Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD99-01785
StatusFinaled
Name MCALVAIN CONSTRUCTION
Site Address 7990 W OVERLAND RD
Project NameLOWE'S
Customer Number 
ePlanReviewNo
Description
LOWE'S * TO CONSTRUCT A NEW 169,985 SQ. FT., ONE STORY RETAIL HARDWARE AND GARDEN STORE AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS BEING CONSTRUCTED OF A CONCRETE SLAB FLOOR, CONCRETE MASONRY WALLS AND STEEL FRAME ROOF SYSTEM. THIS BUILDING IS FULLY FIRE SPRINKLERED. THE SPRINKLERS ARE BEING USED FOR UNLIMITED AREA. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. PC#465-99/DRH97-0242/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/8/2016 DONE
Case Summary (BLD)  6/5/2014 DONE
Fee Review-notes6/18/1999 5/16/2000 DONE
Telephone call  5/5/2000 DONE
5/5called for final cert. will fax back some time next week
Telephone call  5/5/2000 DONE
called permit ready Matt Dubbe ###-#### need ACHD cert
Permanent occupancy UNPAID FEE  4/18/2000 DONE
Perm. Occ. Cert. #8196 issued 4-18-00 to Lowe's Hardware.
Permanent Occupancy 4/11/20004/11/2000 DONE
Details
BLD-Final4/11/20004/11/20004/11/2000APASS
DetailsCarl Dependahl
Ok for Perm. C/O
BLD-Final4/11/20004/11/20004/11/2000APASS
DetailsCarl Dependahl
Ok for perm. C/O.
Code Occupancy Approval  3/30/2000 PASS
Meets compliance with DRH99-00102
Temporary occupancy  3/21/2000 PART
Temp. Occ. Cert. #3994 issued 3-21-00 to Lowe's Hardware.
BLD-Final3/20/20003/20/20003/20/2000PPASS
DetailsJoe Tawney
Reinsp. ok for perm. occ.
BLD-Final3/20/20003/20/20003/20/2000PFAIL
DetailsCarl Dependahl
###-#### Ok for T/O; C/N other sig's, racks, etc. 3/21/00 9:28:12 AM
BLD-Final3/17/20003/17/20003/17/2000PFAIL
DetailsJoe Tawney
final fail fire extinguishers, align exit signs, fax of alarm signals.
BLD-Final3/16/20003/17/20003/17/2000PFAIL
DetailsCarl Dependahl
2 pm ###-#### Bryan
FIRE-Final Inspection3/6/20003/10/20003/10/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 03/06/2000 at 13:25:07. Contact: ###-####. Alarm test fail reprogram 2 floor switches on dry pipe systems & tamper switches on ostey valves. 3/14/00 11:22:30 AM
Code Occupancy Approval  2/29/2000 FAIL
Not ready. Still need to overseed north boundary - finish exterior of building- light poles, complete landscape island at store frontage, replace above grade h/c sign - should be bonding for temp. occupancy for overseeding approx. 3/10
BLD-Framing/Rough-in2/17/20002/18/20002/22/2000APART
DetailsCarl Dependahl
Ryan Murphy ###-#### ceiling grid insp Ceiling grid @ r.rm/training rm. ok. 2/23/00 11:07:18 AM
BLD-Framing/Rough-in2/2/20002/3/20002/3/2000APART
DetailsCarl Dependahl
bryan ###-#### fr Canopies ok; firestop walls per plan @ int. 2/4/00 11:18:35 AM
BLD-Framing/Rough-in1/21/20001/21/20001/21/2000PPART
DetailsCarl Dependahl
###-#### WIP; complete install of LTT straps @ wall(s) for canopy per detail- Keep C/N. 1/25/00 12:14:22 PM
BLD-Framing/Rough-in1/12/20001/12/20001/12/2000APART
DetailsCarl Dependahl
Lowe's- canopy's- complete sheathing WIP.
BLD-Framing/Rough-in1/10/20001/11/20001/11/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/10/2000 at 22:26:57. Contact: ###-####. West & North side canopy.. WIP.
BLD-Framing/Rough-in1/10/20001/10/20001/10/2000PPART
DetailsCarl Dependahl
###-#### ryan. Main canopy @ entry- framing (studs) ok- need spec. insp. For struct. Steel (pending).
Code Occupancy Approval  1/10/2000 FAIL
Still have 10% +/- landscaping to complete, mostly at the north boundary - some up against building and some repairs at south end and at edge of perimeter, need traffic direction arrows, stop bars and above grade h/c parking signs, also 7 place bike rack and at least 3 sidewalk ramps.
BLD-Framing/Rough-in12/22/199912/22/199912/22/1999PFAIL
DetailsCarl Dependahl
BRIAN ###-#### FR INSP WIP & canopies, looks ok; complete per plan C/N.
