BLD-Final | 5/11/2001 | 5/11/2001 | 5/11/2001 | P | PASS |
Carl Dependahl
|
|
|
Final reinspect... 5/11/2001 2:58:07 PM
|
Letter of compliance | | | 5/11/2001 | | DONE |
|
|
|
L.C. No. 21497 5/11/01 AML
|
BLD-Final | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | FAIL |
Carl Dependahl
|
|
|
Final reinspect - Cathy has the card - Dave, ###-####- call 1st so he can meet you; need elec permits for elevator & sensors finalled...spoke w/ bldr...recall. 4/27/2001 12:28:30 PM
|
Code Occupancy Approval | | | 4/4/2001 | | PASS |
|
|
|
I met with Dave Maloney and I confirmed that work had been completed.
|
Office Staff conference/action | | | 2/5/2001 | | PART |
|
|
|
Temp. Occ. Cert. extended thru 4-1-01 per Tim Hogland.
|
Conference | 1/30/2001 | 1/30/2001 | 1/30/2001 | | PART |
|
|
|
Left msg. w/Dave Maloney re: status of temp. occ.
|
Fee Review-notes | 7/8/1999 | | 11/27/2000 | | DONE |
|
|
|
|
BLD-Final | 11/8/2000 | 11/9/2000 | 11/9/2000 | P | PART |
Jim Storey
|
|
|
tom ###-#### tenp occ ok c/n posted for other isues to be completed. 11/9/2000 4:15:58 PM
|
BLD-Final | 11/8/2000 | 11/9/2000 | 11/9/2000 | P | PART |
Jim Storey
|
|
|
tom ###-#### tenp occ ok c/n posted for other isues to be completed. 11/9/2000 4:15:58 PM
|
Temporary occupancy | | | 11/9/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4079 issued 11-9-00 to the Foster Parking Garage.
|
BLD-Final | 11/6/2000 | 11/7/2000 | 11/7/2000 | P | FAIL |
Jim Storey
|
|
|
FN TOM ###-#### c/n isued 4 hr p/l protection not complet. ok for temp upon completion of this isue. other isues can be completed on temp occ time frame. 11/7/2000 3:16:07 PM
|
FIRE-Final Inspection | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PASS |
Rick Jackson
|
|
|
TOM ###-#### FIRE FN
|
BLD-Conference | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/7/2000 3:38:48 PM w/ 301 re final insp c/n issued.
|
Code Occupancy Approval | | | 11/3/2000 | | FAIL |
|
|
|
landscape, block face and paint not completed, need to bond for a total of $11,000 to sign temp
|
BLD-Final | 10/26/2000 | 10/30/2000 | 10/30/2000 | P | PART |
Jim Storey
|
|
|
FN -TOM ###-#### fire stopping in progess ok for four hr assemblie. 10/31/2000 11:42:40 AM
|
FIRE-Final Inspection | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 10/30/2000 need all rated glazing installed and door hardware; extinguishers; generator load test; bumper block at gas meter; c/n issued 10/30/2000 2:08:47 PM
|
BLD-Final | 10/20/2000 | 10/26/2000 | 10/26/2000 | P | CANC |
Jim Storey
|
|
|
fn --tom-- ###-####
|
BLD-Final | 10/24/2000 | 10/26/2000 | 10/26/2000 | P | CANC |
Jim Storey
|
|
|
FN OCC- DAVE- ###-####
|
BLD-Framing/Rough-in | 10/6/2000 | 10/12/2000 | 10/12/2000 | P | FAIL |
Jim Storey
|
|
|
fr insp tom ###-#### 4 hr wall not complet/need all special insp. and pt log./ exit signage 100 ft visablity isue/3/4 1 hr at stairs infill./ duct from tennent space to storage qustion of occ. sepration horisontal. engineering and arch. changes to be submited. 10/13/2000 5:24:41 PM
|
BLD-Other | 9/13/2000 | 9/13/2000 | 9/13/2000 | | PASS |
|
|
|
Dave Hattrick and 305 reviewd existing cable rails on 9-12-2000 we found that as currently constucted they will not meet the criteria that was outlined to myself, perry paine and jim storey and as on file with the inspector which stated they met national application and a 4" wedge could not be plulled through the spaces between the guard rails at 30 pounds of pull. I will notify contractor of our findings, rails shall be in compliance with UBC as they were directed.
