Fee Review-notes | 6/18/2003 | 6/18/2003 | 6/18/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/23/2002 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/5/2000 | | DONE |
|
|
|
|
Fee Review-notes | 6/24/1999 | | 5/16/2000 | | DONE |
|
|
|
additional value from subs
|
BLD-Final | 2/11/2000 | 2/11/2000 | 2/11/2000 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/11/2000 at 11:19:13. Contact: ###-####. Card to cont. 2/14/00 11:52:30 AM
|
Permanent Occupancy | | 2/11/2000 | 2/11/2000 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 2/11/2000 | | PASS |
|
|
|
Landscaping done, bark in, h/c signs are up - last 8' panel of fence is temporary because of conflict with neighbor over moving her post. Meets compliance with Design Review Permit
|
Permanent occupancy | | | 2/11/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8135 issued 2-11-00 to Nampa Floors & Interiors.
|
FIRE-Final Inspection | 2/9/2000 | 2/10/2000 | 2/10/2000 | A | PASS |
Joe Tawney
|
|
|
###-#### reinspection ok for perm occ
|
BLD-Final | 2/9/2000 | 2/10/2000 | 2/10/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### need eng'r ok and all other insp's
|
Code Occupancy Approval | | | 2/10/2000 | | FAIL |
|
|
|
Met J.C. of Petra on site. Still need to complete the 8' section of fence at the southeast corner of proj. - above-grade handicapped signs and mulch (soil aid or bark ). The neighbor lady is raising cain about them moving her post to complete fence so, I am not opposing them jogging in a few inches on the remaining 8' section until this issue is totally resolved.
|
FIRE-Final Inspection | 2/8/2000 | 2/9/2000 | 2/9/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 02/08/2000 at 15:17:30. Contact: . Reinpsection failed duct detectors.
|
BLD-Final | 2/8/2000 | 2/9/2000 | 2/9/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/08/2000 at 15:19:20. Contact: . Still has fire correction, no further inspections performed.
|
FIRE-Final Inspection | 2/4/2000 | 2/7/2000 | 2/7/2000 | A | FAIL |
Joe Tawney
|
|
|
Michael-###-#### Reinsp. fail C/N not completed. 2/7/00 1:29:52 PM
|
BLD-Final | 2/4/2000 | 2/7/2000 | 2/7/2000 | P | PASS |
Tom Arcoraci
|
|
|
Michael-###-####
|
FIRE-Final Inspection | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | FAIL |
Joe Tawney
|
|
|
Micheal ###-#### smoke, fire damper 1/31/00 8:26:43 AM
|
BLD-Final | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | FAIL |
Tom Arcoraci
|
|
|
Micheal ###-#### not ready no fire insp 1/31/00 8:32:02 AM
|
CHANGE STATUS TO (I) | | | 1/28/2000 | | DONE |
|
|
|
The status was accidently changed on 11-15-99 by DAR to application recieved so I changed it to Issued status. AJC
|
BLD-Framing/Rough-in | 11/26/1999 | 11/29/1999 | 11/29/1999 | A | PART |
Carl Dependahl
|
|
|
bill ###-#### Need firestops & top-of-wall @ rated walls.
|
BLD-Framing/Rough-in | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | PART |
Carl Dependahl
|
|
|
BILL-- ###-#### R/I Add'l C/N; need manue's rep. To verify retro. Tek EFIS & certify per ICBO er: 5245
|
BLD-Framing/Rough-in | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | PART |
Carl Dependahl
|
|
|
BILL ###-#### Rec'd. eng's clarification for walls ok to insul. & cover exc. Grid "C" @ eng'd wall section. Awaiting further EFIS info (Er. Report)
|
BLD-Framing/Rough-in | 11/15/1999 | 11/16/1999 | 11/16/1999 | A | FAIL |
Carl Dependahl
|
|
|
BILL ###-#### FR INSP 2nd C/N; weather barrier/listed EFIS system; Add'l calrification by engr (stamped) req'd.
|
BLD-Conference | 11/15/1999 | 11/15/1999 | 11/15/1999 | A | PASS |
Carl Dependahl
|
|
|
Reviewed correction notice. Keep C/N.
|
BLD-Framing/Rough-in | 11/9/1999 | 11/10/1999 | 11/10/1999 | P | FAIL |
Carl Dependahl
|
|
|
bill ###-#### C/N.. Need eng'r. to inspect. Multiple errors in framing.
|
BLD-Framing/Rough-in | 10/12/1999 | 10/12/1999 | 10/12/1999 | P | FAIL |
Carl Dependahl
|
|
|
###-####; need clarify shear walls,; masonry spec insp onsite
|
BLD-Framing/Rough-in | 10/8/1999 | 10/11/1999 | 10/11/1999 | | PART |
Carl Dependahl
|
|
|
bill ###-#### pouring at 8am not frame insp … masonary : ok pending spec. insp. Report.
|
BLD-Framing/Rough-in | 10/11/1999 | 10/11/1999 | 10/11/1999 | P | PART |
Carl Dependahl
|
|
|
Bill ###-#### masonary/ grout… pend. Spec. insp. Report
|
BLD-Framing/Rough-in | 10/7/1999 | 10/8/1999 | 10/8/1999 | A | PART |
Carl Dependahl
|
|
|
BILL-- 59-9616---REBAR REPLACEMENT not fram, ext. masonry walls… pend. Spec. insp.
