CHEVRON/MCDONALD'S PHASE I * TO CONSTRUCT A NEW 1,025 SQ.FT. DETACHED CARWASH AND STORAGE FOR THE CHEVRON/MCDONALD'S. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THE CHEVRON C-STORE/MCDONALD'S AND GRADING FOR THE WHOLE SITE IS UNDER PERMIT BLD99-2330, THE GAS ISLAND CANOPY IS UNDER BLD99-2444. THE OFFICE BUILDING IS PERMITED UNDER BLD99-2399, AND IS ROUTING UNDER SEPARATE PLANS. DRH99-0017 CUP99-0009 PC#621-99 KMM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  10/4/2000 DONE
Letter of Compliance #19914 issued 10-4-00.
Fee Review-notes8/13/1999 7/25/2000 DONE
LINDA, THE PLAN CHECK FEE FOR THIS PROJECT WAS PAID FOR UNDER BLD99-2330. THE C-STORE/MCDONALD'S, THE FUEL ISLAND CANOPY, AND THE CAR WASH WERE SUBMITTED UNDER ONE PERMIT. I HAD THEM SEPARATE THEM OUT. INTO THREE PERMITS BLD99-2330, BLD99-2246, AND BLD99-2448 KMM
FIRE-Final Inspection7/21/20007/24/20007/24/2000APASS
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/21/2000 at 14:59:10. Contact: ###-####. Final ok for perm. occ. 7/24/00 1:23:10 PM
Temporary occupancy  7/24/2000 PART
Temp. Occ. Cert. #4041 issued 7-24-00 to Chevron/McDonald's for a carwash/storage area.
BLD-Final7/20/20007/20/20007/20/2000PFAIL
DetailsJoe Tawney
Final fail fire extinguisher
BLD-Other4/11/20004/12/20004/12/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/11/2000 at 16:13:40. Contact: ###-####. Grout pour 4/12/00 2:34:34 PM
BLD-Other4/10/20004/11/20004/11/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/10/2000 at 14:45:40. Contact: ###-####. 2nd lift C/wash 4/11/00 1:54:54 PM
BLD-Foundation3/22/20003/22/20003/22/2000PPASS
DetailsTom Arcoraci
###-####
BLD-Footing3/20/20003/20/20003/20/2000PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/20/2000 at 08:28:26. Contact: ###-####.
(F) Reprint permit  12/6/1999 DONE
Issue PAID IN FULL permit  12/3/1999 DONE
Routing - PLAN CHECK10/27/199910/27/199911/9/1999 DONE
Routing - PLAN CHECK10/5/199910/5/199911/9/1999 DONE
Plan Reviewer's activity  11/9/1999 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/9/1999 DONE
Print Pending Permit.LaserJet4  11/9/1999 DONE
Case Summary (BLD)  11/9/1999 DONE
Print Occupancy Form  11/9/1999 DONE
Inspection Record Card- Bld  11/9/1999 DONE
Telephone call  11/9/1999 DONE
called Mike Baker and faxed him the permit fees at ###-####
Plan assigned to (M_P)8/13/1999 11/9/1999 PASS
DetailsMike Phillips
11/9/1999 12:03:03 M_P - activity updated through activity BLDA022 from case BLD99-02446.
Application received  11/5/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM BRS, FORWARDED SAME TO MIKE PHILLIPS. 11/5/99 DAR
Plan Reviewer's activity  10/28/1999 FAIL
Faxed structutal review comments to architect. Prior structural comments faxed to Reeze on 9/14/9 were not resubmitted with plan resubmittals date 10/18/99.
Routing - PUBLIC WORKS10/26/199910/26/199910/27/1999 PASS
Routing - FIRE10/1/199910/4/199910/4/1999 PASS
Plan Review Completed(1st rev)  10/4/1999 PEND
Routing - PLAN CHECK9/15/19999/15/199910/1/1999 FAIL
ROUTING TO FIRE
Plan resubmittals requested  10/1/1999 FAIL
Print Pending Permit.LaserJet4  10/1/1999 FAIL
Case Summary (BLD)  9/17/1999 DONE
Routing - PUBLIC WORKS9/14/19999/14/19999/15/1999 FAIL
PLANS REQUIRE DRAINAGE PLAN REVISION PER BRIAN MURPHY. 9/15/99 DAR
Routing Off Site - STRUCTURAL8/13/1999 9/14/1999 DONE
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Further review not required. Faxed comments to Architect. MJP 09/14/99
Routing - PLUMBING8/24/1999 8/25/1999 PASS
Routing - PLANNING8/18/1999 8/20/1999 PEND
Pending Design Review Approval
Routing - PUBLIC WORKS8/13/1999 8/17/1999 FAIL
REQUIRES DRAINAGE PLAN REVISIONS, PER BRIAN M. KMM
Application received  8/13/1999 PASS
Plans ACCEPTED BY PLAN TECH  8/13/1999 PASS
REQUIRES SHEET SD3 TO BE STAMPED AND SIGNED. KMM 8-18-99 RECEIVED SHEET SD3 STAMPED AND SIGNED. ROUTED ONE COPY TO OUTSIDE ENG. VIA PDQ THE OTHER TWO I PUT WITH THE PLANS. KMM
Received Certificate of Value  8/13/1999 PASS
Plan routing begun/NEW & ADDTN8/13/1999 8/13/1999
Routing Off Site - C.D.H7/30/1999 7/30/1999 PASS