Fee Review-notes | 6/18/2003 | 6/18/2003 | 6/18/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/18/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8508 issued 12-18-00 to the Aspen Apts.
|
BLD-Final | 12/15/2000 | 12/15/2000 | 12/15/2000 | P | PASS |
Tom Arcoraci
|
|
|
DON ###-#### FN OCC ok for perm 12/15/2000 3:54:22 PM
|
Permanent Occupancy | | 12/15/2000 | 12/15/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PASS |
Joe Tawney
|
|
|
don ###-#### Reinsp OK for permanant occupancy 10/27/2000 12:23:40 PM
|
BLD-Final | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | FAIL |
Carl Dependahl
|
|
|
Don ###-#### c/n; air seal,s.c. doors, . ok for t/o. 10/27/2000 4:55:18 PM 10/27/2000 5:01:16 PM
|
Code Occupancy Approval | | | 10/27/2000 | | FAIL |
|
|
|
Bonded for temporary ($7,700.) - striping - landscaping
|
FIRE-Final Inspection | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | FAIL |
Joe Tawney
|
|
|
Don ###-#### Final Fail C/N issued 10/25/2000 12:09:00 PM
|
BLD-Wall cover | 8/31/2000 | 8/31/2000 | 8/31/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 06:22:44. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/29/2000 | 8/30/2000 | 8/30/2000 | A | FAIL |
Carl Dependahl
|
|
|
shear nailing don ###-####; renail panels at 2nd fl. recall 8/30/2000 9:54:10 AM
|
BLD-Framing/Rough-in | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PART |
Carl Dependahl
|
|
|
###-####; gyp ok exc. at s 8/28/2000 4:46:04 PM tair lid 8/28/2000 4:46:15 PM
|
BLD-Wall cover | 8/25/2000 | 8/25/2000 | 8/25/2000 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 07:00:06. Contact: ###-####., int gyp at 1hr
8/25/2000 9:31:47 AM
|
BLD-Wall cover | 8/24/2000 | 8/24/2000 | 8/24/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 07:46:27. Contact: ###-####. INT GYP OK 8/24/2000 4:39:30 PM
|
BLD-Framing/Rough-in | 8/23/2000 | 8/23/2000 | 8/23/2000 | P | PART |
Carl Dependahl
|
|
|
shear wall Don ###-#### int shear ok to cover, c/n for gyp at lids & firewalls 8/23/2000 11:54:06 AM
|
BLD-Framing/Rough-in | 8/22/2000 | 8/22/2000 | 8/22/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 07:08:04. Contact: ###-####. ok to cover, need gyp insp for nailing 8/22/2000 9:44:15 AM
|
BLD-Energy code compliance | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | PART |
Carl Dependahl
|
|
|
Don ###-#### 1st fl only ok to cover 8/18/2000 11:19:57 AM
|
BLD-Framing/Rough-in | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | FAIL |
Carl Dependahl
|
|
|
Don ###-#### keep c/n at 2nd fl. 8/18/2000 11:20:35 AM
|
BLD-Framing/Rough-in | 8/17/2000 | 8/17/2000 | 8/17/2000 | P | NR |
Carl Dependahl
|
|
|
Don ###-####
|
BLD-Energy code compliance | 8/17/2000 | 8/17/2000 | 8/17/2000 | P | NR |
Carl Dependahl
|
|
|
Don ###-####
|
BLD-Framing/Rough-in | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | FAIL |
Carl Dependahl
|
|
|
Don ###-#### reinspection; ok to ins 1st fl only. c/n nailing, fireblox, truss cut, etc. 8/16/2000 2:32:48 PM
|
BLD-Framing/Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### call 1/2 hour before you go; complete fireblox, recall 8/15/2000 4:59:08 PM
|
BLD-Framing/Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | FAIL |
Carl Dependahl
|
|
|
don ###-#### fr; c/n re eng'g changed, e 8/14/2000 11:36:12 AMc 8/14/2000 11:36:18 AM
|
BLD-Framing/Rough-in | 8/7/2000 | 8/7/2000 | 8/7/2000 | P | PART |
Carl Dependahl
|
|
|
shear nailing\\###-####; part, ext nailing ok; add hd's missed & int osb 8/7/2000 3:42:18 PM
|
Inspection Record Card- Bld | | | 8/7/2000 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 8/2/2000 | 8/2/2000 | 8/2/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-####; complete blocking, nailing at horiz edges 8/2/2000 4:38:21 PM
|
BLD-Conference | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | PART |
Carl Dependahl
|
|
|
Greg Anderson ###-####; need clarify 2hr wall and 1hr lid assy, add fireblox, hold downs 7/26/2000 4:26:49 PM fire 7/26/2000 4:27:38 PM complete 1hr enclosure at exits 7/26/2000 4:27:59 PM 7/26/2000 4:28:20 PM
|
BLD-Conference | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | PASS |
Carl Dependahl
|
|
|
w/ arch...w.i.p. no frame insps called.