|
BLD-Framing/Rough-in | 10/7/1999 | 10/7/1999 | 10/7/1999 | P | PART |
Carl Dependahl
|
|
|
bill--- ###-#### --cmu wall insp 1st lift east wall ; special insp
|
BLD-Foundation | 9/24/1999 | 9/24/1999 | 9/24/1999 | P | PART |
Carl Dependahl
|
|
|
Bill ###-#### Spec. insp. Report pending
|
BLD-Footing | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | PART |
Carl Dependahl
|
|
|
bill ###-#### NW corner
|
BLD-Foundation | 9/17/1999 | 9/20/1999 | 9/20/1999 | A | PART |
Carl Dependahl
|
|
|
Spec insp report pending
|
INSP - Foundation | 9/9/1999 | 9/10/1999 | 9/10/1999 | A | PART |
Carl Dependahl
|
|
|
met supt. & spec insp onsite . ftgs ok to pour
|
(F) Reprint permit | | | 9/2/1999 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 8/31/1999 | 8/31/1999 | 8/31/1999 | | PAID |
|
|
|
cert #99-5629
|
Issue PAID IN FULL permit | | | 8/31/1999 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/27/1999 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/27/1999 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/27/1999 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/27/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/1999 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/27/1999 | | |
|
|
|
|
Print Occupancy Form | | | 8/27/1999 | | |
|
|
|
|
Telephone call | | | 8/27/1999 | | |
|
|
|
called permit ready busy signal
|
Routing - PLAN CHECK | 8/6/1999 | | 8/27/1999 | | PASS |
|
|
|
|
Plan assigned to (M_P) | 6/28/1999 | | 8/27/1999 | | PASS |
Mike Phillips
|
|
|
08/27/99 11:15:52 M_P - this action updated by action script from <<>> in Case No. BLD99-1882
|
Routing Off Site - STRUCTURAL | 8/2/1999 | | 8/18/1999 | | PASS |
|
|
|
SENT STRUCTURAL RESUBMITTALS TO CONSULTING STRUCTURAL ENGINEER VIA PDQ. 8/2/99 DAR Waiting for response from Architect about outside engineering firm second comments. 8/18/99 mjp REVIEWED STRUCTURAL COOMENT AS SUBMITTED AND PASSED THEM. MJP 08/27/99
|
Plan resubmittals requested | | | 8/18/1999 | | FAIL |
|
|
|
Requested additional structural comments to be submitted for follow up review. Faxed to Architect on 08/17/99. verified with Architect today that he received comments. mjp.
|
Plan Reviewer's activity | | | 8/6/1999 | | PEND |
|
|
|
Waiting for outside engineering to be approved.
|
Routing - PLANNING | 8/4/1999 | | 8/4/1999 | | PASS |
|
|
|
approved per DRH98-0043.
|
Routing - PLAN CHECK | 7/21/1999 | | 8/2/1999 | | |
|
|
|
ROUTING TO PLUMBING FOR FOLLOW UP REVIEW.
|
Routing - PLAN CHECK | 8/2/1999 | | 8/2/1999 | | |
|
|
|
Routed to planning.
|
Routing - PLUMBING | 8/2/1999 | | 8/2/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/30/1999 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM RANDY HAVERFIELD, FORWARDED SAME TO MICHAEL PHILLIPS. 8/2/99 DAR
|
Routing - FIRE | 7/20/1999 | | 7/21/1999 | | PASS |
|
|
|
|
Routing - FIRE | 7/16/1999 | | 7/19/1999 | | FAIL |
|
|
|
SENT TO FIRE FOR THE GRADING AND DRAINAGE APPROVAL ONLY. DAR 7/16/99 NEEDS ANOTHER HYDRANT LOCATION TO MEETING CIY OIRDINANCE REQUIREMENT PER PER BILL ALEXANDER. DAR 7/20/99DB
|
Routing - PLANNING | 7/12/1999 | | 7/16/1999 | | PASS |
|
|
|
approved per DRH98-0043.
|
Routing - PLUMBING | 7/9/1999 | | 7/12/1999 | | FAIL |
|
|
|
provide a site plan showing water and sewer lines to utilities connections
|
Routing - PUBLIC WORKS | 7/7/1999 | | 7/8/1999 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 7/7/1999 | | FAIL |
|
|
|
Sent complete correction list to Architect.
|
Routing Off Site - STRUCTURAL | 6/28/1999 | | 7/6/1999 | | FAIL |
|
|
|
PLANS SENT TO CONSULTING STRUCTURAL ENGINEER PER JOHN MENARD. DAR 6/28/99. SENT VIA PDQ. Additional comments required to be reviewed by outside engineering firm.
|
Plan Reviewer's activity | | | 7/2/1999 | | |
|
|
|
Particial review completed waiting for outside engineering firm to complete their review prior to sending mine.
|
Routing - PLAN CHECK | 6/30/1999 | | 7/2/1999 | | |
|
|
|
Routing to others.
|
Routing - PUBLIC WORKS | 6/28/1999 | | 6/30/1999 | | |
|
|
|
PULLED BACK FROM PUBLIC WORKS AT MIKE PHILLIPS REQUEST. DAR 6/30/99
|
Plans ACCEPTED BY PLAN TECH | | | 6/28/1999 | | PEND |
|
|
|
PLANS HELD UNTIL 6/28/99 WAITING FOR STRUCTURAL CACULATIONS. DAR
|
Plan assigned to (MYS) | 6/24/1999 | | 6/28/1999 | | |
Marlene Southard
|
|
|
|
Application received | | | 6/24/1999 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/24/1999 | | |
|
|
|
|