Fee Review-notes | 6/18/2003 | 6/18/2003 | 6/18/2003 | | DONE |
|
|
|
|
Fee Review-notes | 8/9/1999 | | 7/24/2000 | | DONE |
|
|
|
additional value from subs 8/2-TI called about statement-they will fax to owner Brighten corp. lh
|
Permanent occupancy | | | 1/24/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8099 issued 1-24-00 to Carollo Engineers.
|
BLD-Final | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
Permanent Occupancy | | 1/13/2000 | 1/13/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/10/2000 | 1/10/2000 | 1/10/2000 | P | PASS |
Joe Tawney
|
|
|
###-#### gene. Reinsp. Of for perm. Occ.
|
FIRE-Final Inspection | 12/22/1999 | 12/23/1999 | 12/23/1999 | A | FAIL |
Joe Tawney
|
|
|
###-####. Reinsp. fail shell not signed off.
|
BLD-Final | 12/22/1999 | 12/23/1999 | 12/23/1999 | P | FAIL |
Tom Arcoraci
|
|
|
gene###-####. Not ready.
|
BLD-Final | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | FAIL |
|
|
|
c/n issued (1) OCCUPIED W/O APPROVALS (2) smoke seals and latches must work at all corridor doors. (3) need fire inspector signoff. Gene ###-####
|
FIRE-Final Inspection | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | FAIL |
Joe Tawney
|
|
|
gene ###-#### fn fire- Reinsp. Fail, fire ext. suite numbers.
|
BLD-Final | 12/9/1999 | 12/10/1999 | 12/10/1999 | P | FAIL |
Jim Sly
|
|
|
gene ###-#### fn occ Not ready.
|
Print Occupancy Form | | | 12/6/1999 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | FAIL |
Joe Tawney
|
|
|
Gene ###-#### Final fail C/N issued.
|
BLD-Final | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | FAIL |
Jim Sly
|
|
|
TEMP OCC JENE ###-#### Not ready.
|
BLD-Framing/Rough-in | 11/23/1999 | 11/24/1999 | 11/24/1999 | A | PASS |
Jim Sly
|
|
|
gene ###-####
|
BLD-Framing/Rough-in | 11/17/1999 | 11/18/1999 | 11/18/1999 | A | PART |
Jim Sly
|
|
|
ceiling grid sizemic jene ###-#### Ceiling grid.
|
BLD-Framing/Rough-in | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | PASS |
Jim Sly
|
|
|
gene-- ###-#### fr insp
|
BLD-Framing/Rough-in | 10/19/1999 | 10/19/1999 | 10/19/1999 | P | PART |
Jim Sly
|
|
|
Jene ###-#### Framing appears ok
|
BLD-Framing/Rough-in | 10/11/1999 | 10/12/1999 | 10/12/1999 | A | PART |
Jim Sly
|
|
|
JENE--- ###-#### FR INSP pre inspection walk thru (frame)
|
Issue PAID IN FULL permit | | | 10/11/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/8/1999 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/8/1999 | | DONE |
|
|
|
|
Telephone call | | | 10/8/1999 | | DONE |
|
|
|
Called Wes ###-####
|
Routing - PLAN CHECK | 10/7/1999 | 10/7/1999 | 10/7/1999 | | PASS |
|
|
|
PLANS APPROVED AS NOTED AND ATTACHED. PROCESSING FOR ISSUANCE OF PERMIT.
|
Case Summary (BLD) | | | 10/7/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/1999 | | PASS |
|
|
|
PROCESSING FOR ISSUANCE FOR PERMIT. APPROVED AS NOTED AND ATTACHED.
|
Telephone call | | | 10/7/1999 | | FAIL |
|
|
|
TALKED WITH WES OF HABITEC ON THE PHONE TO REVIEW THE SHEETS AND INCORRECT INFORMATION. WES WILL SUBMITT NEW DETAILS.
|
Plan resubmittals received | | | 10/7/1999 | | PASS |
|
|
|
RECEIVED FAZED DETAILS FROM WES. INSERTED INTO PLANS AND RED-LINED PLAN DETAILS FOR CONFORMANCE WITH CODE.
|
Plan assigned to (DRS) | 8/11/1999 | | 10/7/1999 | | PASS |
Dan Stuart
|
|
|
10/7/1999 20:00:26 DRS - activity updated through activity BLDA022 from case BLD99-02398.
|
Plan resubmittals requested | | | 10/6/1999 | | FAIL |
|
|
|
RE-SUBMITTALS FROM ARCHITECT DID NOT ADDRESS THE INFORMATION REQUESTED FOR CORRECTION OF DETAILS ON SHEET A3 FOR SUSPENDED CEILING SYSTEM AND USE OF WOOD IN TYPE II-N CONSTRUCTION. THE BRACING DETAILS B PROVIDED WERE NOT IN AGREEMENT WITH ENGINEERING SUPPLIED FOR WALL BRACING.
|
Plan resubmittals received | | | 9/30/1999 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A1, AND A3. ONE COPY OF RESPONSE LETTER AND BRACING DESIGN, AND ANGELSES METAL SYSTEMS . ROUTED TO DAN STUART. KMM
|
Routing - FIRE | 9/7/1999 | 9/9/1999 | 9/7/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 9/7/1999 | | PEND |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/3/1999 | | |
|
|
|
|
Routing - PUBLIC WORKS | 8/11/1999 | | 8/11/1999 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 8/11/1999 | | |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Plan assigned to (MYS) | 8/9/1999 | | 8/11/1999 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/10/1999 | | PASS |
|
|
|
|
Received Certificate of Value | | | 8/9/1999 | | PASS |
|
|
|
|
Application received | | | 8/9/1999 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/9/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 9/8/1999 | 9/8/1999 | | | |
|
|
|
|
Routing - PLAN CHECK | 9/3/1999 | | | | FAIL |
|
|
|
Picked up plan to begin review. Preliminary plan review comments to architect. Plan resubmittals required. Plans forwarded to fire code analysis for review.
|