PubWorks Occupancy Approval | 1/10/2003 | 1/10/2003 | 1/10/2003 | | DONE |
|
|
|
Drainage project for full Family Center project completed January 2001. No more inspections requested. Checked for and found complete 01/10/03. R.Rokovitz
|
(F) Reprint permit | | | 5/23/2001 | | DONE |
|
|
|
|
Fee Review-notes | 10/28/1999 | 10/28/1999 | 5/9/2001 | | DONE |
|
|
|
|
BLD-Final | 5/3/2001 | 5/4/2001 | 5/4/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 15:15:26. Contact: ###-####.
|
Letter of compliance | | | 5/4/2001 | | DONE |
|
|
|
Letter of Compliance #21488 issued 5-4-01.
|
BLD-Conference | 5/3/2001 | 5/3/2001 | 5/3/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/3/2001 9:39:20 AM w/ Mark..need eng's & spec insp's reports
|
BLD-Final | 5/2/2001 | 5/3/2001 | 5/3/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 12:01:05. Contact: ###-####...need all "final" docume 5/3/2001 4:53:22 PM ts, includingcivil eng's letter. 5/3/2001 4:53:32 PM 5/3/2001 4:54:21 PM
|
Code Occupancy Approval | | | 5/2/2001 | | PASS |
|
|
|
ALL CONDITIONS HAVE BEEN MET AND FINAL OCCUPANCY SIGNED OFF.
|
FIRE-Final Inspection | 4/27/2001 | 4/30/2001 | 4/30/2001 | A | CANC |
Joe Tawney
|
|
|
###-####. Cancel This permit was passed on 1/4/01 4/30/2001 8:52:33 AM
|
FIRE-Final Inspection | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 09:13:16. Contact: ###-####.
|
Plan resubmittals received | | | 5/11/2000 | | DONE |
|
|
|
RECEIVED ONE COPIY OF REVISED SHEETS S5, S6 ROUTED TO JIM STOREY. KMM
|
BLD-Footing | 5/8/2000 | 5/9/2000 | 5/9/2000 | A | PASS |
Jim Storey
|
|
|
mark ###-#### ft for trash encloseres. 5/9/00 7:31:51 AM
|
BLD-Concrete | 5/5/2000 | 5/8/2000 | 5/8/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 13:29:36. Contact: ###-####. pending report and final sign off. 5/8/00 10:58:22 AM
|
BLD-Concrete | 5/3/2000 | 5/3/2000 | 5/3/2000 | P | PART |
Jim Storey
|
|
|
WALL\\###-#### pending report from special insp. 5/4/00 11:05:59 AM
|
BLD-Footing | 4/28/2000 | 5/1/2000 | 5/1/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/28/2000 at 11:55:18. Contact: ###-####. pending special insp. report place on sat. 5/1/00 9:08:42 AM
|
BLD-Footing | 4/26/2000 | 4/27/2000 | 4/27/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/26/2000 at 12:13:57. Contact: ###-####. ok pending report. 4/27/00 2:26:39 PM engineer stlaply to approve 4 to 5 yrd 2 inch drain rocl under footing of retaining wall. desiged by cival engineer. 4/27/00 4:10:12 PM
|
BLD-Footing | 4/25/2000 | 4/26/2000 | 4/26/2000 | P | CANC |
Jim Storey
|
|
|
###-#### mark called and canclled via phone. 4/26/00 12:11:09 PM
|
BLD-Footing | 4/24/2000 | 4/25/2000 | 4/25/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 15:17:08. Contact: ###-####. rebar ok pending special insp. report. 4/25/00 9:29:23 AM
|
BLD-Footing | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | PART |
Russ Owen
|
|
|
###-#### Work requires special inspection, and I am not able (Time Wise) to do this inspection today. 4/21/00 1:52:58 PM
|
Plan resubmittals received | | | 1/19/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS, ONE SET OF LANDSCAPE PLANS FROM THE DAKOTA COMPANY, FORWARDED PLANS TO MIKE HALL FOR REVIEW. 1/19/00 DAR
|
BLD-Foundation | 12/13/1999 | 12/14/1999 | 12/14/1999 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/13/1999 at 13:05:08. Contact: . Placed w/special insp. Pend. Report covered for weather protection.
