Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD99-02416
StatusFinaled
Name JEFF IVERSON
Site Address 1555 S BROADWAY AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
PHASE II (SHELL AND FINISH) PERMIT. Demolishing all of structure except Northwest corner under separate permit BLD99-02156 (existing kitchen, portion of cookline, and one banquet room to remain). This permit is Phase II of construction which includes reconstructing building to a total of 8,049 sq.ft. for use as an assembly occupancy restaurant with dining and drinking per approved plans on file. Restrooms will need to be reconstructed to comply with current accessibility standards. Work to include new footings, foundation and slab, new exterior walls including a portion of the north wall required to be two-hour fire rated with parapet, exterior doors and windows, new roof framing and roof covering, exterior veneer, new interior walls and doors, some suspended ceiling work, finish work, install new walk-in cooler, new exterior landings, stairs, accessible ramp, and sidewalk work at exit doors, installing a new Type I Hood with one-hour fire rated shaft, fire sprinklers, mechanical, plumbing, and electrical work. PHASE I (FOUNDATION) ISSUED UNDER BLD99-02867 . NOTE: This building is fully fire sprinklered for area increase. (P.C.#632-99) DRH99-0134 JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/18/20036/18/20036/18/2003 DONE
Additional values from subcontractors.
Fee Review-notes8/10/1999 7/21/2000 DONE
need final certs for all of the phases of this project
Permanent occupancy  3/7/2000 DONE
Perm. Occ. Cert. #8150 issued 3-7-00 to Murphy's Restaurant.
BLD-Final3/3/20003/6/20003/6/2000APASS
DetailsJim Storey
mike ###-#### fn occ Final ok. 3/6/00 1:47:58 PM
Permanent Occupancy 3/6/20003/6/2000 DONE
Details
FIRE-Final Inspection2/22/20002/23/20002/23/2000APASS
DetailsRick Jackson
Final reinspect - Murphy's
Code Occupancy Approval  2/17/2000 PASS
ALL CONDITIONS HAVE BEEN MET PER DRH99-00134, FINAL OCCUPANCY SIGNED OFF AND RELEASE OF BOND ALSO SIGNED OFF.
BLD-Final2/4/20002/4/20002/4/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/04/2000 at 07:50:35. Contact: ###-####. Ok for temp.
Temporary occupancy  2/4/2000 DONE
Temp. Occ. Cert #3973 issued 2-4-00 to Murphy's.
FIRE-Alarm Testing2/1/20002/2/20002/3/2000APASS
DetailsRick Jackson
alarms tested okay
BLD-Final2/1/20002/2/20002/2/2000PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/01/2000 at 17:42:21. Contact: ###-####. saftey glazing must be labled handrail from cook space to a-3 area 2/3/00 8:10:55 AM
FIRE-Final Inspection2/2/20002/2/20002/2/2000PPART
DetailsRick Jackson
temp approved pending assembly permit
Code Occupancy Approval  2/2/2000 PASS
SOME TREES NOT IN AND GROUND COVER, PARKING LOT NEEDS REMARKED, BONDED FOR $9534, BOND RECEIVED 2-1-00 4:30 PM.

TEMP SIGNED OFF 2-2-00
BLD-Other1/31/20002/1/20002/1/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/31/2000 at 14:25:44. Contact: ###-####.
FIRE-Alarm Testing1/31/20002/1/20002/1/2000PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/31/2000 at 15:04:24. Contact: ###-####. c\n issued 2/3/00 7:49:48 AM
BLD-Other1/25/20001/25/20001/25/2000PPART
Details
Scheduled by a contractor via Hello! on 01/25/2000 at 07:56:51. Contact: ###-####. made ok to drop in ceiling tiles 1/26/00 8:18:05 AM
BLD-Conference1/9/20001/10/20001/10/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/09/2000 at 11:58:46. Contact: ###-####. Shaft ok class I.
Plan resubmittals received  12/29/1999 DONE
RECEIVED PLAN RESUBMITTALS VIA STEED CONSTRUCTIONFROM NELSEN ARCHITECTS, INC. FORWARDED SAME TO JIM STORY.12/29/99 DAR
BLD-Conference12/17/199912/20/199912/20/1999PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/17/1999 at 15:03:40. Contact: ###-####. Submittals req.
BLD-Framing/Rough-in12/12/199912/13/199912/13/1999ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/12/1999 at 20:18:36. Contact: ###-####. Wanted to meet with Jim S.
FIRE-Sprinkler Rough-in12/9/199912/10/199912/10/1999APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/09/1999 at 11:56:11. Contact: ###-####. Okay to cover south side up wall addition
BLD-Conference12/10/199912/10/199912/10/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/10/1999 at 08:47:24. Contact: ###-####. Frame ok/ received engineer letter ceiling load ok.
