Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02509
StatusFinaled
Name ROTHS SHOES
Site Address 350 N MILWAUKEE ST Unit: 2071
Project NameBTS - #2070
Customer Number 
ePlanReviewNo
Description
To remodel a 2,178 sq.ft. retail tenant per approved plans on file. Work to include removal of existing interior wall slatwall & wallpaper in retail sales area; repair existing drywall as necessary to receive new paint, slatwall & trim; relocate mirror; new suspended ceiling system; new layout & addition to lighting fixtures; new millwork & floor coverings; construction of 24 feet of new interior display wall and new storefront framing & finishes. NOTE: This building is fully fire sprinklered and has a smoke control system. (P.C.#662-99)/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/18/1999 7/21/2000 DONE
additional value from subs
Letter of compliance  3/6/2000 DONE
Letter of Compliance #18378 issued 3-6-00.
BLD-Final3/3/20003/3/20003/3/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/03/2000 at 10:57:26. Contact: ###-####. Ok for T/O, has elec. C/N. 3/6/00 11:12:20 AM
FIRE-Final Inspection3/2/20003/2/20003/2/2000PPASS
DetailsJoe Tawney
Gary ###-#### Final ok for perm. occ. 3/3/00 8:41:06 AM
BLD-Conference3/1/20003/1/20003/1/2000APASS
DetailsCarl Dependahl
W/supt. re: door hdwe.
BLD-Other2/29/20002/29/20002/29/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/29/2000 at 10:00:10. Contact: ###-####. Ceiling 3/1/00 11:11:45 AM
BLD-Conference2/15/20002/15/20002/15/2000APASS
DetailsCarl Dependahl
W/supt. re: correction, ok to cover.
BLD-Wall cover2/11/20002/11/20002/11/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/11/2000 at 10:08:51. Contact: ###-####. Ok to cover walls & storefront. 2/14/00 11:53:15 AM
FIRE-Sprinkler Rough-in2/10/20002/10/20002/10/2000PPART
DetailsJoe Tawney
###-####\\UPPER LEVEL ROTH SHOES ok to cover sprinkler r/I
BLD-Conference2/9/20002/9/20002/9/2000PPART
DetailsCarl Dependahl
gary ###-#### c/n re access @ storefront ; ok to cover pend ele
CHANGE STATUS TO (I)  1/28/2000 DONE
Inspection Record Card- Bld  1/26/2000 DONE
Print Occupancy Form  1/26/2000 DONE
Telephone call  1/26/2000 DONE
###-#### called CSDI and left message for Jeffrey with fees due
Issue PAID IN FULL permit  1/26/2000 DONE
Plan assigned to (DRS)8/20/1999 1/26/2000 PASS
DetailsDan Stuart
1/26/2000 10:16:48 DRS - activity updated through activity BLDA022 from case BLD99-02509.
Routing - PLAN CHECK1/25/20001/25/20001/25/2000 PASS
Inserted new submittal sheets & engineering details into plans and referenced the engineering details for sizing framing members & methods of connection. Routing to permit desk for issuance.
PLANS/APPL TAKEN TO FRONT DESK  1/25/2000 PASS
Ready for issuance of permit.
Plan resubmittals received  1/25/2000 PASS
Received additional engineering for connection details & upgrading the beam sizes to (3)1000 16 gage when taking into account the additional dead load of the storefron at the cantilever. The engineering was done locally this time by CSHQA.
Plan resubmittals requested  1/20/2000  
Plans received from Peter Rockwell were incomplete in that the framing detail 1/A2 did not reflect engineering detail framing and the engineering submitted did not reflect the additional dead load for the cantilevered stor fron bulkhead with the marble finish. Correction requirements faxed to Peter & to Engineer & contractor.
Plan resubmittals received  1/19/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM PETE ROCKWELL, ARTECTURAL SHEETS, FORWARDED SAME TO DAN STUART. 1/19/00 DAR
Telephone call  10/12/1999 HOLD
Called Pete Rockwell, Architect, to check on progress of re-submittals for Roth's. Shoes Project. Pete said the contractor was going to call me concerning the plan review (CSDI, Jeff Langan). I said that I needed the response through his office as he is the architect of record and that I did need engineering for the new bulkhead for support. Pete said he would work on a response.
Routing - FIRE9/15/19999/15/19999/20/1999 PASS
FED EXED PLANS TO FLOYD. KMM
9/21/99 RECEIVED OFFICE COPY BACK FROM FLOYD. FAXED RESPONSE TO ARCH. ROUTED TO BILL A. KMM
Plan Review Completed(1st rev)  9/20/1999 PEND
Plan resubmittals requested  9/10/1999 FAIL
Structural details for new store header entry & drywall ceiling support. Letter & FAX to architect, Pete Rockwell.
Routing - PLAN CHECK8/20/1999 9/10/1999 FAIL
Resubmittals required from architect. Routing to Fire code analyst for review while waiting for architects response.
Plan routing begun/TENANTS  8/20/1999
Route to PLAN CHECK and FIRE.
Plan assigned to (MYS)8/18/1999 8/20/1999
DetailsMarlene Southard
Application received  8/19/1999 PEND
Plans ACCEPTED BY PLAN TECH  8/19/1999 PEND
Routing - PLAN CHECK9/22/19999/22/1999