RIVER QUARRY PAD "A" * TO CONSTRUCT A NEW 11,830 SQ. FT., ONE STORY RETAIL SHELL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF CONCRETE SLAB FLOOR, MASONRY EXTERIOR WALLS AND WOOD FRAME ROOF STRUCTURE. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH EACH OF THE PROPOSED TENANT SPACES. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DRY99-0032/PC#467-99/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/7/2005 DONE
Case Summary (BLD)  11/8/2002 DONE
Receive PAYMENT IN FULL  5/8/2000 DONE
Fee Review-notes4/7/20004/7/20005/5/2000 DONE
BLD-Other4/13/20004/13/20004/13/2000 PASS
DetailsJim Storey
archived engineers final review letter.
(F) Reprint permit  4/7/2000 DONE
BLD-Final4/5/20004/6/20004/6/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/05/2000 at 13:22:32. Contact: ###-####. shell bld. l/c ok 4/6/00
Letter of compliance  4/6/2000 DONE
Letter of Compliance #18391 issued 4-6-00.
FIRE-Final Inspection4/3/20004/3/20004/3/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/03/2000 at 09:32:52. Contact: ###-####.
Code Occupancy Approval  3/27/2000 PASS
ALL REQUIREMENTS HAVE BEEN MET, FINAL SIGNED OFF.
BLD-Framing/Rough-in2/29/20003/1/20003/1/2000AFAIL
DetailsJim Storey
PAD A\\MEL ###-#### Draft stop penatration/truss repair eng. nail hangers at sheer wall rafters. 3/2/00 10:33:02 AM
BLD-Conference2/9/20002/9/20002/9/2000PPART
DetailsJim Storey
###-#### service corridor of rated 1 hour or only const shell 1 hr as to exit loading-
BLD-Framing/Rough-in12/6/199912/7/199912/8/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/06/1999 at 09:55:12. Contact: ###-####. Roof nailing ok.
BLD-Framing/Rough-in12/1/199912/1/199912/1/1999PPART
DetailsJim Storey
PARTIAL FRAMING MEL ###-#### Work in progress, straps to roof in place teco nails verify plan/ TJI roof support North/East not appropriate insulation/ beam pocket.
BLD-Footing9/27/19999/28/19999/28/1999APART
DetailsJim Storey
mel ###-#### Covered with special insp. Pending report
(F) Reprint permit  8/17/1999
Issue PAID IN FULL permit  8/9/1999
Print Occupancy Form  8/6/1999
Telephone call  8/6/1999 PASS
talked to dennis piper to verify plans are ready-told him he needed the achd 1st
Print Occupancy Form  8/6/1999
Inspection Record Card- Bld  8/6/1999
PLANS/APPL TAKEN TO FRONT DESK  8/5/1999 PASS
Routing - PLAN CHECK8/4/1999 8/5/1999 PASS
Plan assigned to (JCM)6/22/1999 8/5/1999 PASS
DetailsJohn Menard
Routing - PLANNING8/2/1999 8/4/1999 PASS
Require additional 4 handicap parking spaces as per CUP98-0155.
Routing Off Site - STRUCTURAL7/28/1999 8/3/1999 PASS
RESUBMITTAL ROUTED TO STRUCTURAL ENGINEER CONSULTANT. 7/28/99 DAR
Plan Review Completed(1st rev)  8/2/1999 PASS
Routing - FIRE7/22/1999 7/28/1999 PASS
7-22-99 FED EXED PLANS TO FLOYD. KMM 7-28-99 RECEIVED APPROVED FIRE CODE PLAN REVIEW BACK FROM FLOYD. FAXED ARCHITECT RESPONCE. KMM
Plan resubmittals received  7/27/1999 PASS
RECEIVED THREE STRUCUTUAL COMMENT RESPONSES THREE REVISED SHEETS S0.1, S1.1, S2.1, S5.1, S7.1 & S7.2 TWO COPIES OF REVISED SHEETS A1.1, A4.0, A4.2, SD-2, L-1, L-2, L-3, L-4, L-5, AND L-6 TWO COPIES OF ADDENDA #1,2 AND 3 ROUTED TO JOHN MEANARD. KMM
Routing - PLAN CHECK7/14/1999 7/22/1999 PEND
Plan resubmittals requested  7/21/1999 PEND
MAILED BEN JANSEN AT BRS A COPY OF THE COVER LETTER AND PLAN REVIEW COMMENT LIST REQUESTING REVISIONS.
Plan resubmittals requested  7/15/1999 PEND
FAXED BEN JANSEN AT BRS A COPY OF THE REVIEW COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS.
Routing Off Site - STRUCTURAL6/22/1999 7/14/1999 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. PER JOHN M. KMM
Routing - PARKS DEPARTME6/22/1999 7/14/1999 PASS
6-22-99 LEFT MESSAGE WITH DAVID SELVAGE TO SEE IF HE WANTS TO LOOK AT PLANS. ###-#### EXT. 310 KMM DAVE OUT OF TOWN UNTIL THE 12TH. KMM CONTACTED DAVID SELVAGE HE STATED THAT HE DID NOT NEED TO SEE THE PLANS. DAR 7/14/99
Routing - PLANNING7/1/1999 7/14/1999 PEND
Approved for Design Review (DRH99-0032). David Abo needs to approve per the Conditional Use.
Routing - PLUMBING6/28/1999 7/1/1999 PASS
as per plan and 97 upc
Routing - PUBLIC WORKS6/22/1999 6/28/1999 PASS
Plan routing begun/NEW & ADDTN  6/22/1999 PASS
Received Certificate of Value  6/22/1999 PASS
Plans ACCEPTED BY PLAN TECH  6/22/1999 PASS
LEFT MESSAGE WITH DAVID SELVAGE TO SEE IF HE WANTS TO SEE THE PLANS. KMM
Application received  6/21/1999