Fee Review-notes | 6/18/2003 | 6/18/2003 | 6/18/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/29/2001 | 1/29/2001 | | DONE |
|
|
|
|
BLD-Final | 1/26/2001 | 1/29/2001 | 1/29/2001 | A | PASS |
Carl Dependahl
|
|
|
|
Permanent occupancy | | | 1/29/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8548 issued 1-29-01 to the Leisure Villa Apts.
|
Fee Review-notes | 7/8/1999 | | 11/27/2000 | | DONE |
|
|
|
|
Temporary occupancy | | | 10/31/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4073 issued 10-31-00 to the Leisure Villa Apts.
|
BLD-Final | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/27/2000 at 13:54:51. Contact: ###-####.
|
BLD-Conference | 10/30/2000 | 10/30/2000 | 10/30/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/30/2000 w/ dave
|
BLD-Other | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 10:15:50. Contact: ###-####.
|
FIRE-Final Inspection | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | PASS |
Joe Tawney
|
|
|
###-####. Final OK for permanant occupancy 10/26/2000 8:04:22 AM
|
BLD-Framing/Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PART |
Carl Dependahl
|
|
|
RC Channel ###-#### Mike
|
BLD-Energy code compliance | 7/27/2000 | 7/31/2000 | 7/31/2000 | A | PART |
Carl Dependahl
|
|
|
Mike ###-####; part, reviewing wattsun submitted. 7/31/2000 9:37:07 AM
|
BLD-Energy code compliance | 7/31/2000 | 7/31/2000 | 7/31/2000 | P | PART |
Carl Dependahl
|
|
|
mike ###-#### energy code; complete furr-outs, etc ok to ins. 7/31/2000 5:07:50 PM
|
BLD-Energy code compliance | 7/26/2000 | 7/27/2000 | 7/26/2000 | A | PART |
Carl Dependahl
|
|
|
Mike ###-####
|
BLD-Framing/Rough-in | 7/26/2000 | 7/27/2000 | 7/26/2000 | A | PART |
Carl Dependahl
|
|
|
Mike ###-####
|
BLD-Energy code compliance | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/26/2000 ins ok pending new wattsun
|
BLD-Framing/Rough-in | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/26/2000 ok to cover, need insp for fasteners 7/26/2000 5:42:47 PM
|
BLD-Framing/Rough-in | 7/20/2000 | 7/24/2000 | 7/24/2000 | A | NR |
Carl Dependahl
|
|
|
Mike ###-####; keep c/n for firestops 7/24/2000 10:29:23 AM;show detail for r.c. at 1st fl.
7/24/2000 10:31:15 AM
|
BLD-Framing/Rough-in | 6/16/2000 | 6/16/2000 | 6/16/2000 | P | PART |
Tom Arcoraci
|
|
|
SHEETROCK ON SOFFIT mIKE ###-#### dry wall on soffia 6/19/00 2:01:52 PM
|
BLD-Framing/Rough-in | 6/7/2000 | 6/7/2000 | 6/7/2000 | P | PART |
Tom Arcoraci
|
|
|
shear mike ###-####
|
BLD-Framing/Rough-in | 6/1/2000 | 6/2/2000 | 6/2/2000 | P | PART |
Carl Dependahl
|
|
|
lower wall outside shear insp Mike ###-#### 1st floor "shear" ok; ok to add gypsum. 6/5/00 10:47:58 AM
|
BLD-Framing/Rough-in | 5/26/2000 | 5/30/2000 | 5/30/2000 | A | PART |
Jim Sly
|
|
|
1 & 2nd story shear wall ins--mike ###-#### Shear nailing ok 2nd story only. 5/30/00 3:45:28 PM
|
BLD-Foundation | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 06:11:10. Contact: ###-####. Bldg. "A-Z" walls, "B" ftgs appear ok 5/5/00 10:05:22 AM
|
BLD-Footing | 5/3/2000 | 5/3/2000 | 5/3/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
Plan resubmittals received | | | 5/2/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBS AND WATTSUN CACULATIONS TO CHANGE FURNACES FROM GAS TO ELECTRIC ROM TAMURA ARCHITECTS, MAKR SANDERS, FORWARDED SAME TO TOM ARCORACI. 5/2/00 DAR
|
Issue PAID IN FULL permit | | | 4/21/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/28/2000 | | 4/20/2000 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 4/20/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/20/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/20/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/20/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/20/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/20/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2000 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 7/12/1999 | | 4/20/2000 | | PASS |
Mike Phillips
|
|
|
4/20/2000 10:47:41 M_P - activity updated through activity BLDA022 from case BLD99-02055.
|
Plan resubmittals received | | | 4/19/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A1.0, A2.0, A2.1, A8.0, A9.1 AND ONE COPY OF CALCS. ROUTED TO MIKE P. KMM
|
Plan resubmittals received | | | 4/6/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS, FROM TAMURA AND ASSOCIATES, MARK SANDERS. FORWARDED SAME TO MIKE PHILLIPS. 4/6/00 DAR
|
Routing - FIRE | 3/27/2000 | 3/28/2000 | 3/28/2000 | | PASS |
Bill Alexander
|
|
|
Provided letter from Capitol Water provideding 1,500 GPM required.
