Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD99-01912
StatusFinaled
Name GARY CHRISTENSEN
Site Address 2323 S VISTA AVE Unit: 100
Project NameVISTA/TARGEE-BLDG A
Customer Number 
ePlanReviewNo
Description
(SUMMIT MORTGAGE) This building is fire sprinklered for building area increase. To construct a 2,964 square foot office tenant space on the first floor. Work is to include interior nonbearing walls, interior doors, interior windows, and suspended ceilings per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-485-99 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  8/30/2000  
This tenant space was reduced in size to 2,855 square feet. The occupant load was changed to 29. One exit is required. It originally had two exits and one has now been removed.
Fee Review-notes6/28/1999 5/5/2000 DONE
(F) Reprint permit  5/5/2000 DONE
Permanent Occupancy 9/10/19999/10/1999 DONE
Details
Permanent occupancy  9/10/1999 DONE
Perm. Occ. Cert. #7892 issued 9-10-99 to Summit Mortgage.
INSP - Final8/12/19998/13/19998/13/1999APART
DetailsJim Storey
08/13/99 301 - pending plm and ele and fire temp ok only
Temporary occupancy  8/13/1999 PASS
Temp. Occ. Cert. #3886 issued 8-13-99 to Summit Mortgage.
INSP-Final Inspection8/11/19998/12/19998/12/1999AFAIL
DetailsRick Jackson
test alarms; main exit door closure;
INSP-Final Inspection8/12/19998/12/19998/12/1999PPASS
DetailsRick Jackson
occ approved
INSP - Framing/Rough-in8/6/19998/9/19998/10/1999AFAIL
Details
08/09/99 338 - other agencies not approvedc/n issued
Plan assigned to (CJW)7/20/1999 8/4/1999 PASS
DetailsCarl Westfall
08/04/99 08:14:50 CJW - this action updated by action script from <<>> in Case No. BLD99-1912
Print Occupancy Form  8/4/1999
Telephone call  8/4/1999
called permit ready GC
PLANS/APPL TAKEN TO FRONT DESK  8/4/1999 PASS
Inspection Record Card- Bld  8/4/1999
Issue PAID IN FULL permit  8/4/1999
Routing - PLAN CHECK7/27/1999 8/3/1999
Sent back to Plumbing for ejector review.
Plan resubmittals received  8/3/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM PATRICK McKEEGAN, FORWARDED SAME TO JASON BLAIS. 8/3/99 DAR
Routing - PLUMBING8/3/1999 8/3/1999 PASS
Plan Review Completed(1st rev)  7/27/1999
Routing - FIRE7/26/1999 7/26/1999 PASS
Routing - PLUMBING9/26/1999 7/26/1999 FAIL
Must provide a more detailed plumbing drawing drawing on ejector. Ejector must be UPC approved, it must be vented properly and the waste discharge must have a valve and check valve as required. Provide ejector information. per Gearld Varner. DAR 7/26/99
Routing - PLAN CHECK7/2/1999 7/23/1999 PASS
Print permit w/o conditions  7/23/1999
testing condition printout  7/23/1999
Plan Reviewer's activity  7/23/1999 PASS
UBC plan review started July 23, 1999 and finished the same day. The drawings were approved with conditions. See the conditions list.
Plan assigned to (JCB)7/2/1999 7/20/1999
DetailsJason Blais
Reassigned to Carl W. due to workload redistribution.
Routing - PUBLIC WORKS7/2/1999 7/2/1999 PASS
Plan routing begun/TENANTS  7/2/1999
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plan assigned to (MYS)6/28/1999 7/2/1999
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  6/29/1999 PEND
Application received  6/28/1999
Recd Pcfee & Taken To Pln CK  6/28/1999