Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02055
StatusFinaled
Name THOMPSON SAMUEL & VERDA
Site Address 3007 N OVERLOOK RD
Project NameLEISURE VILLA
Customer Number 
ePlanReviewNo
Description
BUILDING TYPE "A" * TO CONSTRUCT A NEW 5,072 SQ.FT. TWO STORY WOOD FRAMED, TYPE V ONE-HOUR EIGHT UNIT APARTMENT BUILDING. THE FIRST FLOOR CONTAINS 4 TYPE I UNITS AT 634 SQ.FT. EACH AND THE SECOND FLOOR CONTAINS 4 TYPE I UNITS AT 634 SQ.FT. EACH. ALL WORK PER THE APPROVED PLANS, ATTACHED COMMENT LIST AND THE 1997 EDITION OF THE UBC. ADDITIONAL WORK ON THIS PERMIT INCLUDE SITE UTILITIES, PARKING AREA AND LANDSCAPING. NOTE THIS BUILDING IS ONE-HOUR DO TO FIRE FLOW REQUIREMETNS. MJP PC # DRH99-0097
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/18/20036/18/20036/18/2003 DONE
Permanent Occupancy 1/29/20011/29/2001 DONE
Details
BLD-Final1/26/20011/29/20011/29/2001APASS
DetailsCarl Dependahl
Permanent occupancy  1/29/2001 DONE
Perm. Occ. Cert. #8548 issued 1-29-01 to the Leisure Villa Apts.
Fee Review-notes7/8/1999 11/27/2000 DONE
Temporary occupancy  10/31/2000 PART
Temp. Occ. Cert. #4073 issued 10-31-00 to the Leisure Villa Apts.
BLD-Final10/27/200010/30/200010/30/2000APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/27/2000 at 13:54:51. Contact: ###-####.
BLD-Conference10/30/200010/30/200010/30/2000APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/30/2000 w/ dave
BLD-Other10/25/200010/26/200010/26/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/25/2000 at 10:15:50. Contact: ###-####.
FIRE-Final Inspection10/25/200010/25/200010/25/2000PPASS
DetailsJoe Tawney
###-####. Final OK for permanant occupancy 10/26/2000 8:04:22 AM
BLD-Framing/Rough-in8/1/20008/2/20008/2/2000APART
DetailsCarl Dependahl
RC Channel ###-#### Mike
BLD-Energy code compliance7/27/20007/31/20007/31/2000APART
DetailsCarl Dependahl
Mike ###-####; part, reviewing wattsun submitted. 7/31/2000 9:37:07 AM
BLD-Energy code compliance7/31/20007/31/20007/31/2000PPART
DetailsCarl Dependahl
mike ###-#### energy code; complete furr-outs, etc ok to ins. 7/31/2000 5:07:50 PM
BLD-Energy code compliance7/26/20007/27/20007/26/2000APART
DetailsCarl Dependahl
Mike ###-####
BLD-Framing/Rough-in7/26/20007/27/20007/26/2000APART
DetailsCarl Dependahl
Mike ###-####
BLD-Energy code compliance7/26/20007/26/20007/26/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 7/26/2000 ins ok pending new wattsun
BLD-Framing/Rough-in7/26/20007/26/20007/26/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 7/26/2000 ok to cover, need insp for fasteners 7/26/2000 5:42:47 PM
BLD-Framing/Rough-in7/20/20007/24/20007/24/2000ANR
DetailsCarl Dependahl
Mike ###-####; keep c/n for firestops 7/24/2000 10:29:23 AM;show detail for r.c. at 1st fl.
7/24/2000 10:31:15 AM
BLD-Framing/Rough-in6/16/20006/16/20006/16/2000PPART
DetailsTom Arcoraci
SHEETROCK ON SOFFIT mIKE ###-#### dry wall on soffia 6/19/00 2:01:52 PM
BLD-Framing/Rough-in6/7/20006/7/20006/7/2000PPART
DetailsTom Arcoraci
shear mike ###-####
BLD-Framing/Rough-in6/1/20006/2/20006/2/2000PPART
DetailsCarl Dependahl
lower wall outside shear insp Mike ###-#### 1st floor "shear" ok; ok to add gypsum. 6/5/00 10:47:58 AM
BLD-Framing/Rough-in5/26/20005/30/20005/30/2000APART
DetailsJim Sly
1 & 2nd story shear wall ins--mike ###-#### Shear nailing ok 2nd story only. 5/30/00 3:45:28 PM
BLD-Foundation5/4/20005/4/20005/4/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/04/2000 at 06:11:10. Contact: ###-####. Bldg. "A-Z" walls, "B" ftgs appear ok 5/5/00 10:05:22 AM
BLD-Footing5/3/20005/3/20005/3/2000PPASS
DetailsTom Arcoraci
###-####
Plan resubmittals received  5/2/2000 DONE
RECEIVED PLAN RESUBS AND WATTSUN CACULATIONS TO CHANGE FURNACES FROM GAS TO ELECTRIC ROM TAMURA ARCHITECTS, MAKR SANDERS, FORWARDED SAME TO TOM ARCORACI. 5/2/00 DAR
Issue PAID IN FULL permit  4/21/2000 DONE
Routing - PLAN CHECK3/28/2000 4/20/2000 PEND
Plan Reviewer's activity  4/20/2000 DONE
Print Pending Permit.LaserJet4  4/20/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/20/2000 DONE
Case Summary (BLD)  4/20/2000 DONE
Print Pending Permit.LaserJet4  4/20/2000 DONE
Print Occupancy Form  4/20/2000 DONE
Inspection Record Card- Bld  4/20/2000 DONE
Telephone call  4/20/2000 DONE
Plan assigned to (M_P)7/12/1999 4/20/2000 PASS
DetailsMike Phillips
4/20/2000 10:47:41 M_P - activity updated through activity BLDA022 from case BLD99-02055.
