Case Summary (BLD) | | | 8/3/2001 | | |
|
|
|
|
INSP - Final | 7/29/1999 | 8/2/1999 | 8/2/1999 | A | FAIL |
Tom Arcoraci
|
|
|
08/02/99 408 - ridgeway ind rod--###-#### fn insp-main floor
|
INSP - Final | 7/28/1999 | 7/29/1999 | 7/29/1999 | A | FAIL |
Tom Arcoraci
|
|
|
07/29/99 408 - not ready
|
Inspection Record Card- Bld | | | 7/29/1999 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/30/1999 | | PASS |
|
|
|
Approved as noted and attached.
|
Issue PAID IN FULL permit | | | 6/30/1999 | | |
|
|
|
|
Print Occupancy Form | | | 6/30/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/30/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/1999 | | PASS |
|
|
|
Routed to permit desk for processing.
|
Plan assigned to (DRS) | 6/23/1999 | | 6/30/1999 | | |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 6/30/1999 | | 6/30/1999 | | PASS |
|
|
|
Approved as noted and attached.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/23/1999 | | |
|
|
|
Received structural engineering design & calculations by Kolby Orcher, CSHQA, Structural Engineer. Accepted engineering for permit. Separate electrical & mechanical permit is required.
|
Telephone call | | | 6/23/1999 | | |
|
|
|
Phone discussion with Mr. Rod Bacus of Ridgeway Industrial concerning permit for structural support upgrade to support two new HVAC RTU for 346 Steelhead Way, SCP Warehouse.
|
Received Certificate of Value | | | 6/23/1999 | | |
|
|
|
Obtained new C.V. with values separated.
|
Waiting for Cert. of Value | | | 6/23/1999 | | |
|
|
|
Certificate of value submitted does not break out costs for each trade, mechanical/electrical/building. Called Mr. Bacus to submitt ne certificate of value. Received p.m. of 6/23/99.
|
Application received | | | 6/23/1999 | | |
|
|
|
|
Fee Review-notes | 7/9/1999 | | | | |
|
|
|
|