Permit Information
Permit NumberBLD99-02330
StatusFinaled
Name STEVE EDDY'S / CHEVRON
Site Address 9804 W FAIRVIEW AVE
Project NameCHEVRON/MCDONALD'S
Customer Number 
ePlanReviewNo
Description
CHEVRON/MCDONALD'S PHASE I * TO CONSTRUCT A NEW 5,775 SQ.FT. CHEVRON C-STORE/MCDONALD'S RESTAURANT WITH DRIVE-THRU IN SINGLE STORY, WOOD FRAMED, TYPE V NONRATED STRUCTURE. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. ADDITIONAL PERMITS FOR THIS PROJECT INCLUDE THE DETACHED CARWASH UNDER PERMIT BLD99-2446 GAS ISLAND CANOPY UNDER PERMIT BLD99-2444 . THIS PERMIT IS TO INCLUDE ALL SITE WORK FOR C-STORE, CARWASH, AND GAS ISLAND CANOPY, AS WELL AS THE FUTURE OFFICE SITE DEVELOPMENT. THE OFFICE WILL BE PERMITED UNDER BLD99-2399. DRH99-0017 CUP99-0009 PC#620-99 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/18/20036/18/20036/18/2003 DONE
Permanent occupancy  10/4/2000 DONE
Perm. Occ. Cert. #8426 issued 10-4-00 to Chevron/McDonald's.
Permanent Occupancy 10/3/200010/3/2000 DONE
Details
Fee Review-notes8/9/1999 7/25/2000 DONE
LINDA THIS PERMIT WAS SUBMITTED AS ONE, WITH ONE VALUE. THERE ARE THREE SEPARATE PROJECTS. (CARWASH, GAS ISLAND CANOPY, AND CHEVRON/MCDONALD'S BUILDING) THEY HAVE BEEN INSTRUCTED TO SEPARATE OUT INTO THREE PERMITS. I HAVE ASKED FOR A REVISED CERT. FOR THE BUILDING AND NEW CERTS. FOR THE CARWASH AND GAS ISLAND CANOPY, SO THAT I MAY START SEPARATE PERMITS FOR THEM. KMM 8-13-99 I RECEIVED REVISED CERT. OF VALUE AND CERT. OF VALUES FOR THE GAS ISLAND CANOPY, AND CARWASH.
Fee Review-notes7/30/1999 7/25/2000 DONE
FIRE-Final Inspection7/21/20007/24/20007/24/2000APASS
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/21/2000 at 14:57:55. Contact: ###-####. Reinsp. ok for permt. occ 7/24/00 1:23:03 PM
Temporary occupancy  7/24/2000 PART
Temp. Occ. Cert. #4042 issued 7-24-00 to Chevron/McDonald's for a restaurant and C-Store.
Code Occupancy Approval  7/24/2000 PASS
Meets compliance with cup 99-0009 and drh 99-00117
BLD-Final7/21/20007/21/20007/21/2000PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/21/2000 at 07:17:29. Contact: ###-####. Ok for temp. ok for final after others sign perm. 7/24/00 12:58:52 PM
FIRE-Final Inspection7/19/20007/20/20007/20/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/19/2000 at 13:02:52. Contact: ###-####. Final fail C/N issued. 7/21/00 9:13:38 AM
BLD-Other7/17/20007/18/20007/18/2000APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/17/2000 at 14:39:40. Contact: ###-####. Grid in kit ok 7/18/00 2:45:56 PM
BLD-Other7/12/20007/13/20007/13/2000ACANC
Details
Scheduled by a contractor via Hello! on 07/12/2000 at 14:53:03. Contact: ###-####. done by 301 7/13/2000 8:08:48 PM
BLD-Framing/Rough-in5/23/20005/23/20005/23/2000PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/23/2000 at 09:55:47. Contact: ###-####. Ok to cover, CK for draft stop. 5/24/00 11:13:43 AM
BLD-Other5/9/20005/9/20005/9/2000PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/09/2000 at 09:35:22. Contact: ###-####.
BLD-Other5/8/20005/8/20005/8/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/08/2000 at 09:33:09. Contact: ###-####. need access to roof & TS frames & col's req. spec. insp. (approved fab?) 5/9/00 11:30:09 AM
BLD-Other4/28/20005/1/20005/1/2000APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/28/2000 at 14:55:02. Contact: ###-####. WIP ok to cover roof over hang.
BLD-Other4/20/20004/20/20004/20/2000PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/20/2000 at 11:28:00. Contact: ###-####. ok to install freezer over HD's. 4/21/00 9:15:42 AM
BLD-Other4/14/20004/14/20004/14/2000APART
DetailsCarl Dependahl
Masonry ok
BLD-Other4/7/20004/10/20004/10/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/07/2000 at 15:06:12. Contact: . Masonry @ "corral"- hi-lift ok, 4/11/00 10:48:27 AM
FIRE-Supply Line Cover4/6/20004/6/20004/6/2000PPART
DetailsJoe Tawney
tom ###-#### ok to cover final part of supply line 4/7/00 8:59:32 AM
FIRE-Supply Line Cover4/4/20004/5/20004/5/2000APART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 04/04/2000 at 11:58:59. Contact: . Ok to cover supply line 4/6/00 8:49:47 AM
BLD-Footing3/20/20003/20/20003/20/2000PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/20/2000 at 08:27:03. Contact: ###-####. See C/N 3/21/00 9:31:19 AM
BLD-Footing3/15/20003/16/20003/16/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/15/2000 at 15:21:42. Contact: ###-####. Spec. insp for 3000 psi. 3/16/00 1:46:17 PM
(F) Reprint permit  12/6/1999 DONE
Issue PAID IN FULL permit  12/3/1999 DONE
Routing - PLAN CHECK10/27/199910/27/199911/9/1999 DONE
Plan Reviewer's activity  11/9/1999 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/9/1999 DONE
Print Pending Permit.LaserJet4  11/9/1999 DONE
Case Summary (BLD)  11/9/1999 DONE
Print Occupancy Form  11/9/1999 DONE
Inspection Record Card- Bld  11/9/1999 DONE
Telephone call  11/9/1999 DONE
called Mike Baker and faxed him the permit fees at ###-####
Plan assigned to (M_P)8/9/1999 11/9/1999 PASS
DetailsMike Phillips
11/9/1999 11:49:54 M_P - activity updated through activity BLDA022 from case BLD99-02330.
