Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02185
StatusFinaled
Name VFP VC
Site Address 3527 S FEDERAL WAY
Project NameFAMILY CENTER-FRED MEYER
Customer Number 
ePlanReviewNo
Description
FAMILY CENTER - FRED MEYER RETAIL STORE * TO CONSTRUCT A NEW 174,290 SQ. FT., ONE STORY, RETAIL BUILDING WHICH INCLUDES A GROCERY, BAKERY, DELI, STARBUCKS COFFEE BAR, CLOTHING, BUILDING MATERIALS, GARDEN SHOP AND GENERAL MECHANDISE. THIS BUILDING WILL ALSO INCLUDE FOUR FUTURE SHELL TENANT SPACES WITH VANILLA FINISH. CONSTRUCTED OF CONCRETE FOUNDATION AND SLAB FLOORS, MASONRY EXTERIOR WALLS AND STRUCTURAL STEEL FRAME AND STEEL ROOF JOISTS WITH METAL DECK AND SINGLE PLY ROOFING SYSTEM. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR UNLIMITED AREA. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. NOTE: THIS PLAN WAS MODIFIED TO INCLUDE A STARBUCKS COFFEE BAR 2/9/01. DRH98-0239/CUP98-0099/PC#563-99/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Inspection Record Card- Bld  10/10/2002 DONE
(F) Reprint permit  2/28/2002 DONE
(F) Reprint permit  5/23/2001 DONE
Fee Review-notes7/21/1999 4/11/2001 DONE
4/10 called GC for cert will fax
Fee Review-notes10/28/199910/28/19993/21/2001 DONE
Override - Parcel Holds  2/27/2001  
BLD-Final2/16/20012/20/20012/20/2001APASS
DetailsJim Storey
###-####
Permanent Occupancy 2/20/20012/20/2001 DONE
Details
Override - Parcel Holds  2/20/2001  
Permanent occupancy  2/20/2001 DONE
Perm. Occ. Cert. #8576 issued 2-20-01 to Fred Meyer.
Code Occupancy Approval  2/20/2001 PASS
ALL CONDITIONS IN THE BUILDING AREA ARE COMPLETE, FINAL OCCUPANCY SIGNED OFF.
BLD-Final2/16/20012/16/20012/16/2001PFAIL
DetailsJim Storey
###-#### wes fn occ c/n door smoke seal/hardware/closers/fire stopping in machenry rm. 2/20/2001 8:45:44 AM
Override - Parcel Holds  2/16/2001  
Override - Parcel Holds  2/16/2001  
FIRE-Final Inspection2/15/20012/15/20012/15/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 2/15/2001 4:07:49 PM
Override - Parcel Holds  2/15/2001  
Issue & PRINT permit  2/15/2001 DONE
Routing - PLAN CHECK2/14/2001 2/14/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/14/2001 PASS
Telephone call  2/14/2001 DONE
talked to john to verify plans are ready
Routing - FIRE2/9/2001 2/14/2001 PASS
Plan modification for Starbucks. Approved with no comments.
Plan assigned to (JCM)2/6/2001 2/14/2001 PASS
DetailsJohn Menard
2/14/01 13:27:23 JCM - activity updated through activity BLDA022 from case BLD99-02185.
FIRE-Final Inspection2/8/20012/12/20012/12/2001AFAIL
DetailsRick Jackson
Jon Small ###-#### need balance report for hood system and exit sign above personnel door by MPU overhead door per plans 2/12/2001 3:23:42 PM
BLD-Final2/8/20012/12/20012/12/2001PNR
DetailsJim Storey
###-#### John
Override - Parcel Holds  2/12/2001  
Override - Parcel Holds  2/12/2001  
Override - Parcel Holds  2/12/2001  
Code Occupancy Approval  2/12/2001 FAIL
received request for occupancy 2-8-01, made meeting for 10:00 am monday 2-12-01, site inspection showed some items not completed so I only signed Temp. Occupancy till all done.
While making this entry I found a parcel Hold in effect, I'm not sure what is reason but will check with Jim Storey.
Plan Reviewer's activity  2/9/2001 PASS
Plan modification for the Starbucks Coffee bar area has been reviewed and approved as submitted. JCM
Routing - PLAN CHECK2/8/2001 2/9/2001 PASS
Plan Modification for the Starbucks. KMM
Override - Parcel Holds  2/8/2001  
Override - Parcel Holds  2/8/2001  
Routing - PUBLIC WORKS2/6/2001 2/8/2001 PASS
Plan Modification for the Starbucks. KMM
Routing - PLUMBING2/8/2001 2/8/2001 PASS
Plan Modification for the Starbucks. KMM floor sinks and indirect waste receptors must be in full view at all times., additional cross connection protection may be required.
