Fee Review-notes | 6/18/2003 | 6/18/2003 | 6/18/2003 | | DONE |
|
|
|
|
Fee Review-notes | 7/16/1999 | | 10/9/2000 | | DONE |
|
|
|
call susan dillingham
|
Permanent Occupancy | | 8/22/2000 | 8/22/2000 | | DONE |
|
|
|
|
BLD-Final | 8/22/2000 | 8/22/2000 | 8/22/2000 | P | PASS |
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 10:18:09. Contact: ###-####. signed the perm col of the occ req caed 8/23/00 8:29:53 AM
|
Permanent occupancy | | | 8/22/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8339 issued 8-22-00 to Albertson's.
|
FIRE-Conference | 8/16/2000 | 8/18/2000 | 8/18/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 10:45:46. Contact: ###-####.
|
FIRE-Conference | 8/14/2000 | 8/15/2000 | 8/15/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 09:46:22. Contact: ###-####. alarms not ready 8/15/2000 4:49:59 PM
|
FIRE-Conference | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 13:24:44. Contact: ###-####.; final inspection c/n issued
|
BLD-Final | 7/12/2000 | 7/13/2000 | 7/13/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 13:25:39. Contact: ###-####. need fire signoff 7/13/2000 2:06:41 PM
|
FIRE-Conference | 5/24/2000 | 5/24/2000 | 5/24/2000 | A | PART |
Rick Jackson
|
|
|
Ok to use Deli Type 1 hood. Suppression system tested ok. 5/24/00 3:03:59 PM
|
BLD-Framing/Rough-in | 5/23/2000 | 5/23/2000 | 5/23/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 11:08:41. Contact: ###-####. shaft ok with 409 approvals 5/24/00 8:01:34 AM
|
FIRE-Conference | 5/23/2000 | 5/23/2000 | 5/23/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 11:09:33. Contact: ###-####. Electrical work not operating properly 5/24/00 3:02:20 PM
|
BLD-Other | 5/22/2000 | 5/22/2000 | 5/22/2000 | A | FAIL |
|
|
|
Scheduled by Inspector: 338 On 5/22/00 class 1 hood at the deli not ready for insp other ag not approved 5/22/00 3:42:57 PM
|
FIRE-Conference | 5/22/2000 | 5/22/2000 | 5/22/2000 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/22/2000 at 10:12:09. Contact: ###-####. Contractor called to say he wasn't ready for the type I kitchen hood system 5/23/00 2:33:08 PM
|
BLD-Framing/Rough-in | 5/22/2000 | 5/22/2000 | 5/22/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/22/2000 at 10:12:57. Contact: ###-####. madeok with 409 ok 5/24/00 10:32:31 AM
|
BLD-Framing/Rough-in | 5/1/2000 | 5/2/2000 | 5/2/2000 | A | PART |
|
|
|
###-#### walk through the project working on the bakery and the deli area also new cart storage, ned perimeter wiring on the ceiling grid this area 5/4/00 5:25:37 PM
|
BLD-Framing/Rough-in | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 14:51:26. Contact: ###-####. made ok to stare efis system on the ext front colms and the soffits all to be outside of concealed spaces 03/22/2000 2:01:40 PM
|
BLD-Framing/Rough-in | 2/3/2000 | 2/4/2000 | 2/4/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 15:37:28. Contact: ###-####. ok to cover with other agencies approvals 2/10/00 10:16:44 AM
|
BLD-Other | 1/21/2000 | 1/24/2000 | 1/24/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello!
. ok to start droping in ceiling tiles 1/25/00 7:56:54 AM
|
BLD-Framing/Rough-in | 1/18/2000 | 1/19/2000 | 1/19/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 15:50:24. Contact: ###-####. made ok to cover this portion of the meat section soffits 1/20/00 11:51:26 AM
|
BLD-Framing/Rough-in | 1/6/2000 | 1/7/2000 | 1/7/2000 | P | FAIL |
|
|
|
NOT READYFOR INSP
|
BLD-Framing/Rough-in | 1/3/2000 | 1/4/2000 | 1/4/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 15:06:43. Contact: ###-####.made ok in progress
|
BLD-Other | 12/13/1999 | 12/15/1999 | 12/15/1999 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 12/13/1999 at 13:34:19. Contact: ###-####. Ok to occupy laundry room and lower shower room.
|
FIRE-Sprinkler Rough-in | 12/13/1999 | 12/14/1999 | 12/14/1999 | A | PART |
Rick Jackson
|
|
|
ann ###-#### r/i fire spr Okay to cover new pharmacy only. Requested sprinkler and alarm plans.
|
BLD-Framing/Rough-in | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 11:02:43. Contact: ###-####. Ok to cover with Elec. Ok.
|
BLD-Framing/Rough-in | 11/22/1999 | 11/23/1999 | 11/23/1999 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 11:47:44. Contact: ###-####. Made ok with Electrical & Plumbing approval.
