BLD-Final | 1/28/2000 | 1/31/2000 | 1/31/2000 | A | PASS |
Russ Owen
|
|
|
Ron ###-####. approved wall blocked of hallway 1/31/00 1:19:31 PM
|
BLD-Final | 1/27/2000 | 1/27/2000 | 1/27/2000 | P | FAIL |
Russ Owen
|
|
|
Ron Henry ###-#### head height at stairs \hallway safety fides at upper bath 1/28/00 1:40:06 PM
|
CHANGE STATUS TO (I) | | | 1/26/2000 | | DONE |
|
|
|
|
BLD-Final | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | FAIL |
|
|
|
Ron ###-####. Verify terry records has approved hillside requiremets ###-#### prior to final.. t. records still not signed off called and left message on contact answering machine. 1/24/00 8:06:48 AM
|
BLD-Framing/Rough-in | 12/1/1999 | 12/2/1999 | 12/2/1999 | A | PASS |
Wes Worcester
|
|
|
ron --###-#### fr insp
|
BLD-Foundation | 11/29/1999 | 11/30/1999 | 11/30/1999 | A | PART |
Russ Owen
|
|
|
ron ###-#### Notified contractor at site to gain minimum 2" clearance at lower section of wall.
|
BLD-Framing/Rough-in | 11/24/1999 | 11/26/1999 | 11/26/1999 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/24/1999 at 11:12:51. Contact: ###-####. (1) item left for engineering.
|
BLD-Footing | 11/22/1999 | 11/23/1999 | 11/23/1999 | A | PASS |
Russ Owen
|
|
|
Jerry Nicalona ###-#### Footing at retaining wall.
|
BLD-Framing/Rough-in | 11/15/1999 | 11/16/1999 | 11/16/1999 | A | FAIL |
Russ Owen
|
|
|
RON ###-####
|
BLD-Framing/Rough-in | 11/12/1999 | 11/15/1999 | 11/15/1999 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/12/1999 at 15:25:59. Contact: ###-####. Ext. shear required approval by engineer, no framing inspections will be done until resolved.
|
BLD-Framing/Rough-in | 11/12/1999 | 11/12/1999 | 11/12/1999 | P | CANC |
Russ Owen
|
|
|
ron ###-#### reinspect Called and told them to recall.
|
BLD-Framing/Rough-in | 11/9/1999 | 11/10/1999 | 11/10/1999 | P | FAIL |
Wes Worcester
|
|
|
RON-- ###-#### FR INS Do not cover- no shear inspection, sided, BCEC incomplete & garage shear is wrong.
|
INSP - Foundation | 9/10/1999 | 9/13/1999 | 9/13/1999 | P | PASS |
Russ Owen
|
|
|
GARAGE FOUNDATION WALLS
|
INSP - Foundation | 9/7/1999 | 9/9/1999 | 9/10/1999 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/07/1999 at 16:55:16. Contact: ###-####. CANCELLED BY CONTRACTOR
|
INSP - Foundation | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | PASS |
Russ Owen
|
|
|
all foundation complete now, except garage walls
|
INSP - Foundation | 9/9/1999 | 9/9/1999 | 9/9/1999 | | CANC |
Russ Owen
|
|
|
9/9 Needs PM inspection. jrb
|
INSP - Foundation | 9/7/1999 | 9/8/1999 | 9/7/1999 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/07/1999 at 16:52:59. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/07/1999 at 16:54:15.
|
INSP - Foundation | 9/1/1999 | 9/2/1999 | 9/2/1999 | A | PASS |
Russ Owen
|
|
|
09/02/99 407 - steve- ###-#### ft insp
|
INSP - Foundation | 8/31/1999 | 9/1/1999 | 9/1/1999 | A | FAIL |
Russ Owen
|
|
|
09/01/99 407 - left corrections.
|
INSP - Foundation | 8/31/1999 | 9/1/1999 | 9/1/1999 | A | CANC |
Russ Owen
|
|
|
09/01/99 407 - called in 2 times.
|
Inspection Record Card- Bld | | | 8/19/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/19/1999 | | |
|
|
|
|
Plan assigned to (DJO) | 7/12/1999 | | 8/18/1999 | | PASS |
Dan Overy
|
|
|
08/18/99 13:08:03 DJO - this action updated by action script from <<>> in Case No. BLD99-2073
|
Print Pending Permit.LaserJet4 | | | 8/18/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/18/1999 | | PASS |
|
|
|
information on beams/headers, deck, and stepped footing detail received.
|
Plan Reviewer's activity | | | 8/16/1999 | | PEND |
|
|
|
ADDITIONAL INFORMATION REQ.
|
Plans ACCEPTED BY PLAN CHECK | | | 8/16/1999 | | PEND |
|
|
|
|
Routing - PLANNING | 8/5/1999 | | 8/6/1999 | | PASS |
|
|
|
There is a 10 appeal date on this approval. No permits to be realsed until 5:00 p.m. on August 18, 1999.
|
Routing - PUBLIC WORKS | 7/12/1999 | | 8/5/1999 | | PASS |
|
|
|
took to terry records/7/12/99/pe
|
Routing - PUBLIC WORKS GRADING | 8/3/1999 | | 8/3/1999 | | PASS |
Rita DeYoung
|
|
|
Approved as category 1. Comply with conditions of approval for CFH99-0020.
|
Routing - PUBLIC WORKS GRADING | 7/23/1999 | | 7/23/1999 | | PEND |
Rita DeYoung
|
|
|
Received revised, approvable grading plan from Ron Henry on 7/22/99. However, it still requires engineers stamp, which Ron Henry indicated he would bring in on Monday. Took one set of house plans to Dan Overy for review.
|
Routing - PUBLIC WORKS GRADING | 7/19/1999 | | 7/19/1999 | | FAIL |
Rita DeYoung
|
|
|
Need revisions to grading plan. Spoke to engineer and contractor. Also told contractor that this will be a category 1 and will require a hillside development application. He said that he would come in and go over it with me.
|
Application received | | | 7/12/1999 | | |
|
|
|
|
BLD-Grading Inspection | 1/25/2000 | 1/25/2000 | 1/25/1999 | | BOND |
Rita DeYoung
|
|
|
Engineer has recommended $2800.00 bond for incomplete grading and drainage. Grading is conditionally approved upon receipt of $2800.00 surety. CALL CATHY @ ###-#### the bond has been submitted per Terry Records
|
Routing - PLAN CHECK | 8/6/1999 | | | | PEND |
|
|
|
|