|
BLD-Foundation | 6/12/2000 | 6/13/2000 | 6/13/2000 | A | PART |
Alan Hauser
|
|
|
clay ###-#### foundation wall
|
BLD-Footing | 6/7/2000 | 6/8/2000 | 6/8/2000 | A | PART |
Alan Hauser
|
|
|
clay ###-####
|
Issue PAID IN FULL permit | | | 6/7/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/17/2000 | | 3/29/2000 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/29/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/29/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/29/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/29/2000 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 7/26/1999 | | 3/29/2000 | | PASS |
Mike Phillips
|
|
|
3/29/2000 11:56:50 M_P - activity updated through activity BLDA022 from case BLD99-02146.
|
Plan resubmittals received | | | 3/28/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEET A10.0 AND ONE COPY OF REVISED CALCS AND ONE COPY OF RESPONSE LETTER. ROUTED TO MIKE P. KMM
|
Routing - PLANNING | 3/10/2000 | | 3/17/2000 | | PASS |
|
|
|
Approved as per revised site plan and parking submitted 3/16/00. Re CU99-00142
|
Routing - PLAN CHECK | 3/6/2000 | | 3/10/2000 | | |
|
|
|
Routing to P & Z for parking modification.
|
Routing - PLUMBING | 3/3/2000 | | 3/6/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 3/2/2000 | | 3/3/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/29/1999 | 12/29/1999 | 3/3/2000 | | |
|
|
|
routing to plumbing
|
Routing - PLAN CHECK | 3/3/2000 | | 3/3/2000 | | PEND |
|
|
|
|
Plan resubmittals received | | | 3/2/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM TAMURA AND ASSOCIATES, TWO SETS OF A1.0,P1.0,AND SHEET P2.0, FORWARDED SAME TO MIKE PHILLIPS. 3/2/00 DAR
|
Plan resubmittals received | | | 2/29/2000 | | DONE |
|
|
|
resubmittals received from tamura
|
Plan resubmittals received | | | 2/29/2000 | | |
|
|
|
|
Plan resubmittals received | | | 2/29/2000 | | |
|
|
|
|
Routing - FIRE | 12/20/1999 | 12/28/1999 | 12/28/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 12/28/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 10/1/1999 | 10/1/1999 | 12/20/1999 | | FAIL |
|
|
|
ROUTING TO FIRE FOR REVIEW.
|
Plan resubmittals requested | | | 12/18/1999 | | FAIL |
|
|
|
ADDITIONAL INFORMATION REQUESTED FOR FURTHER REVIEW.
|
Print Pending Permit.LaserJet4 | | | 12/18/1999 | | |
|
|
|
ROUTING TO FIRE FOR REVIEW.
|
Plan resubmittals received | | | 12/13/1999 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS ALL ARCHITECTURAL SHEETS, FROM TAMURA AND ASSOCIATES,TODD BALDWIN. FORWARDED SAME TO MIKE PHILLIPS. 12/13/99 DAR
|
Plan resubmittals requested | | | 10/25/1999 | | FAIL |
|
|
|
Called and requested additional structural plans to be submitted prior to completing of my review.
|
Routing - PUBLIC WORKS | 9/28/1999 | 9/28/1999 | 10/1/1999 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. KMM
|
Application received | | | 9/28/1999 | | PEND |
|
|
|
RECEIVED PLAN CHECK RESUBMITTALS FROM MARK SANDERS, FORWARDED SAME TO MIKE PHILLIPS. 9/28/99 DAR
|
Plan resubmittals received | | | 9/10/1999 | | PEND |
Mike Phillips
|
|
|
RECEIVED PLAN RESUBMITTALS FROM MARK SANDERS OF TAMURA AND ASSOCIATES, FORWARDED SAME TO MIKE PHILLIPS. 9/10/99 DAR
|
Routing - PLAN CHECK | 8/12/1999 | | 8/20/1999 | | HOLD |
|
|
|
Waiting for new plans.
|
Plan resubmittals requested | | | 8/20/1999 | | FAIL |
|
|
|
Sent submittal letter asking for corrected item prior to a complet review.
|
Routing - PLANNING | 8/5/1999 | | 8/10/1999 | | PASS |
|
|
|
Pass P&Z with notes to provide 2 handicaped parking, 3 bicycle spaces and construction must meet 1993 Boise City Energy Code
|
Routing - PLUMBING | 7/28/1999 | | 8/5/1999 | | FAIL |
|
|
|
provide a plumbing and site utilities plan. 8/5/99 323
|
Routing - PLAN CHECK | 8/5/1999 | | 8/5/1999 | | |
|
|
|
Routing to plannng.
|
Routing - PUBLIC WORKS | 7/23/1999 | | 7/28/1999 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLANPER BRIAN MURPHY. 7/28/99 DAR
|
Plan Reviewer's activity | | | 7/21/1999 | | |
|
|
|
APPLICATIONS RECEIVED STARTING TO PROCESS AND REVIEW PROJECT.
|
Telephone Call | | | 7/20/1999 | | |
|
|
|
Called Tamura and left message on the 15th for them to come down and bring us 2 seperate applications and also different sets of plans...
|
Application received | | | 7/15/1999 | | |
|
|
|
|