF IDAHO REVIEWED, APPROVED AND TAGGED, MODULAR UNIT FOR USE AS AN ON-CALL PARAMEDICS SERVICE UNIT. INCLUDES LIVING QUARTERS, OFFICE, EATING/FOOD PREP AREA. SERVICE PROVIDES PERSONEL ON CALL SAME AS FIRE STATION PERSONEL. PROVIDE SEWER HOOK UP AND ELECTRICAL. ALL PER APPROVED PLANS, NOTES & ATTACHMENTS. DRH98-0245 PC#454-99/drs IDAHO TAG #7384CC
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/10/2007  
Fee Review-notes6/17/1999 5/5/2000 DONE
plm and mech na--there were permits for all three subs...lh
(F) Reprint permit  5/5/2000 DONE
BLD-Final10/11/199910/11/199910/11/1999PPASS
DetailsCarl Dependahl
cecil ###-#### fn occ insp
Letter of compliance  10/11/1999 DONE
Letter of Compliance #16842 issued 10-11-99.
BLD-Foundation10/6/199910/6/199910/6/1999PFAIL
DetailsCarl Dependahl
Cecil ###-#### need site plan
FIRE-Conference10/6/199910/5/199910/5/1999PPASS
DetailsCarl Dependahl
conference with contractor and Joe Tawney re insp, jurisdiction for manufactured structure swo ok
FIRE-Final Inspection9/20/19999/20/19999/21/1999PFAIL
DetailsJoe Tawney
cecel ###-#### Door hardware, smoke detectors
Issue PAID IN FULL permit  8/30/1999
Routing - PLAN CHECK8/27/1999 8/27/1999 PASS
Received plans back from re-submittal to PW, approved. Processing for issuance of permit.
Additional plans submitted  8/27/1999
Received complete engineering design calcs from Briggs Engineering for entire building used to design building for state approved modular unit and used by Briggs Eng. to design foundation.
PLANS/APPL TAKEN TO FRONT DESK  8/27/1999 PASS
Routing to permit desk for issuance of permit.
Inspection Record Card- Bld  8/27/1999
Telephone call  8/27/1999
Conference call w/ Vince Johnson, GRN Assoc. Arch. & Stan McCuthison, Briggs Engineers. Stan said the five sheets I had with plans were all that involved the foundation. I explained that the cover sheet refered to 16 pages;the design sheets did not reflect the calculations to verify how numbers were reached for design; the data refered to shear walls used as part of the design for seismic and I had no reference on any plans regarding shear wall or locations; even though the modular unit itself was reviewed and approved by the state, a complete copy of the engineering data for the structure and it's support system was needed for the file package to go with the modular unit plans received that would go to the city records files. Stan said he would send mee the package this A.M.
Telephone call  8/27/1999
I called Mark VanGulick of Kreizenbeck Constructors for copy of his engineering for project. He had told me on 8/25/99 that he had complete set. Mark had checked his and found that he only had the information I have. This is the same condition as the architect, Vince Johnson.
Telephone call  8/27/1999
Called back Dennis Adams to explain what has occurred and that plans should be back to me today and I would process as soon as I had received & reviewed the project engineering package.
Meeting  8/27/1999
Talked with Jim Rich concerning what legal description he needed and explained to him the property was owned by SARMC and that Dennis Adams had provide a letter to this effect to P&Z when reviewed for approval. I also explained to Jim that this building basically was being installed over the previous site of the original 1994 paramedics quarters that has been removed for this new building. I had the 1994 legal description in my file and Jim Said this would satisfy his needs and would approve plans. He needs to route the plans to Louise Waldorf for Sewer feee analysis - most likely in other sewer district and is a matter of procedure for record keeping purposes and then the plans will be returned to me.
Telephone call  8/27/1999
Call from Dennis Adams of SARMC to find out what was required by PW for them to approve the plans. I read him the comment on the screen inserted by Dave Radford in behalf of Jim Rich concerning evidence of leagal lot. I told Dennis I would go and talk to Jim and see what was needed and call him back. I also told Dennis I was waiting for a copy of the full engineering & calcs for the project for my file and had not received it yesterday as promised and that I would need this to final out permit for issuance. Dennis said he could ca;ll Stan at Briggs Engineering to follow up.
