Case Summary (BLD) | | | 12/19/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 11/5/2003 | | |
|
|
|
|
Fee Review-notes | 7/21/1999 | | 3/21/2001 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 12/21/2000 | | PEND |
|
|
|
FINAL SIGNED OFF AT THIS TIME, WILL HOLD MAJOR BUILDING FOR PARKING LOT IMPROVEMENT (FRED MEYER).
|
Letter of compliance | | | 12/20/2000 | | DONE |
|
|
|
Letter of Compliance #21292 issued 12-20-00.
|
BLD-Final | 12/13/2000 | 12/14/2000 | 12/14/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/13/2000 at 16:01:10. Contact: ###-####. l/c for final ok upon perm sign offs from public works and p&z. 12/14/2000 4:09:43 PM
|
FIRE-Final Inspection | 10/10/2000 | 10/11/2000 | 10/11/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/10/2000 at 15:39:38. Contact: ###-####.
|
FIRE-Final Inspection | 10/4/2000 | 10/5/2000 | 10/5/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/04/2000 at 12:57:05. Contact: ###-####. batteries not right size for alarm panel 10/6/2000 9:54:38 AM
|
BLD-Other | 9/26/2000 | 9/26/2000 | 9/26/2000 | P | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 9/26/2000 recieved specail insp. final approval letter placed in the archive.
|
Code Occupancy Approval | | | 9/22/2000 | | DONE |
|
|
|
Inspection was requested. This permit was for SHELL ONLY. There was a line for P&Z so, I signed it under temporary and noted inspection was for SHELL ONLY. (No real need to sign except that line was on card so they really wanted a signature.)
|
FIRE-Final Inspection | 9/20/2000 | 9/21/2000 | 9/21/2000 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 13:40:21. Contact: ###-####. need alarm plans; heat in building and riser room 9/22/2000 11:01:22 AM
|
Print Occupancy Form | | | 9/8/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/7/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/12/2000 | 1/13/2000 | 1/13/2000 | A | FAIL |
Rick Jackson
|
|
|
not a final inspection - underground flush okay
|
BLD-Framing/Rough-in | 1/6/2000 | 1/7/2000 | 1/7/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/06/2000 at 14:56:20. Contact: . Contractor not at site.
|
BLD-Framing/Rough-in | 12/29/1999 | 12/30/1999 | 12/30/1999 | A | PART |
|
|
|
MADE OK TO COVER WITH ELEC. INSP BLESSINGSScheduled by a contractor via Hello! on 12/29/1999 at 12:49:14. Contact: .
|
BLD-Framing/Rough-in | 12/22/1999 | 12/23/1999 | 12/23/1999 | A | PART |
Jim Storey
|
|
|
Truss over build in progress.
|
FIRE-Conference | 12/20/1999 | 12/20/1999 | 12/20/1999 | P | PART |
Rick Jackson
|
|
|
Buck, ###-#### - conference. Requested sprinkler plans; outside control for sprinklers or 1hr riser room needed- TVFP to submit plans.
|
BLD-Other | 12/13/1999 | 12/13/1999 | 12/13/1999 | A | PART |
|
|
|
A-1 ok to pour R-bar placed.
|
BLD-Other | 12/10/1999 | 12/13/1999 | 12/13/1999 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/10/1999 at 09:12:40. Contact: . Trans. To Paine.
|
BLD-Other | 11/29/1999 | 11/30/1999 | 11/30/1999 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/29/1999 at 08:21:22. Contact: ###-####. Rebar ok 14-18 elv. Massonary grout placement.
|
BLD-Other | 11/22/1999 | 11/24/1999 | 11/24/1999 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 10:53:48. Contact: ###-####. 10-14 ft. Rebar ok- massonary.
|
BLD-Concrete | 11/12/1999 | 11/15/1999 | 11/15/1999 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/12/1999 at 08:49:27. Contact: ###-####. 1st lift of massonary rebar ok.
|
BLD-Foundation | 11/1/1999 | 11/2/1999 | 11/2/1999 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/01/1999 at 12:24:17. Contact: . Piers at corner
|
FIRE-Supply Line Cover | 10/28/1999 | 10/28/1999 | 10/28/1999 | P | PASS |
Rick Jackson
|
|
|
Underground complete to Riser- okay to cover
|
BLD-Footing | 10/26/1999 | 10/27/1999 | 10/27/1999 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/26/1999 at 14:38:24. Contact: . Recall
|
BLD-Foundation | 10/26/1999 | 10/27/1999 | 10/27/1999 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/26/1999 at 14:39:24. Contact: . Re-call
|
BLD-Footing | 10/25/1999 | 10/26/1999 | 10/26/1999 | A | PASS |
Jim Storey
|
|
|
buck ###-#### Perimiter fn. Ok center pads ok
|
BLD-Foundation | 10/14/1999 | 10/18/1999 | 10/18/1999 | A | PASS |
Jim Storey
|
|
|
paul--- ###-#### stem wall insp Foundation wall ok
|
BLD-Footing | 10/12/1999 | 10/13/1999 | 10/13/1999 | A | PART |
Jim Storey
|
|
|
Paul ###-#### Rebar ok ft. ok
|
BLD-Footing | 10/11/1999 | 10/12/1999 | 10/12/1999 | P | PART |
Jim Storey
|
|
|
Paul ###-#### Ft. ok
|
(F) Reprint permit | | | 10/4/1999 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/1/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/30/1999 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/22/1999 | 9/22/1999 | 9/29/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/1999 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 7/22/1999 | | 9/29/1999 | | PASS |
John Menard
|
|
|
|
Routing - FIRE | 9/22/1999 | 9/22/1999 | 9/22/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/24/1999 | | 9/22/1999 | | PEND |
|
|
|
|
Plan resubmittals received | | | 9/21/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM QUADRANT CONSULTANTING, FORWARDED SAME TO JOHN MENARD. 9/21/99 DAR
|
Plan Review Completed(1st rev) | | | 8/24/1999 | | FAIL |
|
|
|
|
Routing - FIRE | 8/24/1999 | | 8/24/1999 | | FAIL |
|
|
|
NEED HYDRANT LOCATIONS SHOWN ON SITE PLAN. NEED FIRE FLOWS ON PLANS, PER UNITED WATER LETTER 04/27/99 TO ALL ARCHITECTS IN THE AREA AND FIRE DEPARTMENT REQUEST. NOTE: GRADING PERMIT BLD99-2195 IS STILL DENIED (08/24/99) DUE TO HYDRANT SPACING AND ACCESS PROBLEMS ON SITE PLANS.
|
Plan resubmittals requested | | | 8/24/1999 | | PEND |
|
|
|
MAILED WAYNE BELKA, PROJECT ARCHITECT, A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
|
Routing - PLAN CHECK | 8/11/1999 | | 8/24/1999 | | PEND |
|
|
|
|
Routing - PLANNING | 8/2/1999 | | 8/11/1999 | | PASS |
|
|
|
Approved per DRH98-0239. Pending review of conditional use requirements. Approved per 98-99 by M. Hall.
|
Routing - PLUMBING | 7/27/1999 | | 8/2/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/23/1999 | | 7/28/1999 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 7/21/1999 | | 7/22/1999 | | PASS |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | 7/22/1999 | | 7/22/1999 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | 7/22/1999 | | 7/22/1999 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/21/1999 | | |
|
|
|
|
Application received | | | 7/20/1999 | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|