Override - Parcel Holds  2/8/2001  
Plans ACCEPTED BY PLAN TECH  2/6/2001 DONE
Plan modification for the Starbucks. KMM
Plan routing begun/TENANTS  2/6/2001 DONE
Plan Modification for the starbucks. KMM
CHANGE STATUS TO (PND)  2/5/2001 DONE
plan mod received/mls
CHANGE STATUS TO (PND)  2/2/2001 DONE
collected $500 plan modification fee and resubmittals for the plan modification...
CHANGE STATUS TO (ISS)  2/2/2001 DONE
decided that he couldn't do a plan modification as of yet...
FIRE-Alarm Testing1/25/20011/26/20011/26/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/25/2001 at 10:02:31. Contact: ###-####. c/n issued (exit signs, smoke vents, alarms, address, etc) 1/26/2001 3:53:30 PM
BLD-Framing/Rough-in12/20/200012/21/200012/21/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/20/2000 at 11:16:06. Contact: ###-####. cellings in tennent spaces ok 12/21/2000 11:01:30 AM
BLD-Framing/Rough-in12/11/200012/11/200012/11/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2000 at 09:16:56. Contact: ###-####. ceilling ok jewellery store. 12/11/2000 3:48:17 PM
BLD-Framing/Rough-in12/1/200012/1/200012/1/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/01/2000 at 09:42:28. Contact: ###-####. north corridor ok for cover plm acess door must be rated check at later date. 12/1/2000 2:29:56 PM
BLD-Framing/Rough-in11/21/200011/21/200011/21/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/21/2000 at 10:37:10. Contact: ###-####. coridor plm/screws on 12 inch ceilling and clips/light wires and seismic pods./putty pads 2 loc corrdor. 11/24/2000 12:44:48 PM
BLD-Framing/Rough-in11/16/200011/17/200011/17/2000PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/16/2000 at 16:00:29. Contact: ###-####. main canopy framing screw atchment not per plan leadger on slpit face not per plan rfi for atchment. 11/17/2000 5:01:49 PM
BLD-Framing/Rough-in11/8/200011/9/200011/9/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/08/2000 at 14:57:21. Contact: ###-####. c/n previous rated const. ok/ east canopy front ok for cover. 11/13/2000 9:19:25 AM
BLD-Framing/Rough-in11/7/200011/7/200011/7/2000PFAIL
DetailsJim Storey
Wes ###-#### colums at mech. mez. not wrapped/ ele putty pads required at center coridor north / south coridor blow patch. 11/8/2000 8:52:39 AM
BLD-Framing/Rough-in11/1/200011/2/200011/2/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2000 at 13:32:00. Contact: ###-####. tennent spaces ok at north west corner of bldg curtian wall west /south area ok for cover . 11/2/2000 4:15:17 PM
BLD-Framing/Rough-in10/20/200010/23/200010/23/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/20/2000 at 09:03:04. Contact: ###-####. framing ok exterior and interior walls / pending mech mez. and frnt tunnel corridors. 10/23/2000 12:49:37 PM
BLD-Framing/Rough-in10/5/200010/6/200010/6/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/05/2000 at 11:19:23. Contact: ###-####. home storage area south west walls and all south tunnel corridors ok for cover. 10/6/2000 11:03:07 AM
BLD-Framing/Rough-in9/28/20009/29/20009/29/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/28/2000 at 15:50:15. Contact: ###-####. east coridor must have speaker gyp box protection. 9/29/2000 5:30:14 PM
BLD-Framing/Rough-in9/22/20009/25/20009/25/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/22/2000 at 16:04:15. Contact: ###-####. good to cover east to west grid line 10 only one side rated tunnels for reinsp c/n . 9/25/2000 11:42:04 AM
BLD-Framing/Rough-in8/29/20008/30/20008/30/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/29/2000 at 13:11:04. Contact: ###-####.
Additional plans submitted  8/18/2000 DONE
RECEIVED ONE COPY OF THERMOPLASTIC SINGL-PLY MEMBRANE ROOFING RESUBMITTAL. ROUTED TO JIM STORY. KMM
BLD-Framing/Rough-in8/14/20008/15/20008/15/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/14/2000 at 16:08:13. Contact: ###-####. roof decking ok pending s/i report. 8/16/2000 1:31:46 PM
BLD-Concrete8/14/20008/14/20008/14/2000PPASS
DetailsJim Storey
Added by Inspector: 301 On 8/14/2000 aproved resubmital and archived plan.