Plan resubmittals received  4/19/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS A1.0, A2.0, A2.1, A8.0, A9.1 AND ONE COPY OF CALCS. ROUTED TO MIKE P. KMM
Plan resubmittals received  4/6/2000 DONE
RECEIVED PLAN RESUBMITTALS, FROM TAMURA AND ASSOCIATES, MARK SANDERS. FORWARDED SAME TO MIKE PHILLIPS. 4/6/00 DAR
Routing - FIRE3/27/20003/28/20003/28/2000 PASS
DetailsBill Alexander
Provided letter from Capitol Water provideding 1,500 GPM required.
Routing - PLAN CHECK12/16/1999 3/27/2000  
routing to fire
Routing - FIRE12/15/199912/15/199912/16/1999 FAIL
BUILDING - Need hydrant fire flows of 1500 gpm minimum per UFC.
Plan Review Completed(1st rev)  12/16/1999  
BUILDING
Plan resubmittals requested  12/15/1999 FAIL
Requested additional information for further review.
Print Pending Permit.LaserJet4  12/15/1999 FAIL
Additional informaiton required to be submitted for further review.
Plan resubmittals received  12/9/1999 DONE
RECEIVED ONE COPY OF SHEETSC1.0, A1.1, A5.1, A6.0, A9.0, A9.1, E2.0, AND TWO COPIES OF SHEETS A5.0. ROUTED TO MIKE P. KMM
Plan resubmittals received  12/2/1999 DONE
RECEIVED PLAN RESUBMITTALS FROM MARK SANDERS, ARCHITECTRUAL AND MECHANICAL SHEETS AND STRUCTURAL CACULATIONS. 12/2/99 DAR
Routing - FIRE11/29/199911/29/199911/29/1999 PASS
ROUTED TO FIRE FOR GRADING ONLY AT THIS TIME. KMM NEEDED WATER FLOWS. NO BUILDING UNTIL PROVIDED.
Routing - PLAN CHECK11/24/1999 11/29/1999 PEND
Plan resubmittals received  11/26/1999 DONE
received three copies of revised sheet a1.0 routed to marlene . kmm
Routing - FIRE11/23/199911/23/199911/24/1999 PEND
GRADING - Need fire access plot plan for area. Need info on south new structures blocked lane (bollards). Need fire hydrant locations and water flows verified by water purveyor. ALL PROVIDED EXCEPT WATER FLOW.
Plan Review Completed(1st rev)  11/24/1999 FAIL
GRADING
Routing - PUBLIC WORKS10/6/199910/6/199911/23/1999 DONE
Routing - PLUMBING10/15/199910/15/199911/23/1999 DONE
Routing - PLAN CHECK10/12/199910/12/199910/15/1999  
Routing to Plumbing.
Plan Reviewer's activity  10/14/1999 FAIL
Plan revisions have not been submitted. Called Mark Sanders to confirm new plans have not been subimitted for review.
Plan resubmittals received  10/14/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM TAMURA AND ASSOCIATES, FORWARDED SAME TO MIKE PHILLIPS. 10/14/99 DAR
Routing - PLAN CHECK9/28/19999/28/199910/6/1999 DONE
Routing to P.W.
Routing - PUBLIC WORKS9/27/19999/27/19999/28/1999 FAIL
Routing - PLAN CHECK9/21/19999/21/19999/27/1999 PEND
Routing to P.W.
Routing - PLUMBING9/16/1999 9/21/1999 FAIL
Routing - PLANNING  9/16/1999 PASS
Approve per revised landscape plan dated rec. 9/16/99 and per conditions of DRH99-0097
Routing - PLAN CHECK8/12/1999 9/9/1999 PEND
Telephone call  8/12/1999 HOLD
Called and talked to Mark Sanders he will be submitting new plans revising the buildings and lay out.
Routing - PLANNING7/30/1999 8/5/1999 PASS
Pending Design Review approval.
Routing - PUBLIC WORKS7/23/1999 7/30/1999 FAIL
Failed with Brian Murphy and Bill Colson.
Plan Reviewer's activity  7/21/1999
Removed from hold application received.
Plan Reviewer's activity  7/12/1999 HOLD
WAITING FOR ADDITIONAL APPLICATIONS TO BE SUBMITTED.
Plan assigned to (MYS)7/8/1999 7/12/1999
DetailsMarlene Southard
Application received  7/8/1999