BLD-Framing/Rough-in12/14/199912/15/199912/15/1999AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/14/1999 at 16:42:10. Contact: ###-####. Canopy not complete, WIP walked job w/supt.
BLD-Conference12/8/199912/8/199912/8/1999APASS
DetailsCarl Dependahl
reviewed spec insp's; wip...
BLD-Framing/Rough-in11/8/199911/12/199911/12/1999APART
DetailsJim Storey
mark ###-#### masonary grout insp S/I no stop.
FIRE-Sprinkler Rough-in11/12/199911/12/199911/12/1999PPASS
DetailsJoe Tawney
page ###-#### --sam r/i---call 1st before insp Underground ok to cover.
BLD-Framing/Rough-in11/8/199911/10/199911/10/1999APART
DetailsCarl Dependahl
mark ###-#### masonary grout insp Spec. insp. Onsite.
BLD-Framing/Rough-in11/8/199911/9/199911/9/1999APART
DetailsCarl Dependahl
mark ###-#### masonary grout insp Strata onsite.
BLD-Other10/25/199910/29/199910/29/1999APART
DetailsCarl Dependahl
masonary grout mark ###-#### Spec. insp.
BLD-Other10/25/199910/28/199910/28/1999APART
DetailsCarl Dependahl
masonary grout mark ###-#### Strata onsite
BLD-Other10/25/199910/27/199910/27/1999APART
DetailsCarl Dependahl
marsonary grout mark ###-#### Strata onsite
BLD-Other10/25/199910/26/199910/26/1999APART
DetailsCarl Dependahl
masonary grout mark ###-####; spec insp onsite
BLD-Other10/25/199910/25/199910/25/1999PPART
DetailsCarl Dependahl
masonary grout mark ###-#### Ext. walls, spec. insp. Onsite
BLD-Framing/Rough-in10/11/199910/15/199910/15/1999APART
DetailsCarl Dependahl
masonary ground Mark ###-#### Strata onsite
BLD-Framing/Rough-in10/11/199910/14/199910/14/1999APART
DetailsCarl Dependahl
masonary ground ###-#### Poured W/O city insp. 10:40 am on site full time spec. insp.
BLD-Framing/Rough-in10/11/199910/13/199910/13/1999APART
DetailsCarl Dependahl
masonary ground Mark ###-#### Masonry- strata onsite
BLD-Framing/Rough-in10/11/199910/12/199910/12/1999APASS
DetailsCarl Dependahl
masonry ground Mark ###-#### WIP masonary strata onsite.
BLD-Other10/6/199910/7/199910/7/1999APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/06/1999 at 16:27:28. Contact: . WIP masonry wall; strata onsite engr approved mortar change.
BLD-Framing/Rough-in9/27/19999/28/19999/28/1999APART
DetailsTom Arcoraci
MARK-- ###-#### MASONARY GROUT INSP Spec insp. On site
BLD-Foundation9/16/19999/17/19999/17/1999APART
DetailsCarl Dependahl
INSP - Framing/Rough-in9/14/19999/15/19999/15/1999APART
DetailsCarl Dependahl
1ST LIFT SO. ELEVATION; T.S. COL'S NOT IN PLACE, WILL NEED REBUILD, STRATA ONSITE
INSP - Foundation9/13/19999/13/19999/13/1999PPART
DetailsCarl Dependahl
PENDING SPECIAL INSPCTN REPORT
INSP - Foundation9/9/19999/9/19999/9/1999PPART
DetailsCarl Dependahl
strata onsite - fnd. wall
INSP - Foundation9/9/19999/9/19999/9/1999PPART
DetailsCarl Dependahl
ftg....
INSP - Foundation9/8/19999/8/19999/8/1999PPART
DetailsCarl Dependahl
footing brian ###-####; MET W/ CHARLES, STRATA'S SPEC INSPECTOR. REVIEWED MASONRY CONST...WATCH FOR MORTAR PROBLEMS. AUTHORIZED STRATA TO STOP CONSTRUCTION IF SERIOUS NONCOMPLIANCE ISSUES ARISE.
