BLD-Final | 3/3/2000 | 3/6/2000 | 3/6/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/03/2000 at 14:40:47. Contact: ###-####.
|
BLD-Grading Inspection | 3/2/2000 | 3/2/2000 | 3/2/2000 | | BOND |
Rita DeYoung
|
|
|
Grading has been significantly revised and will require a Hillside Development application. To ensure that the originally approved grading can be constructed the engineer has recommended a $3000.00 bond. Upon receipt of this the grading is conditionally approved.
|
BLD-Final | 3/1/2000 | 3/1/2000 | 3/2/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### Needs temp. glass and egress ladder. 3/2/00 10:35:27 AM
|
BLD-Energy code compliance | 12/9/1999 | 12/9/1999 | 12/9/1999 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 08:29:15. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 09:01:22. Contact: ###-####. C/C truss engineering @ energy.
|
BLD-Framing/Rough-in | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | FAIL |
|
|
|
JOHN-- ###-#### SHEAR NAIL Hold downs nailed w/3d box eng. Must sign-off hold downs & his eng. Req. (all).
|
BLD-Foundation | 9/16/1999 | 9/17/1999 | 9/17/1999 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Foundation | 8/27/1999 | 8/27/1999 | 8/27/1999 | | PART |
Wes Worcester
|
|
|
/ / 342 - basement wall ok
|
INSP - Foundation | 8/26/1999 | 8/26/1999 | 8/26/1999 | P | FAIL |
Wes Worcester
|
|
|
08/26/99 342 - RYAN ###-#### not ready
|
INSP - Foundation | 8/24/1999 | 8/25/1999 | 8/25/1999 | A | PART |
Tom Arcoraci
|
|
|
08/25/99 408 - basement ft ok only
|
Issue PAID IN FULL permit | | | 8/19/1999 | | |
|
|
|
|
Telephone call | | | 8/19/1999 | | |
|
|
|
called permit ready
|
Print Occupancy Form | | | 8/19/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/19/1999 | | |
|
|
|
|
Plan assigned to (DJO) | 7/27/1999 | | 8/18/1999 | | PASS |
Dan Overy
|
|
|
08/18/99 15:06:16 DJO - this action updated by action script from <<>> in Case No. BLD99-2274
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/18/1999 | | PASS |
|
|
|
ok to issue per terry records 08-18-99
|
Routing - PUBLIC WORKS GRADING | 8/18/1999 | | 8/18/1999 | | PASS |
Rita DeYoung
|
|
|
Additional information submitted to approve seepage bed.
|
Plan Reviewer's activity | | | 8/16/1999 | | PEND |
|
|
|
spoke with darren from pinnacle. explanation being faxed on lateral at rear of structure. terry records is still waiting for seepage pit information. house below this lot may be affected.
|
Print Pending Permit.LaserJet4 | | | 8/16/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/12/1999 | | PEND |
|
|
|
HAVE TALKED WITH DESIGNER AND TRUSS MANUFACTURER ABOUT ROOF FRAMING AND SCHEDULES INDICATED ON PLANS. ROOF FRAMING OK AS EXPLAINED. SCHEDULES WERE NOT TRANSPOSED TO PLANS THAT WERE SUBMITTED. DESIGNER LEFT RED-LINED ENGINEERS SET OF PLANS. STILL REQUIRE EXPLANATION FROM ENGINEER IN WRITING ABOUT LATERAL AT REAR OF STRUCTURE.
|
Plans ACCEPTED BY PLAN CHECK | | | 8/11/1999 | | PEND |
|
|
|
|
Routing - PLANNING | 7/28/1999 | | 7/29/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/27/1999 | | 7/28/1999 | | PASS |
|
|
|
terry records has plans 7/27/99 terry and dan o accepted.
|
Routing - PUBLIC WORKS GRADING | 7/28/1999 | | 7/28/1999 | | PEND |
Rita DeYoung
|
|
|
I have approved the grading plan but have reserved final approval until I receive additional information from a geotechnical engineer approving the seepage bed. Please forward to Building Dept Plan check, but do not issue a building permit until I have approved.
|
Application received | | | 7/27/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 7/29/1999 | | | | PEND |
|
|
|
|