|
BLD-Framing/Rough-in | 8/25/2000 | 8/30/2000 | 8/30/2000 | A | FAIL |
Jim Storey
|
|
|
WEST EQUIP ROOM ROOF---TOM ###-#### -- no ancer on phone or person on site to contact. 8/30/2000 3:46:29 PM
|
BLD-Framing/Rough-in | 8/25/2000 | 8/30/2000 | 8/30/2000 | A | FAIL |
|
|
|
WEST EQUIP ROOM ROOF---TOM ###-#### -- no one on site by 301 9/1/2000 10:46:37 AM
|
BLD-Framing/Rough-in | 8/25/2000 | 8/28/2000 | 8/28/2000 | A | PART |
|
|
|
REBAR INSP--###-#### -TOM--WEST EQUIP ROOM WALLS pending sp insp approvals 8/29/2000 10:12:49 AM
|
BLD-Concrete | 8/21/2000 | 8/23/2000 | 8/23/2000 | P | PART |
|
|
|
east stair tower beams and columns 7th and 8th floor ###-#### pending sp insp aprovals 8/24/2000 9:45:50 AM
|
BLD-Concrete | 8/21/2000 | 8/22/2000 | 8/22/2000 | P | PART |
|
|
|
west stair tower beams and columns 7th to 8th floor ###-#### pending sp insp approvals 8/22/00 10:02:37 AM
|
BLD-Concrete | 8/18/2000 | 8/21/2000 | 8/21/2000 | A | PART |
|
|
|
level 6 and 7\\###-#### Tom pending sp insp approvals 8/21/00 11:15:20 AM
|
BLD-Foundation | 8/16/2000 | 8/17/2000 | 8/17/2000 | A | PART |
|
|
|
rebar Tom ###-#### west stair tower level 6,beams pending sp insp approvals 8/17/2000 3:26:59 PM
|
BLD-Concrete | 8/16/2000 | 8/16/2000 | 8/16/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 07:01:53. Contact: ###-####. pending sp insp approvals 8/16/2000 3:31:52 PM
|
Plan resubmittals received | | | 8/10/2000 | | DONE |
|
|
|
RECEIVED 5 COPYS OF 8 1/2 X 11 DRAWING SHOWING RIVED STORM DRAIN SYSTEM FOR STAIRWAY.5 COPYS SECTION OF THE PROPOSED SYSTEM. 5 STORM DRAIN SYSTEM CALCULATIONS- 5 SITE MAP. ROUTED TO PERRY PAINE.8/10/2000
|
BLD-Concrete | 7/28/2000 | 7/31/2000 | 7/31/2000 | A | PART |
|
|
|
west colum and beams 3rd to 4th floors\\rebar pending sp insp approvals 7/31/2000 3:22:55 PM
|
BLD-Concrete | 7/24/2000 | 7/26/2000 | 7/26/2000 | A | PART |
|
|
|
east pent house floor ###-#### pending sp insp approvals 7/25/2000 2:30:59 PM
|
BLD-Concrete | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | PART |
|
|
|
location 2nd to 3rd level west beams ###-#### with sp insp approval 7/25/2000 11:32:56 AM
|
BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | PART |
|
|
|
beams & columns for 2nd to 3rd level--east core-- tom ###-#### pending sp insp approvals 7/21/2000 3:00:42 PM
|
BLD-Foundation | 7/18/2000 | 7/19/2000 | 7/19/2000 | P | PART |
|
|
|
pouring around noon tom for re-bar east eigth floor walls Tom ###-#### pending sp insp approals 7/19/2000 10:27:29 PM
|
BLD-Concrete | 7/12/2000 | 7/17/2000 | 7/17/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 16:08:31. Contact: ###-####. pending s/i report 7/17/2000 11:30:26 AM
|
BLD-Concrete | 7/12/2000 | 7/14/2000 | 7/14/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 16:07:54. Contact: ###-####. pend sp nsp report 7/14/2000 10:02:32 AM
|
BLD-Concrete | 7/12/2000 | 7/12/2000 | 7/12/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 06:43:46. Contact: ###-####. pending sp insp approval 7/12/00 3:27:20 PM
|
BLD-Concrete | 7/7/2000 | 7/10/2000 | 7/10/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/07/2000 at 13:09:57. Contact: ###-####. for the sides and back found only 7/10/00 1:16:17 PM for the sides and back only 7/10/00 1:16:37 PM
|
BLD-Foundation | 6/29/2000 | 6/30/2000 | 6/30/2000 | A | PART |
|
|
|
rebar location 6th floor east and west elevated decks-tom ###-#### with sp insp approvals 6/30/00 1:46:33 PM
|
BLD-Concrete | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 14:43:23. Contact: ###-####. pending sp insp approvals 6/26/00 4:59:20 PM
|
BLD-Framing/Rough-in | 6/19/2000 | 6/21/2000 | 6/21/2000 | A | PART |
|