Routing - PUBLIC WORKS8/27/1999 8/27/1999 PASS
Print Occupancy Form  8/27/1999
Routing - PLAN CHECK8/25/1999 8/26/1999 PEND
Received new submittals & engineering for foundation & env closure walls from the architect. Inserted into plans for review. Approved as noted and attached. Routing back to Public works for re- review.
Print Pending Permit.LaserJet4  8/26/1999 PASS
Approved as noted & attached.
Plan assigned to (DRS)6/17/1999 8/26/1999 PASS
DetailsDan Stuart
08/26/99 06:50:57 DRS - this action updated by action script from <<>> in Case No. BLD99-1767
Routing - PLANNING8/25/1999 8/25/1999 PASS
x-re. drh98-0245
Plan resubmittals received  8/24/1999
RECEIVED TWO COPIES OF REVISED SHEETS A1.0 AND A2.1. ONE COPY OF SHEET F-1 ONE COPY OF RESPONSE LETTER AND ONE COPY OF CALCULATIONS. ROUTED TO DAN S. KMM
Telephone call  8/20/1999
Call from architect, Vince Johnson, stating that new plan submittals will be received the first of next week, 8/23/99.
Routing - PLAN CHECK7/30/1999 7/30/1999 FAIL
Received plans back from Fire Code paln reviewer, approved as noted. Waiting for response & resubmittals from architect. Plans on hold behind my desk.
Plan Review Completed(1st rev)  7/30/1999 FAIL
Failed for ubc, public works,planning issues. Sent back to Dan Stuart pending resumittals.
Routing - FIRE7/28/1999 7/29/1999 PASS
Plan Review Completed(1st rev)  7/29/1999
Telephone call  7/29/1999
call from Mark Van Gulik of Kreizenbeck constructors concerning the ability to do work governed by ACHD at the 923 Liberty site. I told him that work was not regulated by the Building dept. and that i hadn"t seen on the plans that any
Routing - PLAN CHECK7/23/1999 7/27/1999 FAIL
RESUBMITTALS REQUIRED. FAXED & MAILED PLAN REVIEW COMMENTS TO ARCHITECT FOR RESPONSE. FORWARDING FOR FIRE CODE REVIEW.
Plan resubmittals requested  7/27/1999
NEED INFORMATION & ENGINEERING FOR WOOD FOUNDATION SHOWN ON PLANS; ELEVATIONS; DRAINAGE; FOUNDATION VENTILATION; AND ACCESSIBILITY CONFIRMATION.
Routing - PLUMBING7/14/1999 7/19/1999 PASS
PREMIS PROTECTION AND THERMOL EXPANTION PROTECTION REQUIRED
Routing - PUBLIC WORKS7/12/1999 7/14/1999 FAIL
REQUIRES PROOF OF LEGAL LAND DIVISION PER JIM RICH. DAR 7/14/99
Plans ACCEPTED BY PLAN TECH  7/12/1999 PASS
RECEIVED TWO COPIES OF REVISED SHEETS A1.0 AND A2.1 WHICH ADDRESSED THE FOUNDATION SYSTEM AND SEWER HOOK UP. READY TO ROUTE TO PW. KMM
Application received  6/17/1999
Received Certificate of Value  6/17/1999
Plans ACCEPTED BY PLAN TECH  6/17/1999 HOLD
SHEETS A1.0, AND A2.1 ARE NOT SIGNED. NEED ENG. FOR FOUNDATION SYSTEM AND SEWER HOOK UP OR CIVIL SHEETS. CONTACTED ERIN MUGGLY OF THESE NEEDS. KMM 7-1-99 CONTACTED ERIN AT ###-#### REFRENCE ITEMS ABOVE. KMM 7-6-99 SPOKE WITH ERIN AT KRIZENBECKS. SHE STATED THAT PLANS ARE BEING REVISED. IF I DO NOT RECEIVE BY THE 16TH CALL MARK ABOUT WHAT IS GOING ON. KMM
Plan assigned to (MYS)6/17/1999 6/17/1999
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  6/17/1999