Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02158
StatusFinaled
Name ALBERTSON'S STORE #101
Site Address 1650 W STATE ST
Project NameALBERTSONS
Customer Number 
ePlanReviewNo
Description
To remodel the existing grocery store and add 526 sq.ft. of area per approved plans on file. The total area including addition will be 46,612 sq.ft. Work to include, An addition of 526 sq ft pharmacy area, new canopy at front of store, new entrance doors at front of store, and a complete remodel of the total interior of the sales area, remodel of deli area including the installation of a type I hood and grease duct, Deli area is considered accessory use area to the retail sales area, new coolers, and remodel of the main restrooms to make fully accessible. Miscelaneous interior finishes on the main level and second story breakroom and restrooms areas, Separate permits required for Electrical Plumbing and Mechnical. NOTE: This building is fully fire sprinklered for area increase. Any modifications or alterations to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. (P.C.#549-99) DRH99-0124/CUP99-0073 *RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/18/20036/18/20036/18/2003 DONE
Fee Review-notes7/16/1999 10/9/2000 DONE
call susan dillingham
Permanent Occupancy 8/22/20008/22/2000 DONE
Details
BLD-Final8/22/20008/22/20008/22/2000PPASS
Details
Scheduled by a contractor via Hello! on 08/22/2000 at 10:18:09. Contact: ###-####. signed the perm col of the occ req caed 8/23/00 8:29:53 AM
Permanent occupancy  8/22/2000 DONE
Perm. Occ. Cert. #8339 issued 8-22-00 to Albertson's.
FIRE-Conference8/16/20008/18/20008/18/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/16/2000 at 10:45:46. Contact: ###-####.
FIRE-Conference8/14/20008/15/20008/15/2000PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/14/2000 at 09:46:22. Contact: ###-####. alarms not ready 8/15/2000 4:49:59 PM
FIRE-Conference7/12/20007/13/20007/13/2000AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/12/2000 at 13:24:44. Contact: ###-####.; final inspection c/n issued
BLD-Final7/12/20007/13/20007/13/2000PFAIL
Details
Scheduled by a contractor via Hello! on 07/12/2000 at 13:25:39. Contact: ###-####. need fire signoff 7/13/2000 2:06:41 PM
FIRE-Conference5/24/20005/24/20005/24/2000APART
DetailsRick Jackson
Ok to use Deli Type 1 hood. Suppression system tested ok. 5/24/00 3:03:59 PM
BLD-Framing/Rough-in5/23/20005/23/20005/23/2000PPART
Details
Scheduled by a contractor via Hello! on 05/23/2000 at 11:08:41. Contact: ###-####. shaft ok with 409 approvals 5/24/00 8:01:34 AM
FIRE-Conference5/23/20005/23/20005/23/2000PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/23/2000 at 11:09:33. Contact: ###-####. Electrical work not operating properly 5/24/00 3:02:20 PM
BLD-Other5/22/20005/22/20005/22/2000AFAIL
Details
Scheduled by Inspector: 338 On 5/22/00 class 1 hood at the deli not ready for insp other ag not approved 5/22/00 3:42:57 PM
FIRE-Conference5/22/20005/22/20005/22/2000PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/22/2000 at 10:12:09. Contact: ###-####. Contractor called to say he wasn't ready for the type I kitchen hood system 5/23/00 2:33:08 PM
BLD-Framing/Rough-in5/22/20005/22/20005/22/2000PPART
Details
Scheduled by a contractor via Hello! on 05/22/2000 at 10:12:57. Contact: ###-####. madeok with 409 ok 5/24/00 10:32:31 AM
BLD-Framing/Rough-in5/1/20005/2/20005/2/2000APART
Details
###-#### walk through the project working on the bakery and the deli area also new cart storage, ned perimeter wiring on the ceiling grid this area 5/4/00 5:25:37 PM
BLD-Framing/Rough-in3/21/20003/22/20003/22/2000APART
Details
Scheduled by a contractor via Hello! on 03/21/2000 at 14:51:26. Contact: ###-####. made ok to stare efis system on the ext front colms and the soffits all to be outside of concealed spaces 03/22/2000 2:01:40 PM
BLD-Framing/Rough-in2/3/20002/4/20002/4/2000APART
Details
Scheduled by a contractor via Hello! on 02/03/2000 at 15:37:28. Contact: ###-####. ok to cover with other agencies approvals 2/10/00 10:16:44 AM
BLD-Other1/21/20001/24/20001/24/2000APART
Details
Scheduled by a contractor via Hello!
. ok to start droping in ceiling tiles 1/25/00 7:56:54 AM
BLD-Framing/Rough-in1/18/20001/19/20001/19/2000APART
Details
Scheduled by a contractor via Hello! on 01/18/2000 at 15:50:24. Contact: ###-####. made ok to cover this portion of the meat section soffits 1/20/00 11:51:26 AM
BLD-Framing/Rough-in1/6/20001/7/20001/7/2000PFAIL
Details
NOT READYFOR INSP
BLD-Framing/Rough-in1/3/20001/4/20001/4/2000APART
Details
Scheduled by a contractor via Hello! on 01/03/2000 at 15:06:43. Contact: ###-####.made ok in progress
BLD-Other12/13/199912/15/199912/15/1999APART
Details
Scheduled by a contractor via Hello! on 12/13/1999 at 13:34:19. Contact: ###-####. Ok to occupy laundry room and lower shower room.