|
|
fourth level west deck re-bar Tom ###-#### with sp insp pending 6/21/00 10:24:39 AM
|
BLD-Framing/Rough-in | 6/19/2000 | 6/20/2000 | 6/20/2000 | A | PART |
|
|
|
re-bar fourth level East deck Tom ###-#### madeok with sp insp approvals 6/21/00 10:08:05 AM
|
BLD-Other | 6/16/2000 | 6/19/2000 | 6/19/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/16/2000 at 15:29:58. Contact: ###-####. r-bar in the stair tower 6/19/00 2:46:01 PM
|
BLD-Framing/Rough-in | 6/12/2000 | 6/13/2000 | 6/13/2000 | A | PART |
Jim Storey
|
|
|
re-bar 8th level west elevator core Tom ###-#### work in progess covered by special insp. 6/13/00 1:44:38 PM
|
BLD-Other | 6/7/2000 | 6/8/2000 | 6/8/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/07/2000 at 12:54:06. Contact: ###-####. with sp insp approvals 6/8/00 5:15:06 PM
|
BLD-Concrete | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 12:51:19. Contact: ###-####. made ok with sp insp approvals 6/1/00 9:15:36 AM
|
BLD-Concrete | 5/24/2000 | 5/24/2000 | 5/24/2000 | P | PART |
|
|
|
rebar 2nd floor elevator deck on the east elevator ###-#### pend sp insp approvals 5/24/00 10:56:25 AM
|
BLD-Concrete | 5/22/2000 | 5/23/2000 | 5/23/2000 | A | PART |
|
|
|
###-#### east elevator core, the 6th through 8th floor pendingsp insp aprovals 5/24/00 11:23:50 AM
|
Additional plans submitted | | | 5/19/2000 | | DONE |
|
|
|
RECEIVED ONE COPY OF LETTER AND DRAWING DISCUSSING THE USE OF WIRE GLASS IN AN INSULATED WINDOW UNIT. ROUTED TO JOHN M. KMM
|
BLD-Concrete | 5/12/2000 | 5/15/2000 | 5/15/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 15:35:26. Contact: ###-####. PENDING SP INSP APPROVALS 5/15/00 11:04:26 AM
|
BLD-Concrete | 5/15/2000 | 5/15/2000 | 5/15/2000 | P | PART |
|
|
|
Tom ###-#### east core wall 4th thru 6th floor with spinsp approvals 5/15/00 4:14:07 PM
|
BLD-Concrete | 5/5/2000 | 5/5/2000 | 5/5/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 06:48:53. Contact: ###-####. pending report from special insp. 5/5/00 11:17:56 AM
|
BLD-Concrete | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PART |
|
|
|
###-#### East tower footers with sp insp approvals 5/2/00 4:03:58 PM
|
BLD-Conference | 5/1/2000 | 5/1/2000 | 5/1/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 5/1/00 WITH dAVE ON THE GUARDRAIL INTERMEDIATE ISSUE WITH DAVE REEDER AND DAVE A WITH ARCH. GUARD RAIL IS OK FOR DEFLECTION AND HEIGHT, VEHICLE BARRIER IS OK FOR DEF PER TABLE 16...INTERMEDIATE RAILS MUST BE THAT A 4" SPHERE CANNOT PENETRATE, PERIOD. 5/1/00 11:31:11 AM
|
BLD-Concrete | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | PART |
|
|
|
LOCATION EAST CORE ELEVATORS 2ND AND 3RD LEVEL\\###-#### pending sp inspapprovals 04/21/2000 8:11:47 AM
|
BLD-Conference | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | PART |
|
|
|
conference on the guardrail req for people vehicle restraint is ok 04/21/2000 8:12:17 AM
|
BLD-Concrete | 4/12/2000 | 4/12/2000 | 4/12/2000 | P | PART |
|
|
|
west 8th floor upstand beam ###-#### ok with sp insp approvals 04/13/2000
|
BLD-Concrete | 4/10/2000 | 4/11/2000 | 4/11/2000 | A | PART |
|
|
|
8th floor\\###-#### pending sp insp approvals 04/11/2000
|
BLD-Concrete | 4/11/2000 | 4/11/2000 | 4/11/2000 | P | PART |
|
|
|
west side deck #15 and columns grid 1 A B C D E made ok with sp insp approvals 04/11/2000
|
BLD-Concrete | 4/7/2000 | 4/10/2000 | 4/10/2000 | P | PART |
|
|
|
east upstand beam level 8, colum grid 6 ghjklm\\###-####. rescheduled by 325. madeok with sp insp approvals 04/10/2000
|
BLD-Concrete | 4/7/2000 | 4/10/2000 | 4/10/2000 | P | CANC |
|
|
|
east upstand beam level 8, colum grid 6 ghjklm\\###-####. rescheduled by 325.