Plan resubmittals received  11/4/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM BRS ARCHITECTS, FORWARDED SAME TO MIKE PHILLIPS. 11/5/99 DAR
Plan Reviewer's activity  10/28/1999 FAIL
Faxed structural review comments to architect. Prior comments faxed to Reese on 89/14/99 were not answered and submitted with resubmittals dated 10/18/99.
Routing - PUBLIC WORKS10/26/199910/26/199910/27/1999 PASS
Routing - PLAN CHECK10/5/199910/5/199910/26/1999  
Routed to P.W.
Plan resubmittals received  10/18/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM BRS ARCHITECTS, FORWARDED SAME TO MIKE PHILLIPS. 10/18/99 DAR
Routing - FIRE10/1/199910/4/199910/4/1999 PASS
Plan Review Completed(1st rev)  10/4/1999 PEND
Routing - PLAN CHECK9/15/19999/15/199910/1/1999 FAIL
Plan resubmittals requested  10/1/1999 FAIL
Print Pending Permit.LaserJet4  10/1/1999 FAIL
Case Summary (BLD)  9/17/1999 DONE
Routing - PUBLIC WORKS9/14/19999/14/19999/15/1999 FAIL
REQUIRES DRAINAGE PLAN REVISIONS PER BRIAN MURPHY. 9/15/99 DAR
Routing - PLAN CHECK9/3/1999 9/14/1999
Routing to P.W. for follow up review.
Plan resubmittals received  9/13/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM ROGER FOSTER, BRS ARCHITECTS, FORWARDED SAME TO MIKE PHILLIPS. 9/14/99 DAR
Received Civil Drawoing and routing to P.W. 9/14/99 MJP
Routing Off Site - STRUCTURAL8/13/1999 9/9/1999 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Additional information required to be submitted for further review. Plan reviewer will do follow up review. Faxed comments to Architect. 09/14/99 MJP
Routing - PLANNING8/30/1999 9/3/1999 PASS
approved per DRH99-0017.
Routing - PLAN CHECK8/25/1999 8/30/1999
Routing - PLUMBING8/24/1999 8/25/1999 PASS
Routing - PLANNING8/18/1999 8/20/1999 PEND
Approved pending Design Review approval (SAR)
Plans ACCEPTED BY PLAN TECH  8/18/1999 PASS
Routing - PUBLIC WORKS8/13/1999 8/17/1999 FAIL
REQUIRES DRAINAGE PLAN REVISIONS, PER BRIAN MURPHY. KMM
Plans ACCEPTED BY PLAN TECH  8/13/1999 PASS
Plan routing begun/NEW & ADDTN  8/13/1999 PASS
Plan assigned to (MYS)7/30/1999 8/9/1999
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  8/9/1999 PEND
REQUIRES THREE ADDITIONAL CIVIL SHEETS C-1 THRU C-6, PLUS CALCS. TWO COPIES OF STAMPED AND SIGNED SHEET SD-3 FOR TRASH ENCLOSURE. ALSO WILL SEPARATE OUT PERMITS FOR THE CARWASH, AND GAS ISLAND CANOPY, HOWEVER WE WILL USE THE SAME SET OF PLANS. CONTACTED ROGER FOSTER AND MIKE BAKER OF THESE NEEDS. I WANTED MIKE TO BE AWARE OF THE IMPORTANCE OF SEPARATE CO'S FOR EACH BUILDING. THIS WILL ONLY HAPPEN WITH SEPARATE PERMITS FOR EACH BUILDING. KMM 8-10-99 RECEIVED THREE ADDITIONAL CIVIL SHEETS WITH CALCS. KMM 8-18-99 RECEIVED ADD. STAMPED AND SIGNED SD3 SHEETS. ROUTED ONE TO OUTSIDE ENG. VIA PDQ. THE OTHER TWO COPIES WITH THE PLANS. KMM
Plan routing begun/NEW & ADDTN  8/9/1999 PEND
WAITING APPLICATIONS FOR THE CANOPY AND CARWASH, AS WELL AS REVISED CERT. OF VALUE FOR THE CHEVRON/MCDONALD'S BUILDING. KMM 8-13-99 RECEIVED THE ABOVE MENTIONED ITEMS. HOWEVER I AM STILL WAITING FOR THREE COPIES OF STAMPED AND SIGNED SHEET SD3. KMM
Received Certificate of Value  8/9/1999 FAIL
NEEDS TO REVISE FOR BUILDING ONLY, AND SUBMIT FOR CARWASH ONLY, AND GAS ISLAND CANOPY ONLY. CONTACTED MIKE BAKER AND ROGER FOSTER OF THESE NEEDS. KMM
Recd Pcfee & Taken To Pln CK  7/30/1999
Application received  7/30/1999
Routing Off Site - C.D.H7/30/1999 7/30/1999 PASS