Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02200
StatusFinaled
Name RUMSEY HAROLD E
Site Address 1413 N LIBERTY ST
Project NameASPEN APARTMENTS
Customer Number 
ePlanReviewNo
Description
UNIT TYPE "A-2" * TO CONSTRUCT A NEW 2,838 SQ,FT. TWO STORY, WOOD FRAMED TYPE V NONRATED, FOUR UNIT APARTMENT BUILDING. THERE ARE TWO TYPE A UNITS ON THE FIRST FLOOR AT 710 SQ.FT. EACH AND TWO TYPE A UNITS ON THE SECOND FLOOR AT 710 SQ.FT. EACH. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A17.1 AND THE 1997 EDITION OF THE UBC. PERMIT TO INCLUDE ON SITE PARKING AND LANSCAPING. MJP DRH99-0064 CUP99-0042 PC#
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/18/20036/18/20036/18/2003 DONE
Permanent occupancy  12/18/2000 DONE
Perm. Occ. Cert. #8510 issued 12-18-00 to the Aspen Apts.
BLD-Final12/15/200012/15/200012/15/2000PPASS
DetailsTom Arcoraci
DON -- ###-#### FN OCC ok for perm 12/15/2000 3:54:10 PM
Permanent Occupancy 12/15/200012/15/2000 DONE
Details
FIRE-Final Inspection10/30/200010/31/200010/31/2000APASS
DetailsJoe Tawney
Don ###-#### Final OK for permanant occupancy 10/31/2000 12:35:06 PM
BLD-Final10/31/200010/31/200010/31/2000PPART
DetailsCarl Dependahl
###-####, need other sigs, ok t/o 408 10/31/2000 5:13:24 PM
(F) Reprint permit  9/14/2000 DONE
Inspection Record Card- Bld  9/14/2000 DONE
Print Occupancy Form  9/14/2000 DONE
(F) Reprint permit  9/14/2000 DONE
BLD-Framing/Rough-in9/7/20009/8/20009/8/2000PPART
DetailsTom Arcoraci
Don ###-#### cn ok per 340 9/8/2000 12:30:26 PM
BLD-Framing/Rough-in9/5/20009/5/20009/5/2000PPART
DetailsCarl Dependahl
don ###-#### shear and a framing; int at 1st fl ok' need vapor barrier at 2nd fl 9/5/2000 2:39:13 PM 9/5/2000 2:40:02 PM
BLD-Framing/Rough-in8/31/20009/1/20009/1/2000ACANC
DetailsJim Storey
don ###-#### fr will resch. for tue . 9/1/2000 11:18:21 AM
BLD-Framing/Rough-in8/29/20008/30/20008/30/2000AFAIL
DetailsCarl Dependahl
don ###-####; renail common walls at 2nd fl; recall 8/30/2000 9:53:37 AM
BLD-Framing/Rough-in8/28/20008/28/20008/28/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 8/28/2000 int gyp exc at stairs
BLD-Wall cover8/24/20008/25/20008/25/2000APART
DetailsCarl Dependahl
Added by Inspector: 340 On 8/24/2000 GYPSUM NAILING
BLD-Framing/Rough-in8/23/20008/23/20008/23/2000PPART
DetailsCarl Dependahl
shear wall ###-####; ok to cover int shear ok, need gyp insp 8/23/2000 11:53:07 AM
BLD-Framing/Rough-in8/22/20008/22/20008/22/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/22/2000 at 07:09:20. Contact: ###-####. ok to cover, need insp for rated drywall nailing. 8/22/2000 9:43:28 AM
BLD-Framing/Rough-in8/17/20008/18/20008/18/2000APART
DetailsCarl Dependahl
shear Don ###-####; 1st fl ok 8/18/2000 8:48:52 AM
BLD-Framing/Rough-in8/17/20008/17/20008/17/2000PNR
DetailsCarl Dependahl
shear Don ###-####
BLD-Foundation6/15/20006/16/20006/16/2000APART
DetailsTom Arcoraci
###-#### HD's not in place 6/16/00 2:15:49 PM
BLD-Footing6/14/20006/15/20006/15/2000PPASS
DetailsTom Arcoraci
###-####
Issue PAID IN FULL permit  6/7/2000 DONE
Routing - PLAN CHECK3/17/2000 3/29/2000  
Plan Reviewer's activity  3/29/2000 DONE
Print Pending Permit.LaserJet4  3/29/2000 DONE
Case Summary (BLD)  3/29/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/29/2000 DONE
Inspection Record Card- Bld  3/29/2000 DONE
Print Occupancy Form  3/29/2000 DONE
Plan assigned to (M_P)7/21/1999 3/29/2000 PASS
DetailsMike Phillips
3/29/2000 12:02:04 M_P - activity updated through activity BLDA022 from case BLD99-02200.
Routing - PLANNING3/10/2000 3/17/2000 PASS
DetailsTom Curren
Approved as per revised site plan and parking plan sukbmitted 3/16/00. As per CUP99-00142
Routing - PLAN CHECK3/6/2000 3/10/2000  
Routing to P & Z for parking modification.
Routing - PLUMBING3/3/2000 3/6/2000 DONE
Routing - PLAN CHECK3/3/2000 3/3/2000 PEND
Routing - PUBLIC WORKS3/2/2000 3/3/2000 PEND
Plan resubmittals received  2/29/2000 DONE
resubmittals received from tamura.
Routing - FIRE12/20/199912/28/199912/28/1999 PASS
Plan Review Completed(1st rev)  12/28/1999  
Plan resubmittals requested  12/18/1999 FAIL
ADDITIONAL INFORMATION REQUESTED FOR A FOLLOW UP REVIEW.
Print Pending Permit.LaserJet4  12/18/1999 FAIL
ADDITIONAL INFORMATION REQUIRED TO BE SUBMITTED FOR FURTHER REVIEW.
Routing - PLAN CHECK10/1/1999 12/18/1999  
ROUTING TO FIRE DEPARTMENT FOR REVIEW
Plan resubmittals requested  10/25/1999 FAIL
Called and requested additional engineering to be submitted prior to completeing my review.
Routing - PUBLIC WORKS9/28/19999/28/199910/1/1999 FAIL
REQUIRES DRAINAGE PLAN. PER BRIAN M. KMM
Plan resubmittals received  9/28/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM MARK SANDERS, FORWARDED SAME TO MIKE PHILLIPS. 9/28/99 DAR
Routing - PLAN CHECK8/12/1999 8/20/1999 HOLD
Waiting for new plans to be submitted.
Plan resubmittals requested  8/20/1999 FAIL
Sent submittal letter requesting revised plans.
Routing - PLANNING8/5/1999 8/12/1999 PASS
Developer must provide 3 bicycle spaces and 2 handicapped parking spaces. Building construction must comply with 1993 Boise City Energy Code TAC
Routing - PLUMBING7/28/1999 8/5/1999 PASS
4 plex doesnt need review
Routing - PLAN CHECK8/5/1999 8/5/1999
Routing to planning
Routing - PUBLIC WORKS7/23/1999 7/28/1999
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. 7/28/99 DAR
Application received  7/21/1999
Plan Reviewer's activity  7/21/1999
APPLICATION RECEIVED.