|
BLD-Concrete | 4/6/2000 | 4/6/2000 | 4/6/2000 | P | PART |
Jim Storey
|
|
|
EAST 8TH FLOOR ELVATED STAB\\###-#### covered by special insp.pending report. 4/6/00
|
BLD-Concrete | 4/4/2000 | 4/4/2000 | 4/4/2000 | P | PART |
|
|
|
grid 6 G H J K L M level 8 426*8984 pending sp insp reports 04/10/2000
|
BLD-Concrete | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PART |
|
|
|
7th floor grid 12456 abcdef\\###-#### pending sp insp approvals 04/03/2000
|
BLD-Concrete | 3/31/2000 | 3/31/2000 | 3/31/2000 | P | PART |
|
|
|
upstand beam at grid A 7th level , columns on Grid 1 A,B, C, D ###-#### ok with sp insp approvals 03/31/2000
|
BLD-Concrete | 3/29/2000 | 3/30/2000 | 3/30/2000 | A | PART |
|
|
|
west 7th floor floor slab ###-#### pending sp insp approvals 3/30/00 10:12:34 AM
|
BLD-Concrete | 3/28/2000 | 3/28/2000 | 3/28/2000 | P | PART |
|
|
|
grid lines 1, 1.1, 2, 6, on M and N ###-#### Dave with pending sp insp approvals 03/28/2000
|
BLD-Concrete | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 03/24/2000 at 12:25:59. Contact: ###-####. made ok pend sp insp approvals 03/27/2000 3:47:15 PM
|
BLD-Concrete | 3/27/2000 | 3/27/2000 | 3/27/2000 | | PART |
|
|
|
7th level g h j k l m 6\\###-#### with sp insp pending 03/28/2000
|
BLD-Concrete | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | PART |
|
|
|
LEVEL SEVEN WEST\\###-#### ok pending sp insp approvals 03/22/2000 2:03:53 PM
|
BLD-Concrete | 3/21/2000 | 3/21/2000 | 3/21/2000 | P | PART |
|
|
|
location level seven 1a b, 2a,b 3a, 4 5 6 bcdefg \\###-#### made ok with sp insp approvals 03/22/2000 7:01:44 AM
|
BLD-Concrete | 3/17/2000 | 3/17/2000 | 3/17/2000 | P | PART |
|
|
|
upstand beam west 6th level columns on grid 1 B,C,D,E,F,G Tom ###-#### made ok with sp insp approvals 03/17/2000 9:13:42 AM
|
BLD-Concrete | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | PART |
|
|
|
pour 11 west deck N columns of grid 2 B,C,D,E,F,G ###-#### 7th floor ok with sp insp approval 03/16/2000 10:33:59 AM
|
BLD-Concrete | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | PART |
|
|
|
west elevator core walls ###-#### Tom made ok with sp insp approval 03/16/2000 10:34:14 AM
|
BLD-Concrete | 3/15/2000 | 3/15/2000 | 3/15/2000 | P | PART |
|
|
|
###-#### columns grid 1 through 1.1 M,N,L,K,J on 6th level made ok pending sp insp approvals 03/16/2000 7:55:08 AM
|
BLD-Concrete | 3/14/2000 | 3/14/2000 | 3/14/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 03/14/2000 at 08:10:01. Contact: ###-####. made ok pending sp insp approvals 3/14/00 5:06:29 PM
|
BLD-Concrete | 3/8/2000 | 3/9/2000 | 3/9/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 12:54:31. Contact: ###-####. pending sp insp approvals 3/9/00 10:21:26 AM
|
BLD-Concrete | 3/7/2000 | 3/7/2000 | 3/7/2000 | P | PART |
|
|
|
columns on level 5 4b 5c 6d Tom ###-#### made ok to pour with sp insp approvals 3/8/00 8:55:13 AM
|
BLD-Concrete | 3/6/2000 | 3/6/2000 | 3/6/2000 | P | PART |
|
|
|
elevator east core from foundation to 2nd floor Tom ###-#### made ok with sp insp spprovels 3/6/00 5:49:28 PM
|
BLD-Concrete | 3/3/2000 | 3/3/2000 | 3/3/2000 | P | PART |
|
|
|
5th floor upstand beam and columns on Grid 1b, c ,d, e and f Tom ###-#### made ok only with sp insp approvals 3/6/00 10:34:10 AM
|
BLD-Concrete | 3/1/2000 | 3/2/2000 | 3/2/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 13:18:50. Contact: ###-####. made ok to pour pending sp insp approvals 3/2/00 3:45:55 PM
|
BLD-Concrete | 2/28/2000 | 2/29/2000 | 2/29/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 02/28/2000 at 12:17:38. Contact: ###-####. made ok pending sp insp approvals 2/28/00 3:14:38 PM
|
BLD-Foundation | 2/29/2000 | 2/29/2000 | 2/29/2000 | P | PART |
Jim Storey
|
|
|
