Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD99-01770
StatusFinaled
Name CROSSROADS CHRISTIAN CHURCH
Site Address 501 N CURTIS RD
Project NameCROSSROADS CHURCH
Customer Number 
ePlanReviewNo
Description
(CROSSROADS CHRISTIAN CHURCH) This building is not fire sprinklered. To convert a 2,300 square foot former office area into a church sanctuary (the original use). Work is to include platforms, steps, roof insulation, and a new exit door to the exterior all per approved drawings and plan review conditions on file. The maximum allowable occupant load of the sanctuary (280) shall be posted near the main exit. The remainder of the building is an assembly room, Sunday school classrooms, and accessory areas. PC-458-99 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/17/1999 5/5/2000 DONE
Permanent Occupancy 12/9/199912/9/1999 DONE
Details
BLD-Final12/8/199912/9/199912/9/1999APASS
DetailsCarl Dependahl
CAROL ###-#### Card to "owner".
Permanent occupancy  12/9/1999 DONE
Perm. Occ. Cert. #8046 issued 12-9-99 to Crossroads Christian Church.
FIRE-Final Inspection12/6/199912/6/199912/6/1999ACANC
DetailsRick Jackson
Schedule for 406.
FIRE-Final Inspection12/3/199912/6/199912/6/1999APASS
DetailsRick Jackson
Jerry ###-#### Reinsp. Ok for certificate of completion.
FIRE-Final Inspection11/17/199911/17/199911/19/1999PFAIL
DetailsRick Jackson
###-#### JERRY FN FIRE Final fail C/N issued.
BLD-Final11/17/199911/18/199911/18/1999AFAIL
DetailsCarl Dependahl
###-#### -JERRY HAYWARD FN OCC Fail, need fire.
FIRE-Final Inspection11/15/199911/16/199911/16/1999PCANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 11/15/1999 at 20:14:02. Contact: ###-####.not enough time to do inspection
INSP - Framing/Rough-in9/1/19999/2/19999/2/1999APART
DetailsCarl Dependahl
09/02/99 340 - Scheduled by Hello!. Contact phone is [3713758].
INSP - Framing/Rough-in8/17/19998/17/19998/17/1999 PART
DetailsJim Storey
/ / 301 - OK TO INSULATE PENDING OTHERS
INSP - Framing/Rough-in8/17/19998/17/19998/17/1999PFAIL
DetailsCarl Dependahl
08/17/99 340 - JERRY ###-####; nr, gave to 301
Issue PAID IN FULL permit  7/16/1999
Telephone call  7/15/1999
called Barbara at ###-#### and told her permit was ready
PLANS/APPL TAKEN TO FRONT DESK  7/15/1999 PASS
Print Occupancy Form  7/15/1999
Routing - PLAN CHECK7/12/1999 7/15/1999
Inspection Record Card- Bld  7/15/1999
Plan assigned to (CJW)6/24/1999 7/15/1999 PASS
DetailsCarl Westfall
07/15/99 12:35:12 CJW - this action updated by action script from <<>> in Case No. BLD99-1770
Plan Review Completed(1st rev)  7/12/1999 PASS
Routing - FIRE7/8/1999 7/12/1999 PASS
Routing - PLANNING7/1/1999 7/8/1999 PASS
approved.
Plan Reviewer's activity  7/1/1999 PASS
UBC plan review started June 30, 1999 and finished July 1, 1999. The drawings were approved with conditions. See the conditions list.
Print permit w/o conditions  7/1/1999
testing condition printout  7/1/1999
Routing - PLAN CHECK6/25/1999 7/1/1999 PASS
Routing - PUBLIC WORKS6/25/1999 6/25/1999 PASS
Plan assigned to (MYS)6/17/1999 6/24/1999
DetailsMarlene Southard
Plan routing begun/TENANTS  6/24/1999
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  6/21/1999 PASS
PLAN WERE NOT STAMPED OR SIGNED. CALLED AND LEFT A MESSAGE WITH CURT LANDRETH AT ###-#### THAT THIS NEEDS TO BE TAKED CARE OF BEFORE I CAN ROUTE PLANS. KMM RECEIVED STAMPED AND SIGNED PLANS FROM ARCHITECT. DAR 6/21/99
Received Certificate of Value  6/17/1999 PASS
Application received  6/17/1999
Recd Pcfee & Taken To Pln CK  6/17/1999