Permit Information
Permit NumberBLD99-01841
StatusFinaled
Name HEIKES BERT ET UX
Site Address 2701 W SPAULDING ST
Project NameSPAULDING PARK CONDO
Customer Number 
ePlanReviewNo
Description
SPAULDING PARK CONDOMINIUM BUILDING "C" * TO CONSTURCT A NEW 4,476 SQ. FT. TWO STORY, WOOD FRAMED, FOUR UNIT CONDOMINIUM. EACH UNIT IS APPROXIMATELY 1084 SQ.FT. IN AREA AND HAVE TWO BEDROOMS AND TWO BATHROOMS. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST AND THE 1997 EDITION OF THE UBC. PERMIT TO INCLUDE ON SITE LANDSCAOING AND PARKING LOT. ADDITIONAL PERMIT REQUIRED FOR THE INSTALLATION OF THE CARPORTS. MJP DRH99-0069 CUP99-0007 PC#490-99
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  8/4/2000 DONE
Perm. Occ. Cert. #8319 issued 8-4-00 to the Spaulding Park Condominiums.
Permanent Occupancy 8/3/20008/3/2000 DONE
Details
BLD-Final8/3/20008/3/20008/3/2000PPASS
DetailsJim Storey
ted ###-####
BLD-Final8/3/20008/3/20008/3/2000PPASS
DetailsJim Storey
ted ###-####
Fee Review-notes6/22/1999 7/25/2000 DONE
BLD-Final7/20/20007/20/20007/20/2000PPASS
DetailsJim Storey
allen-- ###-####-- fn
Temporary occupancy  6/15/2000 PART
Temp. Occ. Cert. #4030 issued 6-15-00 to the Spaulding Park Condominiums.
BLD-Final6/14/20006/14/20006/14/2000PPART
DetailsJim Storey
###-####
Code Occupancy Approval  6/14/2000 PASS
ALL CONDITIONS OF DRH99-00069 HAVE BEEN MET AND FINAL SIGNED OFF.
FIRE-Final Inspection6/12/20006/13/20006/13/2000APASS
DetailsRick Jackson
ted ###-####
BLD-Final6/2/20006/2/20006/2/2000PFAIL
DetailsJim Storey
ted--cell-###-#### fn occ
FIRE-Final Inspection5/8/20005/9/20005/9/2000AFAIL
DetailsRick Jackson
allan----###-####--fire fn Fire lanes not complete. 5/11/00 11:09:20 AM
BLD-Other2/17/20002/17/20002/17/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/17/2000 at 09:58:02. Contact: ###-####. Gyp. nailing ok. 2/18/00 9:39:39 AM
BLD-Other2/16/20002/16/20002/16/2000PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 02/16/2000 at 10:54:09. Contact: ###-####. No plan no ans on phone. 2/17/00 9:08:07 AM
BLD-Energy code compliance2/4/20002/7/20002/7/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/04/2000 at 13:24:53. Contact: ###-####. Frame c/n insulation ok
BLD-Framing/Rough-in1/27/20001/28/20001/28/2000AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/27/2000 at 11:59:26. Contact: ###-####. c\n posted 1/28/00 1:12:15 PM
BLD-Framing/Rough-in1/26/20001/26/20001/26/2000PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/26/2000 at 10:38:04. Contact: . plans on site do not have attached building department documents left c/n on site. 1/27/00 2:38:28 PM
BLD-Framing/Rough-in1/7/20001/10/20001/10/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/07/2000 at 14:08:59. Contact: ###-####. Gyp. nail ok.
BLD-Framing/Rough-in12/14/199912/15/199912/15/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/14/1999 at 10:09:50. Contact: ###-####. Conf: rated penetrations of floor ceiling for protection.
BLD-Framing/Rough-in12/6/199912/6/199912/6/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/06/1999 at 11:19:28. Contact: ###-####. 5/8 Gyp. On stair walls 8 aff. Ok nailing.
BLD-Framing/Rough-in12/2/199912/3/199912/3/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/02/1999 at 12:06:52. Contact: ###-####. Sheer ok exterior walls.
BLD-Framing/Rough-in12/1/199912/1/199912/1/1999PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/01/1999 at 08:05:46. Contact: ###-####. Shear nailing ok, need floor to floor St. straps.
BLD-Footing9/20/19999/21/19999/21/1999ANR
DetailsJim Storey
todd ###-#### Work in progress
Issue PAID IN FULL permit  9/14/1999 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/27/1999 PASS
Plan Reviewer's activity  8/27/1999 PASS
Print Pending Permit.LaserJet4  8/27/1999 PASS
Routing - PLAN CHECK7/21/1999 8/27/1999 PASS
Waiting for architects response.
Plan assigned to (M_P)6/22/1999 8/27/1999 PASS
DetailsMike Phillips
08/27/99 14:19:07 M_P - this action updated by action script from <<>> in Case No. BLD99-1841
Plan resubmittals requested  8/4/1999 FAIL
Additional information requested for follow up review.
Routing - FIRE7/21/1999 7/21/1999 PASS
Routing - PLAN CHECK7/20/1999 7/21/1999 PEND
Routing - FIRE7/16/1999 7/20/1999 FAIL
FIRE HYDRANT ISSUE
Plan Review Completed(1st rev)  7/20/1999 FAIL
Routing - PLUMBING7/15/1999 7/16/1999 PASS
see bld99-1838 for comments
Plan resubmittals received  7/15/1999
RECEIVED TWO COPIES OF CIVIL SHEETS FROM TEALYS. I AM PUTTING IN MY HOLD BOX UNTIL PLANS ARE BACK FROM PLUMB. TED MASON WAS IN TODAY AND MADE SOME ADJUSTMENTS ON CIVIL SHEETS (4" PVC). THE PLANS I RECEIVED ARE THE SAME SUBMITTED EARLIER WITH OUT TEDS COMMENTS. I CONTACTED BILL V. OF ALL THE ABOVE. HE WILL LET ME KNOW IF MORE IS NEEDED. KMM
Routing - PLAN CHECK7/12/1999 7/14/1999
ROUTING TO OTHERS
Routing - PLANNING7/14/1999 7/14/1999 PASS
approved per DRH99-0069.
Plan resubmittals requested  7/14/1999 FAIL
ADDITIONAL INFORMATION REQUIRED TO BE SUBMITTED FOR FURTHER REVIEW.
Routing - PLUMBING7/8/1999 7/12/1999 FAIL
provide a complete plumbing plan
Routing - PLANNING7/7/1999 7/8/1999 FAIL
see BLD99-1838.
Routing - PLANNING7/2/1999 7/7/1999 PEND
Pending design review approval.
Routing - PUBLIC WORKS6/30/1999 7/2/1999 PASS
Plan routing begun/NEW & ADDTN  6/30/1999 PASS
Plans ACCEPTED BY PLAN TECH  6/30/1999 PASS
Received Certificate of Value  6/28/1999 PASS
Recd Pcfee & Taken To Pln CK  6/28/1999
Application received  6/22/1999