Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02183
StatusFinaled
Name STEVE EDDY
Site Address 2510 W FAIRVIEW AVE
Project NameMCD'S/CHEVRON
Customer Number 
ePlanReviewNo
Description
MCDONALDS/CHEVRON * TO CONSTRUCT A NEW 4048 SQ. FT. NON-COMBUSTIBLE FUEL ISLAND CANOPY PER APPROVED PLANS AND ATTACHMENTS . CUP99-0020 PC#562-99
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/20/1999 6/20/2000 DONE
BLD-Final6/15/20006/15/20006/15/2000PPASS
Details
Added by Inspector: 338 On 6/15/00 made ok for letter
Letter of compliance  6/15/2000 DONE
Letter of Compliance #18516 issued 6-15-00.
BLD-Final3/23/20003/24/20003/24/2000PPART
Details
###-#### signed the temp col 03/27/2000 6:47:56 AM
Temporary occupancy  3/24/2000 PART
Temp. Occ. Cert. #3998 issued 3-24-00 to McDonald's Chevron.
FIRE-Final Inspection3/22/20003/23/20003/23/2000PPASS
DetailsRick Jackson
###-#### Rod
Print Occupancy Form  3/23/2000 DONE
Print Occupancy Form  3/23/2000 DONE
BLD-Footing11/8/199911/9/199911/9/1999PPART
Details
Rod ###-#### ready at 2:30 they will pour at 3:30 Ok to pour brace frame area and canopy pads.
Issue PAID IN FULL permit  9/22/1999 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/20/1999 PASS
Print Occupancy Form  9/20/1999 DONE
Inspection Record Card- Bld  9/20/1999 DONE
Telephone call  9/20/1999 DONE
called permit ready
Plan assigned to (MLO)7/22/1999 9/20/1999 PASS
DetailsMike Otto
9/20/1999 09:15:44 MLO - activity updated through activity BLDA022 from case BLD99-02183.
Routing - PLANNING9/14/19999/14/19999/17/1999 PASS
approved per DRH99-0038, and as noted on lighting cut-sheets.
Plan resubmittals received  9/14/1999 PEND
Routing - PLAN CHECK9/14/1999 9/14/1999 PASS
Routing Off Site - STRUCTURAL8/20/1999 9/1/1999 PASS
RECEIVED A STRUCTURAL REVIEW LETTER BY OUT SIDE ENG. ROUTED TO MIKE O. KMM
Plan resubmittals received  8/26/1999
RECEIVED THREE COPIES OF REVISED ASSEMBLY PERSPECTIVE - OVERHANG RISE SHEET, AND ONE COPY OF WRITTEN RESPNSE. ROUTED TO MIKE O. KMM
Plan resubmittals requested  8/20/1999 FAIL
STRUCTRUAL CORRECTIONS AND SITE PLAN REQUIREMENTS MAILED AND FAXED TO STEVE EDDY. 8-20-99 MLO
Plan resubmittals received  8/19/1999
RECEIVED FOUR COPIES OF SIGNED AND SEALED PRINTS. ONE COPY OF STRUCTURAL CALCS. ONE RESPONSE LETTER. ROUTED TO MIKE O. KMM
Routing - PLAN CHECK8/17/1999 8/19/1999 FAIL
Routing Off Site - STRUCTURAL8/10/1999 8/17/1999 FAIL
CONTACTED PDQ TO TAKE REVISED SHEETS RECEIVED 8-10-99, TO OUTSIDE ENG. KMM
Plan resubmittals received  8/10/1999
8-10-99 RECEIVED REVISED CERT. OF VALUE ROUTED TWO TO MIKE AND ONE IN FILE. TWO COPIES OF SHEETS C-1, AND C3.1 THREE COPIES OF REVISED SHEETS 1 (ANCHOR BOLT) AND 2 (FRAMING PLAN) THREE COPIES OF STRUCT. CALCS. AND LSI INFORMATION, AND LIGHTING SHEET. ROUTED TO MIKE O. AND SENT ONE COPY WITHOUT SITE PLAN TO OUTSIDE ENG. KMM
Telephone call  8/4/1999 PEND
RECEIVED CALL FROM LOY TAYLOR AND GEORGE BAKER OF MCDONALDS REGARDING FREEZER\COOLERS. A CHANGE WILL BE MADE AND MORE PLANS WILL BE SUBMITTED. STRUCTURAL CORRECTIONS ARE BEING WORKED ON BY THEIR ENGINEER AND WILL BE SUBMITTED WHEN COMPLETED. MLO
Telephone call  7/30/1999
HAD CALL FROM ENGINEER ON CANOPY REGARDING ROOF OVERFLOW REQURIEMENTS. FAXED COPY OF UBC SEC. 1506 TO ENGINEER. MLO
Plan Review Completed(1st rev)  7/29/1999
Plan resubmittals requested  7/29/1999 FAIL
NON-STRUCTURAL REVIEW CORRECTIONS FAXED AND MAILED TO STEVE EDDY. MLO
Routing - FIRE7/29/1999 7/29/1999 PASS
Routing - PLAN CHECK7/27/1999 7/28/1999 FAIL
Routing - PLANNING7/27/1999 7/27/1999 PEND
revised plans which comply with DRH99-0038 conditions of approval have not been addressed. See letter in DRH99-0038 file.
Routing - PUBLIC WORKS7/23/1999 7/26/1999 PASS
Plan assigned to (MYS)7/20/1999 7/23/1999
DetailsMarlene Southard
He said that Mike Otto told him to resubmit for the canopy... THANKS!
Plans ACCEPTED BY PLAN TECH  7/23/1999 PASS
RECEIVED SITE PLAN, AM READY TO ROUTE. KMM
Plans ACCEPTED BY PLAN TECH  7/21/1999 PEND
REQUIRES SITE PLAN. CONTACTED CHRIS CORLETT OF THIS NEED. I WILL ROUTE TO OUTSIDE ENG. BUT HOLD FOR INHOUSE ROUTING UNTIL I RECEIVE SITE PLAN. KMM
Application received  7/20/1999
Received Certificate of Value  7/20/1999 PASS
Routing Off Site - STRUCTURAL7/22/1999 7/6/1999
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Plan routing begun/NEW & ADDTN7/22/1999  
WILL START INHOUSE ROUTING WHEN I RECEIVE SITE PLAN. KMM