Case Summary (BLD) | | | 4/2/2013 | | DONE |
|
|
|
|
Fee Review-notes | 6/17/2003 | 6/17/2003 | 6/17/2003 | | DONE |
|
|
|
|
Fee Review-notes | 8/16/1999 | | 7/21/2000 | | DONE |
|
|
|
|
Permanent Occupancy | | 5/17/2000 | 5/17/2000 | | DONE |
|
|
|
|
BLD-Final | 5/17/2000 | 5/17/2000 | 5/17/2000 | P | PASS |
|
|
|
Added by Inspector: 338 On 5/17/00 MADE OK 310 CONFIRMED SIGNOFFS FOR ME OK FOR 310 TO SIGN
|
Permanent occupancy | | | 5/17/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8237 issued 5-17-00 to Milligan & Assoc.
|
FIRE-Final Inspection | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | PASS |
Rick Jackson
|
|
|
Nick ###-####
|
BLD-Final | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | FAIL |
|
|
|
Nick ###-#### srtuctural made ok but need ACHD, MECH, AND CODE ENF. SIGNED OFF 5/16/00 3:21:33 PM
|
FIRE-Final Inspection | 4/5/2000 | 4/6/2000 | 4/6/2000 | A | FAIL |
Rick Jackson
|
|
|
c/n issued
|
BLD-Final | 4/5/2000 | 4/6/2000 | 4/6/2000 | P | FAIL |
Jim Storey
|
|
|
###-####
|
BLD-Other | 1/10/2000 | 1/11/2000 | 1/11/2000 | A | PASS |
|
|
|
for drywall at the carport to the office space
|
BLD-Framing/Rough-in | 12/28/1999 | 12/28/1999 | 12/23/1999 | P | PART |
|
|
|
BOYD NO PHONE. Ok to cover ceiling basement.
|
BLD-Foundation | 12/14/1999 | 12/14/1999 | 12/14/1999 | P | PASS |
|
|
|
nick ###-#### foun wall R-bar placed.
|
BLD-Footing | 12/13/1999 | 12/13/1999 | 12/13/1999 | A | PART |
|
|
|
conf on the reinf placement and ok to up size r-bar in the stair retaining wall NICK ###-####
|
BLD-Footing | 12/13/1999 | 12/13/1999 | 12/13/1999 | P | PASS |
|
|
|
NICK ###-#### #4 bars a 5 each in the footing 3 on top 2 in bottom; ok to use #4 bars at 18" o.c. for uprithts if continuous with footing to top of wall; #4 s ok for the horiz bars if no more than 16" o.c. doubled at the top. R-bar placed.
|
Issue PAID IN FULL permit | | | 11/24/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/19/1999 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/19/1999 | | DONE |
|
|
|
|
Telephone call | | | 10/19/1999 | | DONE |
|
|
|
called Mike ###-#### ACHD needed
|
Routing - PLAN CHECK | 10/11/1999 | 10/11/1999 | 10/16/1999 | | |
|
|
|
|
Plan Reviewer's activity | | | 10/16/1999 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/1999 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 8/19/1999 | | 10/16/1999 | | PASS |
Carl Westfall
|
|
|
10/16/1999 09:16:48 CJW - activity updated through activity BLDA022 from case BLD99-02476.
|
Routing - FIRE | 10/6/1999 | 10/11/1999 | 10/11/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 10/11/1999 | | PEND |
|
|
|
|
Routing - PLANNING | 9/17/1999 | 9/17/1999 | 10/6/1999 | | PASS |
|
|
|
Approved per DRH99-0186.by TKW
Approved per CUP99-0075.by BGN
|
Plan resubmittals received | | | 9/28/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM PATRICK McKEEGAN ARCHITECTS, FORWARDED SAME TO CARL WESTFALL. 9/28/99 DAR
|
Plan Reviewer's activity | | | 9/17/1999 | | |
|
|
|
UBC plan review started September 16, 1999 and finished September 17, 1999. A response from the architect is required. See the conditions list.
|
Routing - PLAN CHECK | 8/31/1999 | | 9/17/1999 | | |
|
|
|
|
Routing - PUBLIC WORKS | 8/20/1999 | | 8/26/1999 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 8/16/1999 | | 8/19/1999 | | |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 8/19/1999 | | |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE. NOTE: THIS PLAN WAS SUBMITTED PRIOR TO DESIGN REVIEW APPLICATION BEING LOGGED IN OR ASSIGNED TO A PLANNER.
|
Plans ACCEPTED BY PLAN TECH | | | 8/19/1999 | | FAIL |
|
|
|
CHECKED WITH TEMPRA WILSON ABOUT DESIGN REVIEW. SHE STATED THAT AT LEAST A STAFF LEVEL DESIGN REVIEW WOULD BE REQUIRED. I NOTIFIED PAT MCKEEGANS OFFICE OF THE REQUIREMENT ON 8/16/99. 8/19/99 DAR
|
Recd Pcfee & Taken To Pln CK | | | 8/16/1999 | | |
|
|
|
|
Application received | | | 8/16/1999 | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|