FIRE-Sprinkler Rough-in12/13/199912/14/199912/14/1999APART
DetailsRick Jackson
ann ###-#### r/i fire spr Okay to cover new pharmacy only. Requested sprinkler and alarm plans.
BLD-Framing/Rough-in12/2/199912/3/199912/3/1999APART
Details
Scheduled by a contractor via Hello! on 12/02/1999 at 11:02:43. Contact: ###-####. Ok to cover with Elec. Ok.
BLD-Framing/Rough-in11/22/199911/23/199911/23/1999APART
Details
Scheduled by a contractor via Hello! on 11/22/1999 at 11:47:44. Contact: ###-####. Made ok with Electrical & Plumbing approval.
BLD-Other11/16/199911/17/199911/17/1999APASS
Details
Scheduled by a contractor via Hello! on 11/16/1999 at 12:09:03. Contact: ###-####. Walk through protect w/super.
BLD-Framing/Rough-in11/12/199911/12/199911/12/1999PPART
Details
fr insp gill ###-#### Ok to cover w/elec. Approval.
BLD-Conference10/28/199911/1/199911/4/1999PPASS
Details
JIM ###-#### Made ok
FIRE-Conference10/28/199911/1/199911/1/1999PPART
DetailsRick Jackson
JIM ###-#### Discussed temporary exiting; sprinklers plans submittals; project phasing.
Issue PAID IN FULL permit  10/27/1999 DONE
Plan Reviewer's activity  9/14/1999 PASS
DetailsRon Hill
Received plans from plumbing, ready to issue.
PLANS/APPL TAKEN TO FRONT DESK  9/14/1999 PASS
Details
Inspection Record Card- Bld  9/14/1999 DONE
Print Occupancy Form  9/14/1999 DONE
Telephone call  9/14/1999 DONE
called permit ready Bruce Petersen at ###-####
Plan assigned to (R_H)7/19/1999 9/14/1999 PASS
Details
9/14/1999 08:17:33 RMH - activity updated through activity BLDA022 from case BLD99-02158.
Routing - PLAN CHECK9/13/19999/13/19999/13/1999 PASS
Routing - PLUMBING9/9/19999/9/19999/13/1999 PASS
Plan Reviewer's activity  9/9/1999 PASS
route to plumbing for approval and sign off.
Plan resubmittals received  9/8/1999  
RECEIVED ONE COPY OF RESPONSE LETTER, ONE COPY OF LETTER TO CHAD POLLOCK FROM SHAWN REEDER, ONE COPY OF LETTER FROM MCCLURE ENG. INC.AND TWO COPIES OF REVISED DRAWINGS 2.0B, 2.2A, 2.3, 3.0A, 3.0B, 4.0A, 4.1A ROUTED TO RON HILL. KMM
Routing - FIRE8/20/1999 8/23/1999 PASS
Plan Review Completed(1st rev)  8/23/1999 PASS
Routing - PLAN CHECK8/3/1999 8/20/1999 PEND
Issuance pending response from architect on structural review, notes #2 & #3 on plan check report and fire department approval and plumbing approval.
Plan Reviewer's activity  8/20/1999 PEND
A RESPONCE BY ADDENDUM OR CHANGE PLANS IS required, will route to fire department. Pending response from architect from structural review and items #2 and #3 on plan check report. FAXED AND MAILED REQUIREMENTS.
Plan Reviewer's activity  8/18/1999 PEND
Sent out structural plan review report to Bruce Petersen.
Routing - PLANNING7/30/1999 8/3/1999 PEND
Needs both CU and DR approvals (Susan Riggs & Marty Santoyo).
Routing - PLANNING8/3/1999 8/3/1999 PASS
approved per DRH99-0124.
Routing Off Site - STRUCTURAL7/19/1999 7/30/1999 PASS
reviewed and passed with comments from CH2MHill.
Routing - PLUMBING7/26/1999 7/30/1999 FAIL
appendix a-premis backflow preventor and cold water main to restrooms at col. b-5 are undersized. provide 2 1/2" backflow preventor , 2 1/2" to tee at col. h.5-6.5, 2" to restrooms at col. b-5, or provide fixture unit loading to justify design. provide c.o. for waste line to p-43 every 50'. floor sinks to be kept out from under cabinets. additional cross connection protection may be required, verify with field inspector. please address items # 1 and 2 and resubmit.
Routing - PUBLIC WORKS7/19/1999 7/23/1999 PASS
Plans ACCEPTED BY PLAN TECH  7/19/1999 PEND
Plan assigned to (MYS)7/16/1999 7/19/1999
DetailsMarlene Southard
Telephone call  7/19/1999
CONTACTED BRUCE PETERSON REQUESTING EXTRA SET OF STRUCTURAL PLANS FOR OUTSIDE ENG. (PLANS ONLY ALREADY HAVE CALCS.) PER MARLENE. KMM
Plan routing begun/TENANTS  7/19/1999
Route OFF SITE TO STRUCTURAL, and to PUBLIC WORKS, PLANNING, PLUMBING, PLAN CHECK and FIRE. Plans previously approved by Carol Johnson at CDH on 7/16/99.
Application received  7/16/1999
Recd Pcfee & Taken To Pln CK  7/16/1999