Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02186
StatusFinaled
Name VFP VC
Site Address 3636 S FINDLEY AVE
Project NameFAMILY CENTER-BLDG A1
Customer Number 
ePlanReviewNo
Description
THE FAMILY CENTER AT FEDERAL WAY (SHELL BUILDING A1) TO CONSTRUCT A NEW 19,000 SQUARE FOOT, ONE STORY, MULTI-TENANTS SHELL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF CONCRETE FOUNDATION AND SLAB FLOORS, MASONRY EXTERIOR WALLS, STEEL JOIST AND METAL ROOF WITH SOME WOOD OVERBUILD. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ALLOWABLE AREA INCREASE. THIS IS A SHELL PERMIT ONLY, NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED TO FINISH EACH PROPOSED TENANT SPACE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DRH98-0239, CUP98-0099, PC#564-99. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/19/2006  
Case Summary (BLD)  11/5/2003  
Fee Review-notes7/21/1999 3/21/2001 DONE
Code Occupancy Approval  12/21/2000 PEND
FINAL SIGNED OFF AT THIS TIME, WILL HOLD MAJOR BUILDING FOR PARKING LOT IMPROVEMENT (FRED MEYER).
Letter of compliance  12/20/2000 DONE
Letter of Compliance #21292 issued 12-20-00.
BLD-Final12/13/200012/14/200012/14/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/13/2000 at 16:01:10. Contact: ###-####. l/c for final ok upon perm sign offs from public works and p&z. 12/14/2000 4:09:43 PM
FIRE-Final Inspection10/10/200010/11/200010/11/2000APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/10/2000 at 15:39:38. Contact: ###-####.
FIRE-Final Inspection10/4/200010/5/200010/5/2000AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/04/2000 at 12:57:05. Contact: ###-####. batteries not right size for alarm panel 10/6/2000 9:54:38 AM
BLD-Other9/26/20009/26/20009/26/2000PPASS
DetailsJim Storey
Added by Inspector: 301 On 9/26/2000 recieved specail insp. final approval letter placed in the archive.
Code Occupancy Approval  9/22/2000 DONE
Inspection was requested. This permit was for SHELL ONLY. There was a line for P&Z so, I signed it under temporary and noted inspection was for SHELL ONLY. (No real need to sign except that line was on card so they really wanted a signature.)
FIRE-Final Inspection9/20/20009/21/20009/21/2000PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 09/20/2000 at 13:40:21. Contact: ###-####. need alarm plans; heat in building and riser room 9/22/2000 11:01:22 AM
Print Occupancy Form  9/8/2000 DONE
Print Occupancy Form  9/7/2000 DONE
FIRE-Final Inspection1/12/20001/13/20001/13/2000AFAIL
DetailsRick Jackson
not a final inspection - underground flush okay
BLD-Framing/Rough-in1/6/20001/7/20001/7/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/06/2000 at 14:56:20. Contact: . Contractor not at site.
BLD-Framing/Rough-in12/29/199912/30/199912/30/1999APART
Details
MADE OK TO COVER WITH ELEC. INSP BLESSINGSScheduled by a contractor via Hello! on 12/29/1999 at 12:49:14. Contact: .
BLD-Framing/Rough-in12/22/199912/23/199912/23/1999APART
DetailsJim Storey
Truss over build in progress.
FIRE-Conference12/20/199912/20/199912/20/1999PPART
DetailsRick Jackson
Buck, ###-#### - conference. Requested sprinkler plans; outside control for sprinklers or 1hr riser room needed- TVFP to submit plans.
BLD-Other12/13/199912/13/199912/13/1999APART
Details
A-1 ok to pour R-bar placed.
BLD-Other12/10/199912/13/199912/13/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/10/1999 at 09:12:40. Contact: . Trans. To Paine.
BLD-Other11/29/199911/30/199911/30/1999APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/29/1999 at 08:21:22. Contact: ###-####. Rebar ok 14-18 elv. Massonary grout placement.
BLD-Other11/22/199911/24/199911/24/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/22/1999 at 10:53:48. Contact: ###-####. 10-14 ft. Rebar ok- massonary.
BLD-Concrete11/12/199911/15/199911/15/1999APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/12/1999 at 08:49:27. Contact: ###-####. 1st lift of massonary rebar ok.
BLD-Foundation11/1/199911/2/199911/2/1999APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/01/1999 at 12:24:17. Contact: . Piers at corner
FIRE-Supply Line Cover10/28/199910/28/199910/28/1999PPASS
DetailsRick Jackson
Underground complete to Riser- okay to cover
BLD-Footing10/26/199910/27/199910/27/1999PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/26/1999 at 14:38:24. Contact: . Recall
BLD-Foundation10/26/199910/27/199910/27/1999PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/26/1999 at 14:39:24. Contact: . Re-call
BLD-Footing10/25/199910/26/199910/26/1999APASS
DetailsJim Storey
buck ###-#### Perimiter fn. Ok center pads ok
BLD-Foundation10/14/199910/18/199910/18/1999APASS
DetailsJim Storey
paul--- ###-#### stem wall insp Foundation wall ok
BLD-Footing10/12/199910/13/199910/13/1999APART
DetailsJim Storey
Paul ###-#### Rebar ok ft. ok
BLD-Footing10/11/199910/12/199910/12/1999PPART
DetailsJim Storey
Paul ###-#### Ft. ok
(F) Reprint permit  10/4/1999 DONE
Issue PAID IN FULL permit  10/1/1999 DONE
Inspection Record Card- Bld  9/30/1999 DONE
Routing - PLAN CHECK9/22/19999/22/19999/29/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/29/1999 PASS
Plan assigned to (JCM)7/22/1999 9/29/1999 PASS
DetailsJohn Menard
Routing - FIRE9/22/19999/22/19999/22/1999 PASS
Routing - PLAN CHECK8/24/1999 9/22/1999 PEND
Plan resubmittals received  9/21/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM QUADRANT CONSULTANTING, FORWARDED SAME TO JOHN MENARD. 9/21/99 DAR
Plan Review Completed(1st rev)  8/24/1999 FAIL
Routing - FIRE8/24/1999 8/24/1999 FAIL
NEED HYDRANT LOCATIONS SHOWN ON SITE PLAN. NEED FIRE FLOWS ON PLANS, PER UNITED WATER LETTER 04/27/99 TO ALL ARCHITECTS IN THE AREA AND FIRE DEPARTMENT REQUEST. NOTE: GRADING PERMIT BLD99-2195 IS STILL DENIED (08/24/99) DUE TO HYDRANT SPACING AND ACCESS PROBLEMS ON SITE PLANS.
Plan resubmittals requested  8/24/1999 PEND
MAILED WAYNE BELKA, PROJECT ARCHITECT, A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
Routing - PLAN CHECK8/11/1999 8/24/1999 PEND
Routing - PLANNING8/2/1999 8/11/1999 PASS
Approved per DRH98-0239. Pending review of conditional use requirements. Approved per 98-99 by M. Hall.
Routing - PLUMBING7/27/1999 8/2/1999 PASS
Routing - PUBLIC WORKS7/23/1999 7/28/1999 PASS
Plan assigned to (MYS)7/21/1999 7/22/1999 PASS
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK7/22/1999 7/22/1999
Plans ACCEPTED BY PLAN TECH7/22/1999 7/22/1999
Recd Pcfee & Taken To Pln CK  7/21/1999
Application received  7/20/1999
Case Summary (BLD)     
Case Summary (BLD)