Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02161
StatusFinaled
Name ALBERTSON'S (RECORDS BLDG)
Site Address 3103 S DENVER WAY
Project NameVANAUKER WAREHOUSE
Customer Number 
ePlanReviewNo
Description
(ALBERTSON'S RECORDS BLDG) This building is fire sprinklered for unlimited area. To remodel and expand an existing warehouse/office tenant space for a new tenant. A 10,400 square foot expansion to the 2nd floor is being constructed. The completed tenant space will have 72,050 square feet on the first floor and 17,200 square foot on the 2nd floor. Work includes an exterior ramp accessible to the disabled, two restrooms accessible to the disabled, an elevator (including a 4 foot deep elevator pit), a stairway rated as a 1-hr fire-resistive corridor, interior nonbearing walls, interior shear walls, a masonry/concrete storage vault, and suspended ceilings all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1996 as regulated by the Fire Department. NOTE: A SEPARATE PERMIT IS REQUIRED FOR INSTALLATION OF STORAGE RACKS. PC-551-99 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/26/2012 DONE
Fee Review-notes6/18/20036/18/20036/18/2003 DONE
Fee Review-notes7/16/1999 7/21/2000 DONE
Permanent Occupancy 7/18/20007/18/2000 DONE
Details
Permanent Occupancy 7/18/20007/18/2000 DONE
Details
FIRE-Final Inspection7/17/20007/18/20007/18/2000APASS
DetailsRick Jackson
Ron ###-####
FIRE-Final Inspection7/17/20007/18/20007/18/2000APASS
DetailsRick Jackson
Ron ###-####
Permanent occupancy  7/18/2000 DONE
Perm. Occ. Cert. #8294 issued 7-18-00 to Albertson's Records Bldg.
BLD-Final7/6/20007/7/20007/7/2000APART
Details
###-#### str ok ok for 409 tosign for me when his c/n' are taked care of 7/7/00 11:11:53 AM
FIRE-Final Inspection7/6/20007/7/20007/7/2000APART
DetailsRick Jackson
###-#### Need supervised alarm valves on sprinkler system 7/10/00 10:23:37 AM
BLD-Final6/27/20006/29/20006/28/2000APASS
DetailsJim Storey
ron ###-#### fire safety is also going out am
FIRE-Final Inspection6/27/20006/29/20006/28/2000ACANC
DetailsRick Jackson
ron ###-####
FIRE-Sprinkler Rough-in6/23/20006/26/20006/26/2000ACANC
DetailsRick Jackson
door fan test ###-#### 10:00 if possible-----per dave miller does not need insp-cancel
BLD-Framing/Rough-in6/22/20006/22/20006/22/2000PPASS
DetailsJim Storey
grid ceiling Ron ###-####
BLD-Framing/Rough-in6/5/20006/5/20006/5/2000PPART
DetailsJim Storey
###-#### tunnel coridor wall configuation at north 2 nd floor exit. 6/6/00 8:38:15 AM
BLD-Framing/Rough-in6/1/20006/2/20006/2/2000AFAIL
DetailsJim Storey
Ron ###-####
BLD-Foundation5/26/20005/30/20005/30/2000APART
DetailsJim Storey
Ron ###-#### pending special insp reinsp corection of weld studs. 5/30/00 1:38:13 PM
BLD-Foundation5/15/20005/16/20005/16/2000APASS
DetailsJim Storey
###-####
BLD-Concrete5/8/20005/9/20005/9/2000APART
DetailsJim Storey
Ron ###-#### pending report for 4 ft to 8 ft lift on cmu. 5/9/00 8:40:50 AM
BLD-Footing5/3/20005/4/20005/4/2000APART
DetailsJim Storey
###-#### pending report / wall partion framing ok 5/4/00 11:43:31 AM
BLD-Final4/19/20004/20/20004/20/2000APART
DetailsJim Storey
###-#### temp occ ok letter on site for south end of bldg. on site to verrify that all inspectors ok with area. 4/20/00 3:13:18 PM
FIRE-Final Inspection4/18/20004/19/20004/19/2000APART
DetailsRick Jackson
###-#### Phase I okay 4/20/00 8:20:56 AM
BLD-Final4/18/20004/19/20004/19/2000APART
DetailsJim Storey
###-#### ###-####temp ok for south end of the project. 4/19/00
FIRE-Final Inspection4/13/20004/14/20004/14/2000AFAIL
DetailsRick Jackson
###-#### Exit hardware; extinguishers. 4/17/00 1:49:16 PM
BLD-Framing/Rough-in3/17/20003/20/20003/20/2000APART
DetailsJim Storey
RON ###-#### FR
BLD-Framing/Rough-in3/14/20003/14/20003/14/2000PPASS
DetailsJim Storey
ron ###-#### Resubmittal approved & delivered to site. Frame of meanwhile on resubmittal ok. 3/16/00 11:30:27 AM
Routing - PLUMBING3/10/2000 3/13/2000 PEND
PLAN RESUBMITTALS
Plan resubmittals received  3/10/2000 PEND
BLD-Framing/Rough-in2/18/20002/22/20002/22/2000APART
DetailsJim Storey
