Case Summary (BLD) | | | 11/26/2012 | | DONE |
|
|
|
|
Fee Review-notes | 6/18/2003 | 6/18/2003 | 6/18/2003 | | DONE |
|
|
|
|
Fee Review-notes | 7/16/1999 | | 7/21/2000 | | DONE |
|
|
|
|
Permanent Occupancy | | 7/18/2000 | 7/18/2000 | | DONE |
|
|
|
|
Permanent Occupancy | | 7/18/2000 | 7/18/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/17/2000 | 7/18/2000 | 7/18/2000 | A | PASS |
Rick Jackson
|
|
|
Ron ###-####
|
FIRE-Final Inspection | 7/17/2000 | 7/18/2000 | 7/18/2000 | A | PASS |
Rick Jackson
|
|
|
Ron ###-####
|
Permanent occupancy | | | 7/18/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8294 issued 7-18-00 to Albertson's Records Bldg.
|
BLD-Final | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | PART |
|
|
|
###-#### str ok ok for 409 tosign for me when his c/n' are taked care of 7/7/00 11:11:53 AM
|
FIRE-Final Inspection | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | PART |
Rick Jackson
|
|
|
###-#### Need supervised alarm valves on sprinkler system 7/10/00 10:23:37 AM
|
BLD-Final | 6/27/2000 | 6/29/2000 | 6/28/2000 | A | PASS |
Jim Storey
|
|
|
ron ###-#### fire safety is also going out am
|
FIRE-Final Inspection | 6/27/2000 | 6/29/2000 | 6/28/2000 | A | CANC |
Rick Jackson
|
|
|
ron ###-####
|
FIRE-Sprinkler Rough-in | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | CANC |
Rick Jackson
|
|
|
door fan test ###-#### 10:00 if possible-----per dave miller does not need insp-cancel
|
BLD-Framing/Rough-in | 6/22/2000 | 6/22/2000 | 6/22/2000 | P | PASS |
Jim Storey
|
|
|
grid ceiling Ron ###-####
|
BLD-Framing/Rough-in | 6/5/2000 | 6/5/2000 | 6/5/2000 | P | PART |
Jim Storey
|
|
|
###-#### tunnel coridor wall configuation at north 2 nd floor exit. 6/6/00 8:38:15 AM
|
BLD-Framing/Rough-in | 6/1/2000 | 6/2/2000 | 6/2/2000 | A | FAIL |
Jim Storey
|
|
|
Ron ###-####
|
BLD-Foundation | 5/26/2000 | 5/30/2000 | 5/30/2000 | A | PART |
Jim Storey
|
|
|
Ron ###-#### pending special insp reinsp corection of weld studs. 5/30/00 1:38:13 PM
|
BLD-Foundation | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Concrete | 5/8/2000 | 5/9/2000 | 5/9/2000 | A | PART |
Jim Storey
|
|
|
Ron ###-#### pending report for 4 ft to 8 ft lift on cmu. 5/9/00 8:40:50 AM
|
BLD-Footing | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | PART |
Jim Storey
|
|
|
###-#### pending report / wall partion framing ok 5/4/00 11:43:31 AM
|
BLD-Final | 4/19/2000 | 4/20/2000 | 4/20/2000 | A | PART |
Jim Storey
|
|
|
###-#### temp occ ok letter on site for south end of bldg. on site to verrify that all inspectors ok with area. 4/20/00 3:13:18 PM
|
FIRE-Final Inspection | 4/18/2000 | 4/19/2000 | 4/19/2000 | A | PART |
Rick Jackson
|
|
|
###-#### Phase I okay 4/20/00 8:20:56 AM
|
BLD-Final | 4/18/2000 | 4/19/2000 | 4/19/2000 | A | PART |
Jim Storey
|
|
|
###-#### ###-####temp ok for south end of the project. 4/19/00
|
FIRE-Final Inspection | 4/13/2000 | 4/14/2000 | 4/14/2000 | A | FAIL |
Rick Jackson
|
|
|
###-#### Exit hardware; extinguishers. 4/17/00 1:49:16 PM
|
BLD-Framing/Rough-in | 3/17/2000 | 3/20/2000 | 3/20/2000 | A | PART |
Jim Storey
|
|
|
RON ###-#### FR
|
BLD-Framing/Rough-in | 3/14/2000 | 3/14/2000 | 3/14/2000 | P | PASS |
Jim Storey
|
|
|
ron ###-#### Resubmittal approved & delivered to site. Frame of meanwhile on resubmittal ok. 3/16/00 11:30:27 AM
|
Routing - PLUMBING | 3/10/2000 | | 3/13/2000 | | PEND |
|
|
|
PLAN RESUBMITTALS
|
Plan resubmittals received | | | 3/10/2000 | | PEND |
|
|
|
|
BLD-Framing/Rough-in | 2/18/2000 | 2/22/2000 | 2/22/2000 | A | PART |
Jim Storey
|
|
|
###-#### Framing ok have engineer address holes in sheer N/E corner of bld. 2/28/00 2:02:42 PM
|
BLD-Concrete | 2/14/2000 | 2/15/2000 | 2/15/2000 | A | PART |
Jim Storey
|
|
|
###-#### Massonary wall 8 ft elv. bar ok pending special insp. report. 2/15/00 10:46:48 AM
|
BLD-Concrete | 2/11/2000 | 2/14/2000 | 2/14/2000 | P | PART |
Russ Owen
|
|
|
###-####--ron concrete bar Requires special inspection, unable to go by. 2/15/00 1:29:32 PM
|
BLD-Footing | 1/27/2000 | 1/27/2000 | 1/27/2000 | A | CANC |
Jim Storey
|
|
|
Ron ###-####
|
BLD-Foundation | 1/24/2000 | 1/24/2000 | 1/24/2000 | P | PART |
