Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD99-02420
StatusFinaled
Name SIMPLOT AGRIBUSINESS
Site Address 855 W BROAD ST
Project Name9TH STREET WAREHOUSES
Customer Number 
ePlanReviewNo
Description
(SIMPLOT AGRIBUSINESS) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To construct a 15,833 square foot office tenant space on the 2nd floor of an existing building. Work is to include interior nonbearing walls, two expanded restrooms accessible to the disabled, an access floor system, a 90 minute roll down fire door in an existing 2-hr area separation wall, interior doors, interior windows, and suspended ceilings all per approved drawings, engineering, and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-635-99 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/18/20036/18/20036/18/2003 DONE
Fee Review-notes8/11/1999 5/9/2000 DONE
Permanent occupancy  1/20/2000 DONE
Perm. Occ. Cert. #8095 issued 1-20-00 to Simplot Agribusiness.
BLD-Final1/18/20001/19/20001/19/2000APASS
Details
phil ###-#### c/n removed ok for occ. 1/20/00 11:52:58 AM
Permanent Occupancy 1/19/20001/19/2000 DONE
Details
Telephone call  1/19/2000 DONE
Left msg. on machine re: status of temp. occ. & the outstanding issue that was needed to complete the projct.
BLD-Final1/11/20001/12/20001/12/2000APASS
Details
PLEASE CALL ###-#### occ req card signed perm 2/10/00 11:34:07 AM
BLD-Final11/15/199911/16/199911/16/1999APART
Details
Scheduled by a contractor via Hello! on 11/15/1999 at 13:33:26. Contact: ###-####. Temp. occ. Ok only C/N issued exit door hardware.
Temporary occupancy  11/16/1999 PART
Temp. Occ. Cert. #3944 issued 11-16-99 to Simplot Agribusiness.
FIRE-Final Inspection11/12/199911/15/199911/15/1999APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/12/1999 at 16:27:03. Contact: ###-####. Occ. Approved.
FIRE-Alarm Testing11/12/199911/15/199911/15/1999APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/12/1999 at 16:28:00. Contact: ###-####. Alarms ok.
FIRE-Final Inspection11/5/199911/12/199911/12/1999PFAIL
DetailsRick Jackson
mike ###-#### fn fire Alarms not complete; exit signs; to overhead fire door.
FIRE-Conference11/9/199911/10/199911/10/1999APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/09/1999 at 09:50:55. Contact: ###-####. Set time for final on Friday 11/12/99.
FIRE-Final Inspection10/13/199910/20/199910/20/1999AFAIL
DetailsRick Jackson
rick pager ###-#### --fire fn --- Sprinkler R/I inspection- not ready for cover- need additional head in several areas
BLD-Framing/Rough-in9/29/19999/30/199910/1/1999APART
Details
Scheduled by a contractor via Hello! on 09/29/1999 at 13:14:18. Contact: ###-####. Ok to cover framing conf with floor installers
Routing - PLAN CHECK9/24/19999/24/19999/24/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/24/1999 PASS
Inspection Record Card- Bld  9/24/1999 DONE
Print Occupancy Form  9/24/1999 DONE
Issue PAID IN FULL permit  9/24/1999 DONE
Plan assigned to (CJW)8/11/1999 9/24/1999 PASS
DetailsCarl Westfall
9/24/1999 09:09:20 CJW - activity updated through activity BLDA022 from case BLD99-02420.
Routing - FIRE9/22/19999/22/19999/23/1999 PASS
Plan Reviewer's activity  9/22/1999 PASS
Drawings approved, with conditions, after resubmittal review.
Routing - PLAN CHECK8/24/1999 9/22/1999
Plan resubmittals received  9/14/1999 PEND
Received plan resubmittals from Margie Kennedy, Armstrong Architects, frowarded same to Carl Westfall. 9/14/99 DAR
Plan Reviewer's activity  8/26/1999 PASS
A partial permit for rough-in was cleared for issuance.
Plan Review Completed(1st rev)  8/24/1999 FAIL
Routing - FIRE8/24/1999 8/24/1999 FAIL
UFC issues concerning Plenum information, roll down fire door listing.
Routing - PLUMBING8/20/1999 8/24/1999 PASS
verify necessity of the undercounter ejector with field inspector prior to installation and ri, if an rp is installed per notes 24, 25 page p-1, provide an adeguate means of disposal, provide a drip pan for p-5, provide a trap primer for p-7.
Routing - PLAN CHECK8/16/1999 8/20/1999  
Plan Reviewer's activity  8/19/1999  
UBC plan review started August 19, 1999 and finished August 20, 1999. A response is required from the architect. See the conditions list.
Routing - PUBLIC WORKS8/12/1999 8/16/1999 PASS
Plans ACCEPTED BY PLAN TECH  8/11/1999 PASS
Received Certificate of Value  8/11/1999 PASS
Plan routing begun/TENANTS  8/11/1999
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Recd Pcfee & Taken To Pln CK  8/11/1999
Plan assigned to (MYS)8/11/1999 8/11/1999
DetailsMarlene Southard
Application received  8/11/1999
Case Summary (BLD)     
Plan Review Report