|
Routing - PLAN CHECK | 12/16/1999 | | 3/27/2000 | | |
|
|
|
routing to fire
|
Routing - FIRE | 12/15/1999 | 12/15/1999 | 12/16/1999 | | FAIL |
|
|
|
BUILDING - Need hydrant fire flows of 1500 gpm minimum per UFC.
|
Plan Review Completed(1st rev) | | | 12/16/1999 | | |
|
|
|
BUILDING
|
Plan resubmittals requested | | | 12/15/1999 | | FAIL |
|
|
|
Requested additional information for further review.
|
Print Pending Permit.LaserJet4 | | | 12/15/1999 | | FAIL |
|
|
|
Additional informaiton required to be submitted for further review.
|
Plan resubmittals received | | | 12/9/1999 | | DONE |
|
|
|
RECEIVED ONE COPY OF SHEETSC1.0, A1.1, A5.1, A6.0, A9.0, A9.1, E2.0, AND TWO COPIES OF SHEETS A5.0. ROUTED TO MIKE P. KMM
|
Plan resubmittals received | | | 12/2/1999 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM MARK SANDERS, ARCHITECTRUAL AND MECHANICAL SHEETS AND STRUCTURAL CACULATIONS. 12/2/99 DAR
|
Routing - FIRE | 11/29/1999 | 11/29/1999 | 11/29/1999 | | PASS |
|
|
|
ROUTED TO FIRE FOR GRADING ONLY AT THIS TIME. KMM NEEDED WATER FLOWS. NO BUILDING UNTIL PROVIDED.
|
Routing - PLAN CHECK | 11/24/1999 | | 11/29/1999 | | PEND |
|
|
|
|
Plan resubmittals received | | | 11/26/1999 | | DONE |
|
|
|
received three copies of revised sheet a1.0 routed to marlene . kmm
|
Routing - FIRE | 11/23/1999 | 11/23/1999 | 11/24/1999 | | PEND |
|
|
|
GRADING - Need fire access plot plan for area. Need info on south new structures blocked lane (bollards). Need fire hydrant locations and water flows verified by water purveyor. ALL PROVIDED EXCEPT WATER FLOW.
|
Plan Review Completed(1st rev) | | | 11/24/1999 | | FAIL |
|
|
|
GRADING
|
Routing - PUBLIC WORKS | 10/6/1999 | 10/6/1999 | 11/23/1999 | | DONE |
|
|
|
|
Routing - PLUMBING | 10/15/1999 | 10/15/1999 | 11/23/1999 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/12/1999 | 10/12/1999 | 10/15/1999 | | |
|
|
|
Routing to Plumbing.
|
Plan Reviewer's activity | | | 10/14/1999 | | FAIL |
|
|
|
Plan revisions have not been submitted. Called Mark Sanders to confirm new plans have not been subimitted for review.
|
Plan resubmittals received | | | 10/14/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM TAMURA AND ASSOCIATES, FORWARDED SAME TO MIKE PHILLIPS. 10/14/99 DAR
|
Routing - PLAN CHECK | 9/28/1999 | 9/28/1999 | 10/6/1999 | | DONE |
|
|
|
Routing to P.W.
|
Routing - PUBLIC WORKS | 9/27/1999 | 9/27/1999 | 9/28/1999 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 9/21/1999 | 9/21/1999 | 9/27/1999 | | PEND |
|
|
|
Routing to P.W.
|
Routing - PLUMBING | 9/16/1999 | | 9/21/1999 | | FAIL |
|
|
|
|
Routing - PLANNING | | | 9/16/1999 | | PASS |
|
|
|
Approve per revised landscape plan dated rec. 9/16/99 and per conditions of DRH99-0097
|
Routing - PLAN CHECK | 8/12/1999 | | 9/9/1999 | | PEND |
|
|
|
|
Telephone call | | | 8/12/1999 | | HOLD |
|
|
|
Called and talked to Mark Sanders he will be submitting new plans revising the buildings and lay out.
|
Routing - PLANNING | 7/30/1999 | | 8/5/1999 | | PASS |
|
|
|
Pending Design Review approval.
|
Routing - PUBLIC WORKS | 7/23/1999 | | 7/30/1999 | | FAIL |
|
|
|
Failed with Brian Murphy and Bill Colson.
|
Plan Reviewer's activity | | | 7/21/1999 | | |
|
|
|
Removed from hold application received.
|
Plan Reviewer's activity | | | 7/12/1999 | | HOLD |
|
|
|
WAITING FOR ADDITIONAL APPLICATIONS TO BE SUBMITTED.
|
Plan assigned to (MYS) | 7/8/1999 | | 7/12/1999 | | |
Marlene Southard
|
|
|
|
Application received | | | 7/8/1999 | | |
|
|
|
|