LMN grid 6 level 5 and N1 and M1 columns on level 5 Tom ###-#### LMW grid level 5, N1 M1 columns level 5 pending spec. insp. report. 3/1/00 11:13:03 AM
|
BLD-Concrete | 2/25/2000 | 2/25/2000 | 2/25/2000 | P | PART |
|
|
|
5th floor grid 1 G, H, J, K, L, columns 5th floor grid N upstand beam ###-#### made ok pending sp insp report 2/25/00 11:44:54 AM
|
BLD-Concrete | 2/24/2000 | 2/24/2000 | 2/24/2000 | P | PART |
|
|
|
5th floor slab east Tom ###-#### made ok with sp insp approvals 2/25/00 11:23:52 AM
|
BLD-Concrete | 2/22/2000 | 2/22/2000 | 2/22/2000 | P | PART |
|
|
|
columns on 5th floor 2A , 3A, 2B, 4B, and 5C ###-#### made ok pending sp insp approvals 2/22/00 5:30:15 PM
|
BLD-Concrete | 2/17/2000 | 2/18/2000 | 2/18/2000 | P | PART |
Jim Storey
|
|
|
tom ###-#### --upstand beam w. end of the 4th level--columns- grid # 1-b,c,d,e, & f Pend SSI report. 2/22/00 10:11:51 AM
|
BLD-Concrete | 2/16/2000 | 2/16/2000 | 2/17/2000 | P | PART |
Jim Storey
|
|
|
###-#### tom 4th floor west slab Work in progress pending reports from special inspection agency. 2/17/00 10:07:08 AM
|
BLD-Concrete | 2/15/2000 | 2/15/2000 | 2/15/2000 | P | PART |
Jim Storey
|
|
|
grid L, K, & J on 4th floor, north wall ramp ###-#### pending special insp. report. 2/16/00 10:05:45 AM
|
BLD-Concrete | 2/14/2000 | 2/14/2000 | 2/14/2000 | P | PART |
Jim Storey
|
|
|
###-#### location grid N1 1.1 2 and 6 m2 m1 Placed w/special insp. pending report. 2/15/00 9:28:06 AM
|
BLD-Concrete | 2/11/2000 | 2/11/2000 | 2/11/2000 | P | PART |
|
|
|
grid line 6 G H K L M N upstand beam on N ###-#### made ok with sp insp approvals pending 2/11/00 5:42:20 PM
|
BLD-Concrete | 2/9/2000 | 2/9/2000 | 2/9/2000 | P | PART |
|
|
|
slab 4th floor\\###-#### made ok to pour pending sp insp approvals 2/10/00 10:26:18 AM
|
BLD-Concrete | 2/4/2000 | 2/4/2000 | 2/4/2000 | P | PART |
|
|
|
tom ###-#### concrete columns a 1,2, & 3---- 3rd level made pending sp insp approvals r-bar is placed 2/8/00 8:18:59 AM
|
BLD-Concrete | 2/3/2000 | 2/3/2000 | 2/3/2000 | P | PART |
|
|
|
up turn beam on grid line A madeok with sp insp approvals r-bar is placed 2/8/00 8:37:52 AM
|
BLD-Concrete | 1/31/2000 | 2/1/2000 | 2/1/2000 | A | PART |
|
|
|
Pour #5 elevated slab. Tom; ###-####. made ok with sp insp approval 2/1/00 4:42:07 PM
|
BLD-Concrete | 1/25/2000 | 1/26/2000 | 1/26/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/25/2000 at 12:33:36. Contact: ###-####. pending sp insp approvals 1/26/00 10:44:58 AM
|
BLD-Concrete | 1/26/2000 | 1/26/2000 | 1/26/2000 | P | PART |
|
|
|
dave reeder- ###-####--grid line 6, columns l. m. n, grid line 2, m, n, 3rd level r-bar placed sp insp ok 1/27/00 6:47:40 PM
|
BLD-Concrete | 1/24/2000 | 1/24/2000 | 1/24/2000 | P | PART |
|
|
|
###-#### Tom columns A 1, 2, 3 and B 4 , C 4 , D, E, F, G, 6 and foundation for elevator 2 and 3 made ok with sp insp approval pending 2/10/00 11:36:27 AM
|
BLD-Footing | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | PART |
|
|
|
upside beam on 3rd level--on n line--###-####-tom r-bar placed sp inspection approval still pending ok to pour with same 1/21/00 10:46:47 AM
|
BLD-Concrete | 1/19/2000 | 1/20/2000 | 1/20/2000 | A | PART |
|
|
|
###-#### made ok to pour columns the r-bar is inspected and passed by myself and sp insp 1/20/00 11:46:57 AM
|
BLD-Concrete | 1/19/2000 | 1/19/2000 | 1/19/2000 | P | PART |
|
|
|
###-#### WALK THROUGH WITH SUPER ON GUARDRAIL ELEVATIONS APPROVED FIX FOR ELEVATION CHANGE FOR THE BOTTOM CABLE USED FOR SAME 1/20/00 1:40:47 PM
|
BLD-Concrete | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | FAIL |
Jim Storey
|
|
|
###-#### TOM\\COL B C D E F ALL IN LINE ONE SECOND DECK, Col. ok pending SI report work in progress/c/n issued for col link 2 39 inch e/u for gaurdrail cabbles will not meet 42 inch min submit change.
