Case Summary (BLD) | | | 9/7/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/8/2002 | | DONE |
|
|
|
|
Receive PAYMENT IN FULL | | | 5/8/2000 | | DONE |
|
|
|
|
Fee Review-notes | 4/7/2000 | 4/7/2000 | 5/5/2000 | | DONE |
|
|
|
|
BLD-Other | 4/13/2000 | 4/13/2000 | 4/13/2000 | | PASS |
Jim Storey
|
|
|
archived engineers final review letter.
|
(F) Reprint permit | | | 4/7/2000 | | DONE |
|
|
|
|
BLD-Final | 4/5/2000 | 4/6/2000 | 4/6/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/05/2000 at 13:22:32. Contact: ###-####. shell bld. l/c ok 4/6/00
|
Letter of compliance | | | 4/6/2000 | | DONE |
|
|
|
Letter of Compliance #18391 issued 4-6-00.
|
FIRE-Final Inspection | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/03/2000 at 09:32:52. Contact: ###-####.
|
Code Occupancy Approval | | | 3/27/2000 | | PASS |
|
|
|
ALL REQUIREMENTS HAVE BEEN MET, FINAL SIGNED OFF.
|
BLD-Framing/Rough-in | 2/29/2000 | 3/1/2000 | 3/1/2000 | A | FAIL |
Jim Storey
|
|
|
PAD A\\MEL ###-#### Draft stop penatration/truss repair eng. nail hangers at sheer wall rafters. 3/2/00 10:33:02 AM
|
BLD-Conference | 2/9/2000 | 2/9/2000 | 2/9/2000 | P | PART |
Jim Storey
|
|
|
###-#### service corridor of rated 1 hour or only const shell 1 hr as to exit loading-
|
BLD-Framing/Rough-in | 12/6/1999 | 12/7/1999 | 12/8/1999 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 09:55:12. Contact: ###-####. Roof nailing ok.
|
BLD-Framing/Rough-in | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | PART |
Jim Storey
|
|
|
PARTIAL FRAMING MEL ###-#### Work in progress, straps to roof in place teco nails verify plan/ TJI roof support North/East not appropriate insulation/ beam pocket.
|
BLD-Footing | 9/27/1999 | 9/28/1999 | 9/28/1999 | A | PART |
Jim Storey
|
|
|
mel ###-#### Covered with special insp. Pending report
|
(F) Reprint permit | | | 8/17/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/9/1999 | | |
|
|
|
|
Print Occupancy Form | | | 8/6/1999 | | |
|
|
|
|
Telephone call | | | 8/6/1999 | | PASS |
|
|
|
talked to dennis piper to verify plans are ready-told him he needed the achd 1st
|
Print Occupancy Form | | | 8/6/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/6/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/4/1999 | | 8/5/1999 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 6/22/1999 | | 8/5/1999 | | PASS |
John Menard
|
|
|
|
Routing - PLANNING | 8/2/1999 | | 8/4/1999 | | PASS |
|
|
|
Require additional 4 handicap parking spaces as per CUP98-0155.
|
Routing Off Site - STRUCTURAL | 7/28/1999 | | 8/3/1999 | | PASS |
|
|
|
RESUBMITTAL ROUTED TO STRUCTURAL ENGINEER CONSULTANT. 7/28/99 DAR
|
Plan Review Completed(1st rev) | | | 8/2/1999 | | PASS |
|
|
|
|
Routing - FIRE | 7/22/1999 | | 7/28/1999 | | PASS |
|
|
|
7-22-99 FED EXED PLANS TO FLOYD. KMM 7-28-99 RECEIVED APPROVED FIRE CODE PLAN REVIEW BACK FROM FLOYD. FAXED ARCHITECT RESPONCE. KMM
|
Plan resubmittals received | | | 7/27/1999 | | PASS |
|
|
|
RECEIVED THREE STRUCUTUAL COMMENT RESPONSES THREE REVISED SHEETS S0.1, S1.1, S2.1, S5.1, S7.1 & S7.2 TWO COPIES OF REVISED SHEETS A1.1, A4.0, A4.2, SD-2, L-1, L-2, L-3, L-4, L-5, AND L-6 TWO COPIES OF ADDENDA #1,2 AND 3 ROUTED TO JOHN MEANARD. KMM
|
Routing - PLAN CHECK | 7/14/1999 | | 7/22/1999 | | PEND |
|
|
|
|
Plan resubmittals requested | | | 7/21/1999 | | PEND |
|
|
|
MAILED BEN JANSEN AT BRS A COPY OF THE COVER LETTER AND PLAN REVIEW COMMENT LIST REQUESTING REVISIONS.
|
Plan resubmittals requested | | | 7/15/1999 | | PEND |
|
|
|
FAXED BEN JANSEN AT BRS A COPY OF THE REVIEW COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS.
|
Routing Off Site - STRUCTURAL | 6/22/1999 | | 7/14/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. PER JOHN M. KMM
|
Routing - PARKS DEPARTME | 6/22/1999 | | 7/14/1999 | | PASS |
|
|
|
6-22-99 LEFT MESSAGE WITH DAVID SELVAGE TO SEE IF HE WANTS TO LOOK AT PLANS. ###-#### EXT. 310 KMM DAVE OUT OF TOWN UNTIL THE 12TH. KMM CONTACTED DAVID SELVAGE HE STATED THAT HE DID NOT NEED TO SEE THE PLANS. DAR 7/14/99
|
Routing - PLANNING | 7/1/1999 | | 7/14/1999 | | PEND |
|
|
|
Approved for Design Review (DRH99-0032). David Abo needs to approve per the Conditional Use.
|
Routing - PLUMBING | 6/28/1999 | | 7/1/1999 | | PASS |
|
|
|
as per plan and 97 upc
|
Routing - PUBLIC WORKS | 6/22/1999 | | 6/28/1999 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/22/1999 | | PASS |
|
|
|
|
Received Certificate of Value | | | 6/22/1999 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/22/1999 | | PASS |
|
|
|
LEFT MESSAGE WITH DAVID SELVAGE TO SEE IF HE WANTS TO SEE THE PLANS. KMM
|
Application received | | | 6/21/1999 | | |
|
|
|
|