Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD99-02086
StatusFinaled
Name THOMPSON SAMUEL & VERDA
Site Address 3009 N OVERLOOK RD
Project NameLEISURE VILLA
Customer Number 
ePlanReviewNo
Description
BUILDING TYPE "B" * TO CONSTRUCT A NEW 3,224 SQ.FT. SINGLE STORY, WOOD FRAMED, TYPE V NONRATED FIVE UNIT APARTMENT BUILDING. THERE ARE THREE TYPE 1 UNITS AT 634 SQ.FT. EACH AND ONE TYPE 2 UNIT AT 657 SQ.FT AND ONE TYPE 3 UNIT AT 665 SQ.FT. ALL WORK PER THE APPROVED PLANS, ATTACHED COMMENT LIST AND THE 1997 EDITION OF THE UBC. ADDITIONAL WORK ON THIS PERMIT INCLUDE SITE UTILITIES, PARKING AREA AND LANDSCAPING. MJP PC # DRH99-0097
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/18/20036/18/20036/18/2003 DONE
Permanent Occupancy 1/29/20011/29/2001 DONE
Details
BLD-Final1/26/20011/29/20011/29/2001APASS
DetailsCarl Dependahl
Permanent occupancy  1/29/2001 DONE
Perm. Occ. Cert. #8549 issued 1-29-01 to the Leisure Villa Apts.
FIRE-Final Inspection11/16/200011/17/200011/17/2000APASS
DetailsJoe Tawney
Scott Asin ###-#### Reinsp OK for permanant occupancy 11/17/2000 11:56:04 AM
Temporary occupancy  10/31/2000 PART
Temp. Occ. Cert. #4072 issued 10-31-00 to the Leisure Villa Apts.
BLD-Final10/27/200010/30/200010/30/2000AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/27/2000 at 13:55:51. Contact: ###-####.
FIRE-Final Inspection10/27/200010/27/200010/27/2000PPART
DetailsJoe Tawney
###-####. Reinsp OK for temporary occupancy. Paint and letter curbs 10/30/2000 8:06:06 AM
BLD-Other10/25/200010/26/200010/26/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/25/2000 at 10:16:55. Contact: ###-####. need all other sigs for finals 10/26/2000 10:29:17 AM
FIRE-Final Inspection10/25/200010/25/200010/25/2000PFAIL
DetailsJoe Tawney
###-####.Final Fail Smoke detectors & signs and striping for FD access 10/26/2000 8:05:49 AM
BLD-Energy code compliance8/4/20008/4/20008/4/2000PPASS
DetailsCarl Dependahl
Mike ###-####; fra 8/4/2000 11:45:24 AM me ok 8/4/2000 11:45:32 AM
BLD-Energy code compliance8/3/20008/3/20008/3/2000PNR
DetailsCarl Dependahl
mike ###-#### energy code
BLD-Framing/Rough-in7/31/20007/31/20007/31/2000PFAIL
DetailsCarl Dependahl
mike ###-#### fr; c/n, draft stops, truss calcs & hip purlin support 7/31/2000 5:08:54 PM
BLD-Energy code compliance7/31/20007/31/20007/31/2000PPART
DetailsCarl Dependahl
mike ###-#### energy code, air-seal ok 7/31/2000 5:09:21 PM
BLD-Framing/Rough-in6/16/20006/16/20006/16/2000PPART
DetailsTom Arcoraci
SHEETROCK ON THE SOFFIT MIKE ###-#### dry wall on soffia 6/19/00 2:02:26 PM
BLD-Framing/Rough-in5/30/20005/31/20005/31/2000PPART
DetailsCarl Dependahl
###-#### sheer wall and straps 1st fl. ext. "shear" walls. 6/1/00 11:25:30 AM
BLD-Foundation5/4/20005/5/20005/5/2000APART
DetailsCarl Dependahl
###-#### Poured, appears ok. 5/8/00 9:38:14 AM
BLD-Footing5/3/20005/3/20005/3/2000PPASS
DetailsTom Arcoraci
###-####
Issue PAID IN FULL permit  4/21/2000 DONE
Routing - PLAN CHECK3/28/2000 4/20/2000  
Plan Reviewer's activity  4/20/2000 DONE
Print Pending Permit.LaserJet4  4/20/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/20/2000 DONE
Case Summary (BLD)  4/20/2000 DONE
Print Pending Permit.LaserJet4  4/20/2000 DONE
Print Occupancy Form  4/20/2000 DONE
Inspection Record Card- Bld  4/20/2000 DONE
Telephone call  4/20/2000 DONE
Plan assigned to (M_P)7/12/1999 4/20/2000 PASS
DetailsMike Phillips
4/20/2000 10:56:41 M_P - activity updated through activity BLDA022 from case BLD99-02086.