|
BLD-Concrete | 1/11/2000 | 1/11/2000 | 1/11/2000 | P | PART |
|
|
|
made ok with sp insp approvals r-bar placed
|
BLD-Concrete | 1/5/2000 | 1/6/2000 | 1/6/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/05/2000 at 12:52:50. Contact: ###-####.
|
BLD-Concrete | 1/3/2000 | 1/3/2000 | 1/3/2000 | P | part |
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 10:12:03. Contact: ###-####.r-bar placed made ok w sp insp
|
BLD-Concrete | 12/27/1999 | 12/28/1999 | 12/28/1999 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 13:25:14. Contact: ###-####. Made ok R-bar placed sp. insp. ok.
|
BLD-Footing | 12/17/1999 | 12/17/1999 | 12/17/1999 | P | PART |
|
|
|
dave--- ###-#### ft --north ft for stairs R-bar placed sp. Insp. Onsite.
|
BLD-Concrete | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | PART |
|
|
|
grid lines A to G and from grid line 2 to 6 R-bar placed ok to pour.
|
BLD-Concrete | 12/7/1999 | 12/8/1999 | 12/8/1999 | P | PART |
|
|
|
###-####--TOM CONCRETE---RETENSION TANK FLOOR-WEST SLAB- & UPSTAND BEAM Ok to pour- sp. Insp. Made ok- R-bar placed.
|
BLD-Concrete | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | PART |
|
|
|
elevated slab grid line 1 to 2, grid line g to n, PT Ok with sp. Insp. Approvals. R-bar placed.
|
BLD-Foundation | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | PART |
|
|
|
###-####--tom -pour re-bar for columns-d1, d2, a1 Ok to pour R-bar placd sp. Insp. Approved.
|
BLD-Foundation | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | PART |
|
|
|
tom --- e1, e2, f1, f2 on 2nd floor----###-#### -rebar Made ok R-bar placed spec. insp. Ok.
|
BLD-Foundation | 11/23/1999 | 11/23/1999 | 11/23/1999 | P | PART |
|
|
|
Dave ###-#### west stair way walls Ok to pour w/sp insp. Approval; R-bar placed.
|
BLD-Foundation | 11/18/1999 | 11/22/1999 | 11/22/1999 | A | PART |
|
|
|
WEST STAIRWELL FOOTING --- ###-####--DAVE ###-#### made ok R-bar placed sp. Insp. On site.
|
BLD-Foundation | 11/18/1999 | 11/22/1999 | 11/22/1999 | A | PART |
|
|
|
BETWEEN GRID LINE 2 & 6 --FOUND? DAVE ###-#### Ok to pour sp. Insp. On site.
|
BLD-Concrete | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | PART |
|
|
|
GRID LINE 6, 3 COLUMNS--PILE CAP, GRID LINE A & 1 ---DAVE ###-#### Made ok w/spec. insp. Approvals.
|
BLD-Concrete | 11/16/1999 | 11/16/1999 | 11/16/1999 | | PART |
|
|
|
grid g to n and grid line 1 to 2 made ok w/sp insp. Approval.
walls: grid line 6 to 2
|
BLD-Concrete | 11/9/1999 | 11/10/1999 | 11/10/1999 | A | PART |
|
|
|
rebar columns grid lines 1 k j h & m dave ###-#### Ok to cover W/sp insp approval.
|
BLD-Foundation | 11/4/1999 | 11/4/1999 | 11/4/1999 | P | PART |
|
|
|
REBAR FOR A STEPPED FOOTER BETWEEN N 1.1 TO N 6 LATER THAN 2:00 PLEASE TOM ###-#### Ok to pour w/ sp insp. Approval R-bar placed.
