Permit Information
Permit NumberBLD99-01863
StatusFinaled
Name ALBERTSONS INC
Site Address 360 E MALLARD DR Unit: 175
Project NameLAKEPOINTE CENTRE II
Customer Number 
ePlanReviewNo
Description
To remodel a 4,523 sq.ft. area on the 1st floor for new tenant per approved plans on file. Work to include, installation of new egress door and landing to the exterior of the building, new walk way to grade, installation of a suspended ceiling system, Upgradeing core area restrooms for Accessibility including creating one unisex accessible restroom in the second floor core area. Miscelanueous interior finishes. NOTE: This building is fully fire sprinklered for area increase. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. (P.C.#474-99)*RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/24/1999 5/5/2000 DONE
Permanent occupancy  9/23/1999 DONE
Perm. Occ. Cert. #7912 issued 9-23-99 to Albertson's. (offices)
Permanent Occupancy 9/3/19999/3/1999 DONE
Details
INSP - Final9/2/19999/3/19999/3/1999APASS
DetailsJim Storey
09/03/99 301 - REINSPECTION MIKE ###-####
INSP - Final9/2/19999/2/19999/2/1999PFAIL
DetailsJim Storey
09/02/99 301 - sink trap protection
INSP-Alarm Testing8/18/19998/20/19998/20/1999APART
DetailsRick Jackson
Scheduled by Hello!. Contact phone is [8673817]. suite numbers; alarm interface
INSP - Final8/18/19998/20/19998/20/1999APART
DetailsJim Storey
08/20/99 301 - temp ok pending restaroom compleation
INSP-Final Inspection8/5/19998/6/19998/6/1999AFAIL
DetailsRick Jackson
exit signs; door hardware
INSP-Conference8/3/19998/3/19998/3/1999PPART
DetailsRick Jackson
alarm submittal
INSP - Framing/Rough-in7/28/19997/29/19997/29/1999APASS
DetailsJim Storey
07/29/99 301 - ceilling ok
Issue PAID IN FULL permit  7/20/1999
Issue PAID IN FULL permit  7/20/1999
PLANS/APPL TAKEN TO FRONT DESK  7/19/1999 PASS
Routing - PLAN CHECK7/16/1999 7/19/1999 PEND
WAITING FOR LETTER FROM ARCHITECT OF TIME FRAME AND HOW THE EXISTING EXIT CORRIDOR IS TO BE FIXED.
Inspection Record Card- Bld  7/19/1999
Print Occupancy Form  7/19/1999
Telephone call  7/19/1999
left message for Jeff Urban for both units 175 & 200
Plan Reviewer's activity  7/19/1999 PASS
SEE LETTER OF INTENT ON FILE FOR UPGRADE OF NONCOMPLIACT EXITING CORRIDOR PROPOSED TIME FOR COMPLETION 10-01-99, DATE OF SUBMITTAL OF PROPOSED PLANS 11-01-99.
Print Pending Permit.LaserJet4  7/19/1999 PASS
Plan assigned to (R_H)6/24/1999 7/19/1999 PASS
Details
07/19/99 14:31:12 RMH - this action updated by action script from <<>> in Case No. BLD99-1863
Plan Review Completed(1st rev)  7/16/1999 PASS
Routing - FIRE7/15/1999 7/16/1999 PASS
Plan Reviewer's activity  7/15/1999 PASS
route to fire department
Routing - PLAN CHECK6/25/1999 7/15/1999 PEND
Plan resubmittals received  7/14/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM JEFF URBAN, COLE AND ASSOCIATES, FORWARDED SAME TO RON HILL. DAR 7/14/99
INSP-Conference7/13/19997/13/19997/13/1999APART
DetailsRick Jackson
received call from Simplex and determined they will need fire alarm submittals
Telephone call  7/12/1999 PEND
Spoke with Architect, Jeff, he has indicated that the owners would like to modify the restrooms, from how the plans are. I told him to resubmit the new design, and a letter on what time frame is proposed for upgradeing the existing exiting system.
Plan Reviewer's activity  7/1/1999
Met with Stan Cole & Jeff and Jim Story at the building site and discussed existing conditions aqnd exiting requirements, Arcitects will resubmit new proposal and plans.
Telephone call  6/30/1999
Spoke with architect, will meet him at job site 7-01-99 to look at exit system, with inspector.
Plan Reviewer's activity  6/29/1999
spoke with architect on phone, he faxed me a revision to the plans, but has not submitted them on the new plan sheets. Inspectors have indicated that the corridor system may not be complying I suggested to the architect to vist the site and to submit any upgrade rquirements to the corridor at the same time he submits the new exit stairs that he had proposed.
Routing - PUBLIC WORKS6/24/1999 6/25/1999 PASS
Plans ACCEPTED BY PLAN TECH  6/24/1999 PASS
Recd Pcfee & Taken To Pln CK  6/24/1999
Received Certificate of Value  6/24/1999 PASS
Application received  6/24/1999
Plan assigned to (MYS)6/24/1999 6/24/1999
DetailsMarlene Southard
Plan routing begun/TENANTS  6/24/1999
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
INSP - Final8/5/19998/6/19998/9/1990APART
DetailsJim Storey
08/06/99 301 - temp 1 st floor office only