Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD99-02034
StatusFinaled
Name ALBERTSON'S INC
Site Address 3041 W PASADENA DR
Project NameALBERTSON'S BENCH PL
Customer Number 
ePlanReviewNo
Description
Within an existing three story, 46,248 s.f. building, w/ full basement, to construct approximately 238 feet of non-bearing noncombustible wall on the first floor to create five private offices, two conference rooms, and a mail room. To construct approximately 152 feet of NB, non-combustible walls on the third floor to create six private offices & a conference room. Construction on each floor SHALL not interfer with originally approved exit access system. Per previous permits, this building is of Type II-1 hour construction, with sprinkler substitution for the 1-hour construction. NOTE: This building is fully fire sprinkled. PC#99-506/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes11/4/199911/4/199911/4/1999 DONE
Letter of compliance  8/19/1999 PASS
Letter of Compliance #17896 issued 8-19-99.
INSP-Final Inspection8/16/19998/17/19998/17/1999APASS
DetailsRick Jackson
CALL 1ST BOB CAFFERTY- ###-#### FN INSP occupancy approved
INSP - Final8/17/19998/17/19998/17/1999PPASS
DetailsJim Storey
08/17/99 301 - BOB ###-####
INSP - Final7/19/19997/19/19997/19/1999 CANC
Details
07/16/99 338 - to be done by 301
INSP-Final Inspection7/16/19997/16/19997/16/1999PPART
DetailsRick Jackson
BOB ###-#### FIRE SAFETY okay to occ first floor only
INSP - Final7/9/19997/9/19997/9/1999PPART
DetailsJim Storey
07/09/99 301 - temp main office area ok
Inspection Record Card- Bld  7/8/1999
Telephone call  7/8/1999 PASS
###-####\left message
Print Occupancy Form  7/8/1999
Meeting  7/7/1999
Meeting w/ Bob Cafferty, contractor. Wants to pull separate permit for each floor if the third floor project holds up issuance of permit.
PLANS/APPL TAKEN TO FRONT DESK  7/7/1999 PASS
Approved as noted and attached.
Telephone call  7/7/1999
Called Ted Isabell to verify that no new plumbing fixture's are being added. Cost on certificate of value for this permit are for changes to hydronic heating system, not to fixture's or sewer use fee's.
Routing - PLAN CHECK7/7/1999 7/7/1999 PASS
Approved as noted and attached to approved plans. All work involves existing tenant space, one tenant, non-bearing walls, does not change occupancy group, exit system or occupant load. Issuing as a fast track permit per city policy.
Plan assigned to (DRS)7/6/1999 7/7/1999 PASS
DetailsDan Stuart
Print Pending Permit.LaserJet4  7/7/1999 PASS
Plans approved as noted and attached tp plan review comments.
Meeting  7/6/1999
Met with Ted Isbell, architect to review scope of work. Accepted plans for processing as quick permit with condition that existing exit system shown on submitted plans matches the originally approved details and the proposed changes do not modify the existing tenant space for occupant load, occupancy group or the exit system.
Application received  7/6/1999
Plans ACCEPTED BY PLAN CHECK  7/6/1999