Russ Owen
|
|
|
ron-- ###-#### found pendingsp insp approvals ind footings 1/25/00 7:29:16 AM
|
Routing Off Site - STRUCTURAL | 1/21/2000 | | 1/24/2000 | | |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
RECEIVED STRUCTURAL REVIEW LETTER BY CH2MHILL DATED 1/23/00 FOR ALBERTSON'S RECORDS BLDG RESUB NO. 2. ROUTED TO CARL W. KMM
|
Plan resubmittals received | | | 1/21/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROMHOSFORD, LARSON, RUDEEN, REVISED STRUCTURAL DRAWINGS, FORWARDED SAME TO CARL WESTFALL. 1/21/00 DAR
|
BLD-Footing | 1/18/2000 | 1/19/2000 | 1/19/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 12:44:02. Contact: . Rebar ok pend special insp. report. 1/20/00 9:15:06 AM
|
Plan resubmittals received | | | 1/13/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM KIRK MORRISON, HARSFORD , RUDEEN , LARSON, FORWARDED SAME TO JIM STOREY. 1/13/00 DAR
|
BLD-Footing | 1/11/2000 | 1/12/2000 | 1/12/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/11/2000 at 11:45:59. Contact: ###-####. Interior pad ft ok pending special insp report.
|
Routing Off Site - A.C.H.D | 1/10/2000 | 1/10/2000 | 1/10/2000 | | DONE |
|
|
|
No impact fees due for this project per letter from the ACHD John Bianchi
|
Issue PAID IN FULL permit | | | 1/10/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/23/1999 | | DONE |
|
|
|
|
Telephone call | | | 9/23/1999 | | DONE |
|
|
|
called permit ready need ACHD
|
Routing - PLAN CHECK | 9/8/1999 | | 9/22/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/22/1999 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/1999 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/22/1999 | | 9/22/1999 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 8/20/1999 | | 9/22/1999 | | PASS |
Carl Westfall
|
|
|
9/22/1999 11:59:55 CJW - activity updated through activity BLDA022 from case BLD99-02161.
|
Routing - PLUMBING | 8/27/1999 | | 9/8/1999 | | PASS |
|
|
|
cant overload existing system
|
Plan resubmittals received | | | 8/31/1999 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED DRAWINGS, SHEETS A2.01, A5.00, A6.00, A6.01, A6.04, TWO COPIES OF SUPPLEMENTAL STRUCT. CALCULATIONS AND ONE RESPONSE LETTER. ROUTED TO CARL WESTFALL. KMM
|
Plan Review Completed(1st rev) | | | 8/27/1999 | | |
|
|
|
|
Routing - FIRE | 8/26/1999 | | 8/27/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/26/1999 | | 8/26/1999 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/23/1999 | | |
|
|
|
UBC plan review started August 23, 1999 and finished August 26, 1999. A response from the architect is required. See the conditions list.
|
Plan assigned to (R_H) | 7/22/1999 | | 8/20/1999 | | |
|
|
|
8/20/99 Reassigned to Carl Westfall by M. Southard.
|
Routing - PUBLIC WORKS | 7/23/1999 | | 7/26/1999 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 7/16/1999 | | 7/22/1999 | | |
Marlene Southard
|
|
|
|
Plan resubmittals received | | | 7/22/1999 | | |
|
|
|
RECEIVED SUBMITTAL FOR OUTSIDE ENG. SHEETS S1.1 THRU S3.2 ROUTED TO VIA PDQ TO OUTSIDE ENG. KMM
|
Routing - PLANNING | 7/22/1999 | | 7/22/1999 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 7/22/1999 | | |
|
|
|
Route to PLANNING, PUBLIC WORKS, PLAN CHECK and FIRE. Route off site to the Structural Engineer for review.
|
Plan Reviewer's activity | | | 7/22/1999 | | |
|
|
|
Sent FAX memo to David Rudeen to let him know we needed an additional set of structural drawings for the outside engineer, and to inform him that a separate permit would be required for the storage racks. See memo attached to plans.
|
Plans ACCEPTED BY PLAN TECH | | | 7/19/1999 | | PEND |
|
|
|
|
Application received | | | 7/16/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS ADDRESSED TO JIM STORY, ADVISED HIM OF SAME AND HE SAID TO LOG THEM IN AND SEND THEM TO PLUMBING. 3/10/00 DAR
|
Recd Pcfee & Taken To Pln CK | | | 7/16/1999 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/22/1999 | | | | |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
9-16-99 RECEIVED STRUCTURAL REVIEW LETTER FROM CH2MHILL ROUTED TO CARL W. KMM
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|