|
BLD-Footing | 12/7/1999 | 12/8/1999 | 12/8/1999 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/07/1999 at 15:26:37. Contact: . Subject to special inspection.
|
BLD-Foundation | 12/3/1999 | 12/6/1999 | 12/6/1999 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 15:43:28. Contact: . Placed w/special insp. Pend report.
|
BLD-Foundation | 11/30/1999 | 12/1/1999 | 12/1/1999 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/30/1999 at 08:10:45. Contact: . Placed w/spec. insp. Pending report.
|
BLD-Foundation | 11/16/1999 | 11/17/1999 | 11/17/1999 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/16/1999 at 08:24:19. Contact: . Placed w/special insp. Pending report.
|
BLD-Foundation | 11/8/1999 | 11/9/1999 | 11/9/1999 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/08/1999 at 15:30:35. Contact: . Pend. SP/I report.
|
BLD-Footing | 11/3/1999 | 11/3/1999 | 11/3/1999 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 11/03/1999 at 07:41:18. Contact: . All but 2 poured w/o city insp.
|
BLD-Footing | 10/28/1999 | 10/29/1999 | 10/29/1999 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/28/1999 at 12:46:09. Contact: . West ft. ok
|
FIRE-Supply Line Cover | 10/25/1999 | 10/26/1999 | 10/26/1999 | A | PART |
Rick Jackson
|
|
|
###-#### partially installed- not complete
|
Print Occupancy Form | | | 9/14/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/14/1999 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/14/1999 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 9/10/1999 | 9/10/1999 | 9/13/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/13/1999 | | PASS |
Dave Radford
|
|
|
|
Plan assigned to (DAR) | 7/21/1999 | | 9/13/1999 | | PASS |
|
|
|
9/13/99 14:51:39 DAR - activity updated through activity BLDA022 from case BLD99-02195.
|
Routing - FIRE | 9/8/1999 | 9/8/1999 | 9/8/1999 | | PASS |
|
|
|
Must provide revisions to the drawings as noted in the review.
|
Plan Reviewer's activity | | | 9/7/1999 | | PASS |
|
|
|
REVIEWED AND APPROVED STRUCTURAL PLANS AND CALCULATIONS FOR THE PROPOSED CONCRETE RETAINING WALLS.
|
Routing - FIRE | 8/11/1999 | | 8/13/1999 | | FAIL |
|
|
|
Hydrant spacing exceeds fire department allowances. Need flows future building types to calculate for flows and need flows available from United Water. Has 2 site access problems with fire apparatus access.
|
Plan Review Completed(1st rev) | | | 8/13/1999 | | FAIL |
|
|
|
|
Routing - PLANNING | 8/3/1999 | | 8/11/1999 | | PASS |
|
|
|
Approved per DRH98-0239 for grading and drainage only. Landscaping requirements have not been met per DR approval. Final P & Z approval for the grading and drainage permit must be signed off by Conditional Use Permit analyst (Mike Hall). Approved per cup98-99 by M. Hall.
|
Routing - PLUMBING | 7/30/1999 | | 8/3/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/22/1999 | | 7/29/1999 | | FAIL |
|
|
|
Failed - attention Bill Colson.
|
Plans ACCEPTED BY PLAN TECH | | | 7/23/1999 | | HOLD |
|
|
|
Irrigation plans stamped not for construction. Notified Quadrant DAR 7/21/99
|
Plans ACCEPTED BY PLAN TECH | 7/21/1999 | | 7/21/1999 | | HOLD |
|
|
|
|
Application received | | | 7/20/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 9/8/1999 | 9/8/1999 | | | PEND |
|
|
|
|
Print Occupancy Form | | | | | |
|
|
|
|
Print Occupancy Form | | | | | |
|
|
|
|
Routing - PLAN CHECK | 8/13/1999 | | | | |
|
|
|
|