|
BLD-Footing | 11/3/1999 | 11/3/1999 | 11/3/1999 | P | PART |
|
|
|
REBAR GRID LINES N 2 -6 DAVE ###-#### R-bar placed made ok w/sp insp. Approval
|
Plan resubmittals received | | | 11/3/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM DAVID RUBY, FORWARDED SAME TO PLUMBING.11/3/99 DAR
|
BLD-Concrete | 10/29/1999 | 11/1/1999 | 11/1/1999 | A | PART |
|
|
|
elevated floor slab ###-#### P/T deck #1 ok to pour w/sp insp. Approval
|
BLD-Concrete | 10/28/1999 | 10/29/1999 | 10/29/1999 | A | PART |
|
|
|
###-####---dave concrete columns--grid e6, j6, k6, L6 Made ok to pour w/spec. insp. Ok
|
BLD-Foundation | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | PART |
|
|
|
location 2-H and 2-J pile caps tom ###-#### Made ok w/spe. Insp. Approval / R-bar placed
|
BLD-Footing | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | PART |
|
|
|
###-#### GRID LINES 2-6 BETWEEN K-N Ok to pour at sp insp. Approval
|
BLD-Conference | 10/26/1999 | 10/26/1999 | 10/26/1999 | A | PART |
|
|
|
Conf. with super on air entramment for deck concrete
|
(F) Reprint permit | | | 10/21/1999 | | DONE |
|
|
|
|
Routing Off Site - A.C.H.D | 10/20/1999 | 10/20/1999 | 10/20/1999 | | DONE |
|
|
|
Per Gary with ACHD no fees on parking structure, they do have a issue with a License agreement but this has nothing to do with issuing the building permit.rad10-20-99
|
Issue PAID IN FULL permit | | | 10/20/1999 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/1999 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/19/1999 | | DONE |
|
|
|
|
Telephone call | | | 10/19/1999 | | DONE |
|
|
|
###-#### called permit ready left fees w/answerer 10/19/1999
|
Plan assigned to (JCM) | 7/9/1999 | | 10/19/1999 | | PASS |
John Menard
|
|
|
10/19/1999 08:22:42 JCM - activity updated through activity BLDA022 from case BLD99-02049.
|
Routing Off Site - STRUCTURAL | 9/27/1999 | 9/27/1999 | 10/18/1999 | | PASS |
|
|
|
FAXED THE CONSULTING ENGINEER THE RESPONSES FROM THE ENGINEER OF RECORD FOR THE SEPTEMBER 10TH COMMENT LIST.
|
Routing - PUBLIC WORKS | 10/15/1999 | | 10/18/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/15/1999 | 10/15/1999 | 10/15/1999 | | FAIL |
|
|
|
DRAINAGE PLAN REQUIRES ACHD APPROVAL PE BRIAN MURPHY. 10/15/99 DAR
|
Routing - PLAN CHECK | 10/15/1999 | 10/15/1999 | 10/15/1999 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 9/7/1999 | 9/7/1999 | 10/15/1999 | | PEND |
|
|
|
|
Additional plans submitted | | | 10/15/1999 | | PEND |
|
|
|
RECEIVED COPY OF STORM DRAIN LICENSE AGREEMENT, FORWARDED SAME TO JOHN MENARD, 10/15/99 DAR
|
Plan resubmittals received | | | 10/13/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM HOSFORD LARSON RUDEEN, FORWARDED SAME TO JOHN MENARD. 10/13/99
|
Plan resubmittals received | | | 10/11/1999 | | PEND |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM HOSFORD, LARSON, RUDEEN, FORWARDED SAME TO JOHN MENARD.10/11/99 DAR
|
Plan resubmittals requested | | | 10/9/1999 | | PEND |
|
|
|
MAILED DAVE BLODGETT A LETTER IN RESPONSE TO THE LETTER AND PARTIAL RESPONSE TO THE PRELIMINARY PLAN REVIEW COMMENT LIST. THE LETTER SENT TO MR. BLODGETT REQUESTED ADDITIONAL REVISIONS.
|
Plan resubmittals received | | | 10/4/1999 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A2.02, A0.02, A2.06. PLAN REVIEW ITEM #52 MEMO, AND PLAN REVIEW ITEM #21. ROUTED TO JOHN M. KMM
|
Plan resubmittals received | | | 9/29/1999 | | DONE |
|
|
|
RECEIVED ONE COPY OF VEHICLE BARRIER MEMO WITH ATTACHMENTS. ROUTED TO JOHN M. KMM
|
Plan resubmittals received | | | 9/16/1999 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A1.00-SITE PLAN (FIRE HYDRANT LOCATION). SHEETS C2.01, C2.02- UTILITY EXTENSIONS (FIRE HYDRANT). SHEETS A2.00 AND 2.05-A2.10 ENLARGED FLOOR PLANS (FIRE EXTINGUISHERS). SHEET P2.01 AND P3.01 (FIRE SUPPLY LINE) ROUTED TO JOHN M. KMM
|
Plan resubmittals received | | | 9/13/1999 | | PEND |
John Menard
|
|
|
RECEIVED PLAN RESUBMITTALS FROM HOSFORD, LARSON, RUDEEN, FORWARDED SAME TO JOHN MENARD. 9/13/99 DAR.