INSP - Foundation9/3/19999/3/19999/3/1999PPART
DetailsCarl Dependahl
09/03/99 340 - brian ###-#### cell ft insp
INSP - Foundation9/1/19999/2/19999/2/1999PPART
DetailsCarl Dependahl
09/02/99 340 - RYAN ###-####; MTI ONSITE
INSP - Foundation8/30/19998/31/19998/31/1999APART
DetailsCarl Dependahl
08/31/99 340 - BRYAN ###-#### FOOTING
INSP - Foundation8/30/19998/30/19998/30/1999PFAIL
DetailsCarl Dependahl
08/30/99 340 - conf w/ Brian Murphy, Mcalvain Const; keep c/n
INSP - Foundation8/26/19998/27/19998/27/1999PFAIL
DetailsCarl Dependahl
08/27/99 340 - READY AROUND 12NOON. BRIAN ###-#### c/n, need plans
(F) Reprint permit  8/26/1999
Issue PAID IN FULL permit  8/25/1999
Routing - PLAN CHECK7/29/1999 8/23/1999 PASS
Plan assigned to (JCM)6/21/1999 8/23/1999 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  8/23/1999 PASS
Print Occupancy Form  8/23/1999
Inspection Record Card- Bld  8/23/1999
Plan resubmittals received  8/12/1999
RECEIVED ONE COVER LETTER, AND TWO COPIES OF THE PROPOSED MECHANICAL SMOKE REMOVAL SYSTEM FOR LOWE'S. ROUTED TO JOHN M. KMM
Plan resubmittals requested  8/11/1999 PEND
FAXED DAVID CARRILLO AT SCONZO-HALSTROM TO LET HIM KNOW THAT ADDITIONAL INFORMATION WAS REQUIRED TO FINISH THE PERMIT.
Plan resubmittals received  8/10/1999
RECEIVED TWO COPIES OF REVIESED SHEETS S-2.0, S-2.1, & S-5.4 G.0 THRU G.5, G.7 THRU G.10, G.16 AND B.18, E.3 & E.8. ONE COPY OF LETTER OF RESPPONSE, AND ONE EGRESS SUMMARY. ROUTED TO JOHN M. KMM
Routing - PLANNING7/28/1999 7/29/1999 PASS
approved per DRH97-0242 and DRH99-0102.
Plan Review Completed(1st rev)  7/28/1999 PASS
Routing - FIRE7/19/1999 7/27/1999 PASS
FED EXED OFFICE COPY TO FLOYD. ROUTED ISSUE COPY TO BILL A. TO HOLD. KMM 7-27-99 FAXED FLOYDS APPROVED REVIEW TO ARCH. KMM 7-28-99 RECEIVED PLANS BACK FROM FLOYD. ROUTED TO BILL A. KMM
Plan resubmittals requested  7/19/1999 PEND
MAILED A COPY OF THE PLAN REVIEW COMMENT LIST TO MATT DUBBE AT SCONZO/HALLSTOM ARCHITECTS REQUESTING REVISIONS.
Routing - PLAN CHECK7/12/1999 7/19/1999
Routing - PLUMBING7/7/1999 7/12/1999 PASS
post all water outlets in garden area off non-potable system, rp may be required if chemicals are used in garden area, water heater 8' above floor needs a permanently fastened ladder
Routing - PUBLIC WORKS7/1/1999 7/7/1999 PASS
Plans ACCEPTED BY PLAN TECH  7/1/1999 PASS
Routing - PLAN CHECK6/28/1999 7/1/1999
IN PLAN TECH. HOLD BOX WAITING FOR CIVIL SHEETS. KMM
Routing Off Site - STRUCTURAL6/21/1999 6/30/1999 PASS
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Plan resubmittals received  6/28/1999
RECEIVED SHEETS FP 1-4 ROUTED TO HOLD BOX TO PUT WITH PLANS WHEN BACK FROM P & Z KMM 6-28-99 PUT FP1-4 SHEETS WITH PLANS, AND PUT IN HOLD BOX WHILE WAITING FOR CIVIL SHEETS. KMM
Routing - PLANNING6/21/1999 6/25/1999 FAIL
Landscape plans must be revised per Forester's requirements and for tree caliper size.
Plan assigned to (MYS)6/18/1999 6/21/1999 PASS
DetailsMarlene Southard
Plan routing begun/NEW & ADDTN  6/21/1999 PASS
ROUTED TO P&Z FIRST DUE TO CIVIL SHEETS NOT BEING COMPLETE. KMM
Plans ACCEPTED BY PLAN TECH  6/21/1999 PEND
CIVIL SHEETS WERE STAMPED "REVIEW SET NOT FOR CONSTRUCTION" SHEET C7 NEEDS TO BE STAMPED AND SIGNED. DRAINAGE CALCS. ARE NEEDED. SHEETS FP 1-5 WERE LISTED ON COVER SHEET HOWEVER WERE NOT INCLUDED WITH SUBMITTAL. CONTACTED JOHN GALLSTROM OF THESE NEEDS. KMM 6-28-99 RECEIVED SHEETS FP 1-5. TALKED WITH DAVID CARRILLO ABOUT CIVIL SHEETS. HE WILL GET ON IT. PUT PLANS IN HOLD BOX UNTIL I RECEIVE CIVIL SHEETS. KMM 6-30-99 RECEIVED FIVE COIES OF CIVIL SHEETS. SHEET C2 AND C7 STILL NOT STAMPED AND SIGNED. WILL SPEAK WITH BRIAN M. KMM
Application received  6/18/1999
Received Certificate of Value  6/18/1999 PASS
FEE PAYMENT ACTIONS