Fee Review-notes | 8/18/1999 | | 7/21/2000 | | DONE |
|
|
|
additional value from subs
|
Letter of compliance | | | 3/6/2000 | | DONE |
|
|
|
Letter of Compliance #18378 issued 3-6-00.
|
BLD-Final | 3/3/2000 | 3/3/2000 | 3/3/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/03/2000 at 10:57:26. Contact: ###-####. Ok for T/O, has elec. C/N. 3/6/00 11:12:20 AM
|
FIRE-Final Inspection | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PASS |
Joe Tawney
|
|
|
Gary ###-#### Final ok for perm. occ. 3/3/00 8:41:06 AM
|
BLD-Conference | 3/1/2000 | 3/1/2000 | 3/1/2000 | A | PASS |
Carl Dependahl
|
|
|
W/supt. re: door hdwe.
|
BLD-Other | 2/29/2000 | 2/29/2000 | 2/29/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/29/2000 at 10:00:10. Contact: ###-####. Ceiling 3/1/00 11:11:45 AM
|
BLD-Conference | 2/15/2000 | 2/15/2000 | 2/15/2000 | A | PASS |
Carl Dependahl
|
|
|
W/supt. re: correction, ok to cover.
|
BLD-Wall cover | 2/11/2000 | 2/11/2000 | 2/11/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/11/2000 at 10:08:51. Contact: ###-####. Ok to cover walls & storefront. 2/14/00 11:53:15 AM
|
FIRE-Sprinkler Rough-in | 2/10/2000 | 2/10/2000 | 2/10/2000 | P | PART |
Joe Tawney
|
|
|
###-####\\UPPER LEVEL ROTH SHOES ok to cover sprinkler r/I
|
BLD-Conference | 2/9/2000 | 2/9/2000 | 2/9/2000 | P | PART |
Carl Dependahl
|
|
|
gary ###-#### c/n re access @ storefront ; ok to cover pend ele
|
CHANGE STATUS TO (I) | | | 1/28/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/26/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/26/2000 | | DONE |
|
|
|
|
Telephone call | | | 1/26/2000 | | DONE |
|
|
|
###-#### called CSDI and left message for Jeffrey with fees due
|
Issue PAID IN FULL permit | | | 1/26/2000 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 8/20/1999 | | 1/26/2000 | | PASS |
Dan Stuart
|
|
|
1/26/2000 10:16:48 DRS - activity updated through activity BLDA022 from case BLD99-02509.
|
Routing - PLAN CHECK | 1/25/2000 | 1/25/2000 | 1/25/2000 | | PASS |
|
|
|
Inserted new submittal sheets & engineering details into plans and referenced the engineering details for sizing framing members & methods of connection. Routing to permit desk for issuance.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/25/2000 | | PASS |
|
|
|
Ready for issuance of permit.
|
Plan resubmittals received | | | 1/25/2000 | | PASS |
|
|
|
Received additional engineering for connection details & upgrading the beam sizes to (3)1000 16 gage when taking into account the additional dead load of the storefron at the cantilever. The engineering was done locally this time by CSHQA.
|
Plan resubmittals requested | | | 1/20/2000 | | |
|
|
|
Plans received from Peter Rockwell were incomplete in that the framing detail 1/A2 did not reflect engineering detail framing and the engineering submitted did not reflect the additional dead load for the cantilevered stor fron bulkhead with the marble finish. Correction requirements faxed to Peter & to Engineer & contractor.
|
Plan resubmittals received | | | 1/19/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM PETE ROCKWELL, ARTECTURAL SHEETS, FORWARDED SAME TO DAN STUART. 1/19/00 DAR
|
Telephone call | | | 10/12/1999 | | HOLD |
|
|
|
Called Pete Rockwell, Architect, to check on progress of re-submittals for Roth's. Shoes Project. Pete said the contractor was going to call me concerning the plan review (CSDI, Jeff Langan). I said that I needed the response through his office as he is the architect of record and that I did need engineering for the new bulkhead for support. Pete said he would work on a response.
|
Routing - FIRE | 9/15/1999 | 9/15/1999 | 9/20/1999 | | PASS |
|
|
|
FED EXED PLANS TO FLOYD. KMM
9/21/99 RECEIVED OFFICE COPY BACK FROM FLOYD. FAXED RESPONSE TO ARCH. ROUTED TO BILL A. KMM
|
Plan Review Completed(1st rev) | | | 9/20/1999 | | PEND |
|
|
|
|
Plan resubmittals requested | | | 9/10/1999 | | FAIL |
|
|
|
Structural details for new store header entry & drywall ceiling support. Letter & FAX to architect, Pete Rockwell.
|
Routing - PLAN CHECK | 8/20/1999 | | 9/10/1999 | | FAIL |
|
|
|
Resubmittals required from architect. Routing to Fire code analyst for review while waiting for architects response.
|
Plan routing begun/TENANTS | | | 8/20/1999 | | |
|
|
|
Route to PLAN CHECK and FIRE.
|
Plan assigned to (MYS) | 8/18/1999 | | 8/20/1999 | | |
Marlene Southard
|
|
|
|
Application received | | | 8/19/1999 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/19/1999 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 9/22/1999 | 9/22/1999 | | | |
|
|
|
|