Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01838
StatusFinaled
Name HEIKES BERT ET UX
Site Address 2705 W SPAULDING ST
Project NameSPAULDING PARK CONDO
Customer Number 
ePlanReviewNo
Description
SPAULDING PARK CONDOMINIUM BUILDING "A" * TO CONSTRUCT A NEW 4,476 SQ.FT. TWO STORY, WOOD FRAMED FOUR UNIT CONDOMINIUM. EACH UNIT IS APPROXIMATELY 1084 SQ.FT. IN AREA AND HAVE TWO BEDROOMS AN TWO BATHROOMS. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST AND THE 1997 EDITION OF THE UBC. PERMIT TO INCLUDE ON SITE LANDSCAPING AND PARKING LOT. ADDITIONAL PERMIT REQUIRED FOR THE INSTALLATION OF THE CARPORTS. MJP DRH99-0069 CUP99-0007 PC#488-99
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  8/4/2000 DONE
Perm. Occ. Cert. #8318 issued 8-4-00 to the Spaulding Park Condominums.
Permanent Occupancy 8/3/20008/3/2000 DONE
Details
BLD-Final8/3/20008/3/20008/3/2000PPASS
DetailsJim Storey
ted ###-####
BLD-Final8/3/20008/3/20008/3/2000PPASS
DetailsJim Storey
ted ###-####
Fee Review-notes6/22/1999 7/25/2000 DONE
BLD-Final7/20/20007/20/20007/20/2000PPASS
DetailsJim Storey
allen--- ###-#### fn
Temporary occupancy  6/15/2000 PART
Temp. Occ. Cert. #4028 issued 6-15-00 to Spaulding Park Condominiums.
BLD-Final6/14/20006/14/20006/14/2000PPART
DetailsJim Storey
Ted ###-#### need s door lables re applaied by agencie. 6/14/00 4:55:02 PM
Code Occupancy Approval  6/14/2000 PASS
ALL CONDITIONS OF DRH99-00069 HAVE BEEN MET FINAL SIGNED OFF.
FIRE-Final Inspection6/12/20006/13/20006/13/2000APASS
DetailsRick Jackson
ted ###-####
FIRE-Final Inspection5/8/20005/9/20005/9/2000AFAIL
DetailsRick Jackson
allan ###-#### fn fire Fire lanes not complete. 5/11/00 11:09:28 AM
BLD-Other2/10/20002/10/20002/10/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/10/2000 at 10:00:15. Contact: ###-####. 1st 5/8 gyp on ceiling nailing approved.
BLD-Energy code compliance2/4/20002/7/20002/7/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/04/2000 at 13:23:27. Contact: ###-####. Frame c/n ok insulation ok
BLD-Framing/Rough-in1/27/20001/28/20001/28/2000AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/27/2000 at 11:57:57. Contact: ###-####. c\n posted 1/28/00 1:12:22 PM
BLD-Framing/Rough-in1/26/20001/26/20001/26/2000PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/26/2000 at 10:39:34. Contact: . plans on site do not have attached documents left c/n posted on site 1/27/00 2:39:19 PM
BLD-Framing/Rough-in1/7/20001/10/20001/10/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/07/2000 at 14:10:25. Contact: ###-####. Gyp. nail ok.
BLD-Framing/Rough-in11/24/199911/24/199911/24/1999PPART
DetailsJim Storey
shear nail ###-#### Shear ok exterior.
BLD-Framing/Rough-in11/15/199911/16/199911/16/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/15/1999 at 08:07:01. Contact: ###-####. Shear wall ok exterior walls.
BLD-Conference10/18/199910/19/199910/19/1999APASS
DetailsJim Storey
TED--- ###-#### CONF INSP Conf. On sie pre const.
BLD-Foundation9/29/19999/30/19999/30/1999APASS
DetailsJim Storey
BLD-Footing9/28/19999/29/19999/30/1999APART
DetailsJim Storey
Todd ###-#### Placed W/O inps. Set backs ok
Issue PAID IN FULL permit  9/14/1999 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/27/1999 PASS
Print Occupancy Form  8/27/1999
Print Pending Permit.LaserJet4  8/27/1999 PASS
Plan Reviewer's activity  8/27/1999 PASS
Telephone call  8/27/1999
called permit ready left message need ACHD cert
Inspection Record Card- Bld  8/27/1999
Routing - PLAN CHECK7/21/1999 8/27/1999 PASS
Waiting for architects response.
Plan assigned to (M_P)6/22/1999 8/27/1999 PASS
DetailsMike Phillips
08/27/99 13:58:50 M_P - this action updated by action script from <<>> in Case No. BLD99-1838
Plan resubmittals requested  8/4/1999 FAIL
Additional information requested for follow up review.
Plan resubmittals received  8/4/1999 PEND
RECEIVED PLAN RESUBMITALLS FROM JIMMIE O'CONNER OF SMITH ARCHITECTS, FORWARDED SAME TO MIKE PHILLIPS. 8/4/99
Plan resubmittals received  7/22/1999
RECEIVED TWO COPIES OF REVISED SHEETS A-1, A-2, A-8, ME1, AND ME2 ROUTED TO MIKE P. KMM
Routing - PLAN CHECK7/20/1999 7/21/1999 PEND
Routing - FIRE7/21/1999 7/21/1999 PASS
Routing - FIRE7/16/1999 7/20/1999 FAIL
FIRE HYDRANT ISSUE
Plan Review Completed(1st rev)  7/20/1999 FAIL
Routing - PLUMBING7/15/1999 7/16/1999 PASS
1" required to each unit, that portion of the 8" sewer to be inspected by the plumbing dept., foot vent connections to be above the flood level of the upper fixyure.
Routing - PLAN CHECK7/12/1999 7/14/1999
ROUTING TO OTHERS.
Plan resubmittals requested  7/14/1999 FAIL
SENT CORRECTION LETTER TO ARCHITECT FURTHER REVIEW REQUIRED.
Routing - PLANNING7/14/1999 7/14/1999 PASS
approved per DRH99-0069.
Routing - PLUMBING7/8/1999 7/12/1999 FAIL
provide a complete plumbing plan
Routing - PLANNING7/7/1999 7/8/1999 FAIL
revised plans indicating compliance with the Design Review conditions have not been met.
Routing - PLANNING7/2/1999 7/7/1999 PEND
Pending Design Review approval.
Routing - PUBLIC WORKS6/30/1999 7/2/1999 PASS
Plans ACCEPTED BY PLAN TECH  6/30/1999 PASS
Plan routing begun/NEW & ADDTN  6/30/1999 PASS
Received Certificate of Value  6/28/1999 PASS
Recd Pcfee & Taken To Pln CK  6/28/1999
Application received  6/22/1999