|
Plan resubmittals received | | | 9/13/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM HOSFORD, LARSON, RUDEEN, FORWARDED SAME TO JOHN MENARD. 9/7/99 DAR
|
Routing Off Site - STRUCTURAL | 8/26/1999 | | 9/13/1999 | | PEND |
|
|
|
SENDING REVISED STRUCTURAL TO STRUCTURAL ENGINEERING CONSULTANT. 8/26/99 DAR
|
Routing - FIRE | 9/1/1999 | 9/7/1999 | 9/7/1999 | | PASS |
Bill Alexander
|
|
|
Answered denied notes with acceptale responses.
|
Routing - FIRE | 8/31/1999 | | 8/31/1999 | | FAIL |
|
|
|
Need information on fuel storage and piping issues for generator at its location on the plans. Answered and received approval from Dave Miller 08/27/99 on extinguisher new hydrant needed and underground burried lines for fire line supplies.
|
Plan resubmittals received | | | 8/26/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM HOSFORD LARSON RUDEEN, FORWARDED SAME TO JOHN MENARD. 8/26/99 DAR
|
Plan resubmittals requested | | | 8/18/1999 | | PEND |
|
|
|
FAXED DAVID BLODGETT AT HOSFORD-LARSON-RUDEEN A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING REVISIONS.
|
Routing Off Site - STRUCTURAL | 8/4/1999 | | 8/17/1999 | | FAIL |
|
|
|
FAXED A REQUEST FOR THE REVIEW OF THE SUPERSTRUCTURE OF THIS BUILDING. THE PLANS AND CALCUALTIONS WERE SENT WITH THE FOUNDATION REVIEW PACKAGE. JCM/08/04/99 RECIEVED COMMENT LIST FORM CONSULTING ENGINEER REQUESTING REVISIONS. JCM/0817/99
|
Routing - FIRE | 8/3/1999 | | 8/5/1999 | | FAIL |
|
|
|
UFC issues with fuel storage, underground fire line under floor slabs, hydrant locations and fire flows.
|
Plan Review Completed(1st rev) | | | 8/5/1999 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 8/3/1999 | | PEND |
|
|
|
MAILED DAVE BLODGETT AT HOSFORD-LARSON-RUDEEN A COPY OF THE PRELIMINARY PLAN REVIEW COMMENT LIST REQUESTING REVISIONS.
|
Routing - PLAN CHECK | 7/22/1999 | | 8/3/1999 | | PEND |
|
|
|
|
Routing - PLUMBING | 7/20/1999 | | 7/22/1999 | | PASS |
|
|
|
UPC 701.1.2- THIS IS A CAST IRON JOB, PER PLANS AND 97 UPC
|
Routing - PLANNING | 7/14/1999 | | 7/20/1999 | | PASS |
|
|
|
x-ref. drh98-0244
|
Plan Reviewer's activity | | | 7/15/1999 | | PEND |
|
|
|
MET WITH DAVID BLODGETT OF HOSFORD-LARSON-RUDEEN TO DISCUSS THE SUBMITTAL REQUIREMENTS FOR EACH OF THE PERMIT PACKAGES. HE ALSO GAVE ME CIVIL SHEETS TO INSERT INTO THIS PERMIT PACKAGE. I INSERTED THOSE SHEETS AND RETURNED THEM TO TEMPRA WILSON IN PLANNING.
|
Routing - PUBLIC WORKS | 7/9/1999 | | 7/14/1999 | | FAIL |
|
|
|
Requires drainage permit and clearance from ACHD, PER BRIAN MURPHY. DAR 07/14/99
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/1999 | | PASS |
|
|
|
SPOKE WITH GENE BENNETT ABOUT NOT HAVING STRUCT. PLANS OR CALCS. HE STATED STRUCT. FOR WHOLE BLD. WAS SUBMITTED ALONG WITH FOUNDATION PERMIT. I WILL ASK JOHN M. ABOUT THIS ON WED. 7-14-99 KMM
|
Plan routing begun/NEW & ADDTN | 7/9/1999 | | 7/9/1999 | | |
|
|
|
|
Received Certificate of Value | | | 7/9/1999 | | PASS |
|
|
|
|
Application received | | | 7/8/1999 | | |
|
|
|
|