|
BLD-Other | 11/16/1999 | 11/17/1999 | 11/17/1999 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 11/16/1999 at 12:09:03. Contact: ###-####. Walk through protect w/super.
|
BLD-Framing/Rough-in | 11/12/1999 | 11/12/1999 | 11/12/1999 | P | PART |
|
|
|
fr insp gill ###-#### Ok to cover w/elec. Approval.
|
BLD-Conference | 10/28/1999 | 11/1/1999 | 11/4/1999 | P | PASS |
|
|
|
JIM ###-#### Made ok
|
FIRE-Conference | 10/28/1999 | 11/1/1999 | 11/1/1999 | P | PART |
Rick Jackson
|
|
|
JIM ###-#### Discussed temporary exiting; sprinklers plans submittals; project phasing.
|
Issue PAID IN FULL permit | | | 10/27/1999 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/14/1999 | | PASS |
Ron Hill
|
|
|
Received plans from plumbing, ready to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/1999 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 9/14/1999 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/14/1999 | | DONE |
|
|
|
|
Telephone call | | | 9/14/1999 | | DONE |
|
|
|
called permit ready Bruce Petersen at ###-####
|
Plan assigned to (R_H) | 7/19/1999 | | 9/14/1999 | | PASS |
|
|
|
9/14/1999 08:17:33 RMH - activity updated through activity BLDA022 from case BLD99-02158.
|
Routing - PLAN CHECK | 9/13/1999 | 9/13/1999 | 9/13/1999 | | PASS |
|
|
|
|
Routing - PLUMBING | 9/9/1999 | 9/9/1999 | 9/13/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/9/1999 | | PASS |
|
|
|
route to plumbing for approval and sign off.
|
Plan resubmittals received | | | 9/8/1999 | | |
|
|
|
RECEIVED ONE COPY OF RESPONSE LETTER, ONE COPY OF LETTER TO CHAD POLLOCK FROM SHAWN REEDER, ONE COPY OF LETTER FROM MCCLURE ENG. INC.AND TWO COPIES OF REVISED DRAWINGS 2.0B, 2.2A, 2.3, 3.0A, 3.0B, 4.0A, 4.1A ROUTED TO RON HILL. KMM
|
Routing - FIRE | 8/20/1999 | | 8/23/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 8/23/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/3/1999 | | 8/20/1999 | | PEND |
|
|
|
Issuance pending response from architect on structural review, notes #2 & #3 on plan check report and fire department approval and plumbing approval.
|
Plan Reviewer's activity | | | 8/20/1999 | | PEND |
|
|
|
A RESPONCE BY ADDENDUM OR CHANGE PLANS IS required, will route to fire department. Pending response from architect from structural review and items #2 and #3 on plan check report. FAXED AND MAILED REQUIREMENTS.
|
Plan Reviewer's activity | | | 8/18/1999 | | PEND |
|
|
|
Sent out structural plan review report to Bruce Petersen.
|
Routing - PLANNING | 7/30/1999 | | 8/3/1999 | | PEND |
|
|
|
Needs both CU and DR approvals (Susan Riggs & Marty Santoyo).
|
Routing - PLANNING | 8/3/1999 | | 8/3/1999 | | PASS |
|
|
|
approved per DRH99-0124.
|
Routing Off Site - STRUCTURAL | 7/19/1999 | | 7/30/1999 | | PASS |
|
|
|
reviewed and passed with comments from CH2MHill.
|
Routing - PLUMBING | 7/26/1999 | | 7/30/1999 | | FAIL |
|
|
|
appendix a-premis backflow preventor and cold water main to restrooms at col. b-5 are undersized. provide 2 1/2" backflow preventor , 2 1/2" to tee at col. h.5-6.5, 2" to restrooms at col. b-5, or provide fixture unit loading to justify design. provide c.o. for waste line to p-43 every 50'. floor sinks to be kept out from under cabinets. additional cross connection protection may be required, verify with field inspector. please address items # 1 and 2 and resubmit.
|
Routing - PUBLIC WORKS | 7/19/1999 | | 7/23/1999 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/19/1999 | | PEND |
|
|
|
|
Plan assigned to (MYS) | 7/16/1999 | | 7/19/1999 | | |
Marlene Southard
|
|
|
|
Telephone call | | | 7/19/1999 | | |
|
|
|
CONTACTED BRUCE PETERSON REQUESTING EXTRA SET OF STRUCTURAL PLANS FOR OUTSIDE ENG. (PLANS ONLY ALREADY HAVE CALCS.) PER MARLENE. KMM
|
Plan routing begun/TENANTS | | | 7/19/1999 | | |
|
|
|
Route OFF SITE TO STRUCTURAL, and to PUBLIC WORKS, PLANNING, PLUMBING, PLAN CHECK and FIRE. Plans previously approved by Carol Johnson at CDH on 7/16/99.
|
Application received | | | 7/16/1999 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/16/1999 | | |
|
|
|
|