###-#### Framing ok have engineer address holes in sheer N/E corner of bld. 2/28/00 2:02:42 PM
BLD-Concrete2/14/20002/15/20002/15/2000APART
DetailsJim Storey
###-#### Massonary wall 8 ft elv. bar ok pending special insp. report. 2/15/00 10:46:48 AM
BLD-Concrete2/11/20002/14/20002/14/2000PPART
DetailsRuss Owen
###-####--ron concrete bar Requires special inspection, unable to go by. 2/15/00 1:29:32 PM
BLD-Footing1/27/20001/27/20001/27/2000ACANC
DetailsJim Storey
Ron ###-####
BLD-Foundation1/24/20001/24/20001/24/2000PPART
DetailsRuss Owen
ron-- ###-#### found pendingsp insp approvals ind footings 1/25/00 7:29:16 AM
Routing Off Site - STRUCTURAL1/21/2000 1/24/2000  
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
RECEIVED STRUCTURAL REVIEW LETTER BY CH2MHILL DATED 1/23/00 FOR ALBERTSON'S RECORDS BLDG RESUB NO. 2. ROUTED TO CARL W. KMM
Plan resubmittals received  1/21/2000 DONE
RECEIVED PLAN RESUBMITTALS FROMHOSFORD, LARSON, RUDEEN, REVISED STRUCTURAL DRAWINGS, FORWARDED SAME TO CARL WESTFALL. 1/21/00 DAR
BLD-Footing1/18/20001/19/20001/19/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/18/2000 at 12:44:02. Contact: . Rebar ok pend special insp. report. 1/20/00 9:15:06 AM
Plan resubmittals received  1/13/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM KIRK MORRISON, HARSFORD , RUDEEN , LARSON, FORWARDED SAME TO JIM STOREY. 1/13/00 DAR
BLD-Footing1/11/20001/12/20001/12/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/11/2000 at 11:45:59. Contact: ###-####. Interior pad ft ok pending special insp report.
Routing Off Site - A.C.H.D1/10/20001/10/20001/10/2000 DONE
No impact fees due for this project per letter from the ACHD John Bianchi
Issue PAID IN FULL permit  1/10/2000 DONE
Print Occupancy Form  9/23/1999 DONE
Telephone call  9/23/1999 DONE
called permit ready need ACHD
Routing - PLAN CHECK9/8/1999 9/22/1999 PASS
Plan Reviewer's activity  9/22/1999 PASS
Drawings approved, with conditions, after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  9/22/1999 PASS
Routing Off Site - STRUCTURAL7/22/1999 9/22/1999 PASS
Plan assigned to (CJW)8/20/1999 9/22/1999 PASS
DetailsCarl Westfall
9/22/1999 11:59:55 CJW - activity updated through activity BLDA022 from case BLD99-02161.
Routing - PLUMBING8/27/1999 9/8/1999 PASS
cant overload existing system
Plan resubmittals received  8/31/1999
RECEIVED TWO COPIES OF REVISED DRAWINGS, SHEETS A2.01, A5.00, A6.00, A6.01, A6.04, TWO COPIES OF SUPPLEMENTAL STRUCT. CALCULATIONS AND ONE RESPONSE LETTER. ROUTED TO CARL WESTFALL. KMM
Plan Review Completed(1st rev)  8/27/1999
Routing - FIRE8/26/1999 8/27/1999 PASS
Routing - PLAN CHECK7/26/1999 8/26/1999  
Plan Reviewer's activity  8/23/1999  
UBC plan review started August 23, 1999 and finished August 26, 1999. A response from the architect is required. See the conditions list.
Plan assigned to (R_H)7/22/1999 8/20/1999
Details
8/20/99 Reassigned to Carl Westfall by M. Southard.
Routing - PUBLIC WORKS7/23/1999 7/26/1999 PASS
Plan assigned to (MYS)7/16/1999 7/22/1999
DetailsMarlene Southard
Plan resubmittals received  7/22/1999
RECEIVED SUBMITTAL FOR OUTSIDE ENG. SHEETS S1.1 THRU S3.2 ROUTED TO VIA PDQ TO OUTSIDE ENG. KMM
Routing - PLANNING7/22/1999 7/22/1999 PASS
Plan routing begun/TENANTS  7/22/1999
Route to PLANNING, PUBLIC WORKS, PLAN CHECK and FIRE. Route off site to the Structural Engineer for review.
Plan Reviewer's activity  7/22/1999
Sent FAX memo to David Rudeen to let him know we needed an additional set of structural drawings for the outside engineer, and to inform him that a separate permit would be required for the storage racks. See memo attached to plans.
Plans ACCEPTED BY PLAN TECH  7/19/1999 PEND
Application received  7/16/1999 PEND
RECEIVED PLAN RESUBMITTALS ADDRESSED TO JIM STORY, ADVISED HIM OF SAME AND HE SAID TO LOG THEM IN AND SEND THEM TO PLUMBING. 3/10/00 DAR
Recd Pcfee & Taken To Pln CK  7/16/1999
Routing Off Site - STRUCTURAL7/22/1999  
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
9-16-99 RECEIVED STRUCTURAL REVIEW LETTER FROM CH2MHILL ROUTED TO CARL W. KMM
Case Summary (BLD)     
Plan Review Report