BLD-Framing/Rough-in12/7/199912/8/199912/8/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/07/1999 at 16:38:18. Contact: ###-####. Truss eng. To provide bottom chord loading.
FIRE-Conference12/6/199912/6/199912/6/1999PPART
DetailsRick Jackson
Left C/N for exsisting ducts as requirements to meet UMC.
FIRE-Conference12/6/199912/6/199912/6/1999PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/06/1999 at 08:38:16. Contact: ###-####. Conf.
BLD-Framing/Rough-in12/1/199912/1/199912/1/1999PPART
DetailsJim Storey
fire wall bryan ###-#### First layer 2hr wall gyp. Ok P/L wall/North.
BLD-Framing/Rough-in11/22/199911/23/199911/23/1999APART
DetailsJim Storey
sheer nailing Brian ###-#### Exterior shear nailing ok all but 2hr. North wall.
BLD-Framing/Rough-in11/19/199911/22/199911/22/1999AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/19/1999 at 09:32:39. Contact: ###-####. N/R.
BLD-Framing/Rough-in11/17/199911/18/199911/18/1999APART
DetailsJim Storey
ROOF NAILING BRYAN ###-#### Roof nail ok on barrel truss & beam perlin framing.
BLD-Framing/Rough-in11/10/199911/10/199911/10/1999PPART
DetailsJim Storey
BRIAN ###-#### PART FR INSP Shear at tube steel pony wall ok.
BLD-Framing/Rough-in11/8/199911/8/199911/8/1999PFAIL
DetailsJim Storey
partial framing brian ###-#### 2hr wall verrified const. Ok, framing fail.
Inspection Record Card- Bld  10/6/1999 DONE
Print Occupancy Form  10/6/1999 DONE
Issue PAID IN FULL permit  10/6/1999 DONE
Routing - PLAN CHECK10/5/199910/5/199910/5/1999 PASS
Plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  10/5/1999  
Print Pending Permit.LaserJet4  10/5/1999  
Case Summary (BLD)  10/5/1999  
Plan assigned to (JCB)8/12/1999 10/5/1999 PASS
DetailsJason Blais
Routing Off Site - STRUCTURAL10/4/199910/4/199910/4/1999 PASS
Structural review done and approved.
Routing - FIRE10/4/199910/4/199910/4/1999 PASS
Routing - PLUMBING9/30/19999/30/199910/4/1999 PASS
Plan Review Completed(1st rev)  10/4/1999 PEND
Routing Off Site - STRUCTURAL9/15/19999/15/19999/30/1999 PEND
SENT PLAN RESUBMITTALS TO CONSULTING ENGINEER VIA PDQ. 9/15/99 DAR
Plan Reviewer's activity  9/30/1999 FAIL
Architect still needs to address two items. Outside structural engineering needs to be fully approved (one item left). Plans need to be reviewed by fire dept.
Plan Reviewer's activity  9/30/1999 FAIL
Now need fire dept. and plumbing approval. Also need final approval from outside engineering.
Plan resubmittals received  9/15/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM STEED CONSTRUCTION AND STAPLEY ENGINEERING, FORWARDED SAME TO JASON BLAIS. 9/15/99 DAR
Routing - PLAN CHECK  9/3/1999 FAIL
Plan report sent and faxed to architect. Resubmittals and response needed for further review. Plans also need to be reviewed by outside engineering (structural) again. Plans routed to fire.
Plan resubmittals requested  9/3/1999 PEND
Resubmittal drawings and response requested for further review.
Plan Reviewer's activity  9/3/1999
Plans need resubmittals and response. Plans also need to be reviewed by outside engineering again. Waiting for response and resubmittals.
Routing - PLANNING8/24/1999 8/25/1999 PASS
x-ref. drh99-0134
Routing - PLUMBING8/23/1999 8/24/1999 PASS
additional cross connection may be required, per plans and 97 upc
Routing Off Site - STRUCTURAL8/11/1999 8/24/1999 FAIL
PLANS SENT TO STRUCTURAL ENGINEERING CONSULANT, VIA PDQ. 8/11/99 DAR 8-24-99 ROUTED STRUCTURAL PLAN CHECK REVIEW COMMENTS TO JASON. KMM 9-3-99 Plans did not pass structural. Resubmittals required for further review. JCB
Routing - PUBLIC WORKS8/12/1999 8/20/1999 PASS
Plan routing begun/TENANTS  8/12/1999
Route to PUBLIC WORKS, PLUMBING, PLANNING, PLAN CHECK and FIRE.
Plan assigned to (MYS)8/10/1999 8/12/1999
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  8/11/1999 PEND
Recd Pcfee & Taken To Pln CK  8/10/1999
Application received  8/10/1999