BLD-Footing8/9/20008/10/20008/10/2000APART
Details
Scheduled by a contractor via Hello! on 08/09/2000 at 11:27:29. Contact: ###-####. pending spinsp approvals 8/10/2000 3:38:57 PM
BLD-Footing8/7/20008/8/20008/8/2000APART
Details
Scheduled by a contractor via Hello! on 08/07/2000 at 13:06:15. Contact: ###-####. on site with 301 c/nissued for bolt projection at post bases and for changes for the steel decking attachments, concrete approved with sp insp approvals 8/8/2000 9:28:15 AM
BLD-Foundation8/3/20008/4/20008/4/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/03/2000 at 12:52:53. Contact: ###-####. rebar ok south wall line at loading docl/ walked roof joist and girder to colum atchaments ok steel deck atachments changed to hilti shot pins requir enginer of record to submit change. east deck 4 bays to the west ok pending aproval of resubmital 8/4/2000 10:33:04 AM
BLD-Footing7/27/20007/28/20007/28/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/27/2000 at 15:57:37. Contact: ###-####. pending report s/i. 7/28/2000 11:49:08 AM
BLD-Footing7/26/20007/27/20007/27/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/26/2000 at 15:02:42. Contact: ###-####. pending report from s/i. 7/27/2000 9:56:34 AM
BLD-Footing7/24/20007/25/20007/25/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/24/2000 at 08:22:37. Contact: ###-####. rebar ok pending s/i report. 7/25/2000 8:16:15 AM
BLD-Footing7/24/20007/24/20007/24/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/24/2000 at 08:35:17. Contact: ###-####. south/east 100 ft to 200 ft. pending report appears ok on rebar. 7/24/2000 1:30:55 PM
BLD-Footing7/19/20007/20/20007/20/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/19/2000 at 10:59:43. Contact: ###-####. covered with s/i. 7/20/2000 2:53:42 PM
BLD-Footing7/17/20007/18/20007/18/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/17/2000 at 15:11:00. Contact: ###-####.
BLD-Footing7/14/20007/17/20007/17/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/14/2000 at 15:25:38. Contact: ###-####. pending s/i report. 7/17/2000 1:34:18 PM
BLD-Footing7/13/20007/14/20007/14/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/13/2000 at 14:31:36. Contact: ###-####.
BLD-Foundation7/13/20007/14/20007/14/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/13/2000 at 14:33:21. Contact: ###-####.
BLD-Footing7/12/20007/13/20007/13/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/12/2000 at 12:58:19. Contact: ###-####. pending s/i report. 7/13/00 11:16:21 AM
BLD-Footing7/11/20007/12/20007/12/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/11/2000 at 14:43:07. Contact: ###-####. gil called and cancled via phone. 7/12/00 1:37:58 PM
BLD-Footing7/11/20007/12/20007/12/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/11/2000 at 14:43:07. Contact: ###-####.
BLD-Footing7/10/20007/11/20007/11/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/10/2000 at 13:52:01. Contact: ###-####. pending s/i report . 7/11/00 1:46:56 PM
BLD-Footing7/7/20007/10/20007/10/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/07/2000 at 16:28:53. Contact: ###-####. pending s/i report. 7/10/00 5:11:19 PM
BLD-Footing7/6/20007/7/20007/7/2000PPART
Details
Scheduled by a contractor via Hello! on 07/06/2000 at 15:12:50. Contact: ###-####.
BLD-Footing7/5/20007/6/20007/6/2000APART
Details
Scheduled by a contractor via Hello! on 07/05/2000 at 11:56:51. Contact: . SOUTH EAST TO NORTHEAST FOOTER 7/7/00 6:29:36 AM
(F) Reprint permit  12/30/1999 DONE
Issue PAID IN FULL permit  12/29/1999 DONE
Print Occupancy Form  12/22/1999 DONE
Inspection Record Card- Bld  12/22/1999 DONE
Telephone call  12/22/1999 DONE
called Evan Eagle, was on vacation, talked to a Jennifer who was covering for him. Permit ready and fees due and need ACHD cert.
Routing - PLAN CHECK9/28/19999/28/199912/21/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/21/1999 PASS
Plan assigned to (JCM)7/28/1999 12/21/1999 PASS
DetailsJohn Menard
12/21/1999 14:23:18 JCM - activity updated through activity BLDA022 from case BLD99-02185.
Plan resubmittals received  12/20/1999 PASS
RECIEVED COPIES OF RECORDED RECORD OF SURVEY AND NONBUILD AGREEMENT FOR UNLIMITED AREA OF THIS BUILDING.