Plan resubmittals received  4/19/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS A1.0, A2.0, A2.1, A8.0, A9.1 AND ONE COPY OF CALCS. ROUTED TO MIKE P. KMM
Routing - FIRE3/27/20003/28/20003/28/2000 PASS
DetailsBill Alexander
Provide water supply letter from Capitol Water with 1,500 gpm available.
Routing - FIRE12/15/199912/15/199912/16/1999 FAIL
BUILDING - Need fire flows of 1500 gpm minimum per UFC.
Plan Review Completed(1st rev)  12/16/1999  
BUILDING
Plan resubmittals requested  12/15/1999 FAIL
Additional information requested to be submitted for further review.
Print Pending Permit.LaserJet4  12/15/1999 FAIL
Additional information requested to be submitted for further review.
Plan resubmittals received  12/2/1999 DONE
RECEIVED PLAN RESUBMITTALS FROM MARK SANDERS ARCHITECTURAL, MECHANICAL AND STRUCTURAL CACULATIONS. 12/2/99 DAR
Routing - FIRE11/29/199911/29/199911/29/1999 PASS
FOR GRADING ONLY AT THIS TIME . KMM NO FIRE FLOWS PROVIDED. NO BUILDING UNTILL PROVIDED.
Routing - PLAN CHECK11/24/1999 11/29/1999 PEND
Plan resubmittals received  11/26/1999 DONE
RECEIVED THREE COPIES OF REVISED SHEET A1.0. ROUTED TO MARLENE. KMM
Routing - FIRE11/23/199911/24/199911/24/1999 FAIL
GRADING - Need fire access plot plan for area. Need info on south new structures blocked lane (bollards). Need fire hydrant locations and water flows verified by water purveyor.
Plan Review Completed(1st rev)  11/24/1999 FAIL
GRADING
Routing - PLUMBING10/15/199910/15/199910/18/1999 DONE
Routing - PLAN CHECK10/12/199910/12/199910/15/1999  
Routing to plumbing.
Plan Reviewer's activity  10/14/1999 FAIL
Waiting for resubmittals to be submitted for review called and confirmed with Mark Sanders resubmittals have not been submitted for review.
Plan resubmittals received  10/14/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM TUMURA AND ASSOCIATES, FORWARDED SAME TO MIKE PHILLIPS. 10/14/99 DAR
Routing - PUBLIC WORKS10/6/199910/6/199910/12/1999 PASS
Routing - PLAN CHECK9/28/19999/28/199910/6/1999 DONE
Routing to P.W.
Routing - PUBLIC WORKS9/27/19999/27/19999/28/1999 FAIL
Routing - PLAN CHECK9/21/19999/21/19999/27/1999 DONE
Routomg to P.W.
Routing - PLUMBING9/16/1999 9/21/1999 FAIL
Routing - PLANNING9/9/19999/9/19999/16/1999  
Routing - PLAN CHECK8/12/1999 9/9/1999
Routing - PLANNING8/5/1999 8/12/1999 FAIL
need to submit final plans per DR conds. Contacted architect.
Telephone call  8/12/1999 HOLD
Talked to Mark Sanders he will be subbmitting new plans reflecting building changes.
Routing - PLANNING7/30/1999 8/5/1999 PASS
Pending Design Review Approval.
Routing - PUBLIC WORKS7/23/1999 7/30/1999 FAIL
Failed with Brian Murphy and Bill Colson.
Plan Reviewer's activity  7/21/1999
Removed from hold received application.
Plan Reviewer's activity  7/12/1999 HOLD
WAITING FOR ADDITIONAL APPLICATIONS TO BE SUBMITTED.
Application received  7/12/1999
Routing - PLAN CHECK12/16/1999    
routing to fire