Plan resubmittals requested  11/1/1999 PEND
Routing Off Site - STRUCTURAL10/7/199910/7/199910/13/1999 PASS
RESUBMITTAL PLANS SENT TO ENGINEERING CONSULTANT VIA PDQ. 10/7/99 DAR RESUBMITTED STRUCTURAL PLAN REVISIONS HAVE BEEN REVIEWED AND APPROVED BY THE CONSULTING ENGINEER.
Plan resubmittals requested  10/12/1999 PEND
FAXED EVAN EAGLE A REQUEST FOR ADDITIONAL INFORMATION AND PLAN REVISIONS. THIS REQUEST IS BASED ON THE LAST REVISIONS SUBMITTAL, RECEIVED 10/5/99.
Plan resubmittals received  10/5/1999 PEND
PLAN RESUBMITTALS RECEIVED FROM SIENNA ARCHITECTS, SAME FORWARDED TO JOHN MENARD. 10/5/99 DAR
Plan Reviewer's activity  10/3/1999 PEND
FAXED TOM AT THE DAKOTA COMPANY THE INFORMATION NEEDED TO COMPLETE A RECORDED SHARED YARD EASEMENT FOR AN UNLIMITED AREA BUILDING.
Plan resubmittals received  9/29/1999 DONE
RECEIVED THREE COPIES OF REVISED SHEETS S1.0, S2.1, S2.2, S2.3, S2.4, S2.5, S2.6, S3.1, S3.2, S3.3, S3.4, S3.5, S3.6, S3.7, S4.0, S5.0, S5.1, S6.0, S6.1, S6.2, S6.3. ONE COPY OF RESPONSE LETTER. ROUTED TO JOHN M. KMM
Routing - PLUMBING9/20/1999 9/28/1999 PASS
provide backwater valve for trench drain in garden area, all traps not on an approved combination waste and vent system must be vented, case wash downs may require additional cross connection protection, poin of use backflow protection may be required
Plan resubmittals received  9/26/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM SIENNA ARCHITECTS, FORWARDED SAME TO JOHN MENARD. 10/26/99 DAR
Routing - PUBLIC WORKS9/20/19999/20/19999/20/1999 PASS
Routing - PLAN CHECK9/13/19999/13/19999/20/1999  
Plan Reviewer's activity  9/20/1999 PEND
INSERTED REVISED PLUMBING, ELECTRICAL AND KITCHEN PLANS AND ROUTED TO PUBLIC WORKS AND PLUMBING FOR REVIEW.
Plan Review Completed(1st rev)  9/13/1999 PEND
Plan resubmittals received  9/13/1999 PEND
DetailsJohn Menard
RECEIVED PLAN RESUBMITTALS FOR PLUMBING FROM GAUSMAN & MOORE FORWARDED SAME TO JOHN MENARD. 9/13/99 DAR
Routing - FIRE9/1/19999/7/19999/7/1999 PASS
Routing - PLAN CHECK8/13/1999 9/1/1999
Plan resubmittals requested  8/30/1999 PEND
FAXED EVAN EAGLE AT SIENNA A COPY OF THE COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS.
Plan resubmittals requested  8/30/1999 PEND
MAILED EVAN EAGLE AT SIENNA A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
Routing Off Site - STRUCTURAL7/28/1999 8/26/1999
SENT ONE SET OF PLANS AND STRUCTURAL CACULATIONS,ONE PROJECT MANUAL(VOLUMES 1 & 2) TO STRUCTURAL ENGINEERING CONSULANT. 8-26-99 RECEIVED STRUCTURAL REVIEW LETTER FOR FRED MEYER FROM CH2MHILL. ROUTED TO JOHN M. KMM
Routing - PLANNING8/11/1999 8/13/1999 PASS
Mike Hall reviewed per CUP98-0099 and Marty Santoyo reviewed per DRH98-0239.
Routing - PLUMBING8/10/1999 8/11/1999 FAIL
public works approval required prior to plumbing review
Routing - PUBLIC WORKS7/28/1999 8/9/1999 FAIL
NO GARBAGE DISPOSAL ALLOWED BY CITY ORDANANCE. PER WALT BAUMGARTNER, ENVIRONMENTAL SERVICES. 8/10/99 DAR
Plans ACCEPTED BY PLAN TECH  7/28/1999 PEND
RECEIVED PLANS ON 7/21/99 SEVERAL GROUPS STAMPE NOT FOR CONSTRUCTION. QUADRANT ENGINEERING REPLACED ALL OF THOSE PLANS ON 7/27/99. 7/28/99 DAR
Plan assigned to (MYS)7/21/1999 7/28/1999
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  7/21/1999
Application received  7/20/1999
Extend Permit 180 days    EXTE
permit extended by jeff jones-letter sent out feb 23, 2000 to Mr. Eagle- new expiration date is 8/21/2000