Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD99-02518
StatusFinaled
Name HEATH MARK E &
Site Address 351 N MITCHELL ST
Project NameBUSINESS INTERIORS
Customer Number 
ePlanReviewNo
Description
BUSINESS INTERIORS OF IDAHO * TO CONSTRUCT A NEW 35,265 SQ. FT., ONE STORY, WAREHOUSE BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF CONCRETE FOUNDATION AND SLAB FLOOR, CONCRETE TILT-UP EXTERIOR WALLS, STEEL STRUCTURAL FRAME AND ROOF JOISTS WITH METAL ROOF DECK AND SINGLE PLY ROOFING SYSTEM. ALL CONSTRUCTION PER APPROVED PLANS AND ATTACHED REQUIREMENT LIST. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR UNLIMITED AREA. DRH99-0068/GRADING PERMIT BLD99-2576/PC#665-99/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/17/20036/17/20036/17/2003 DONE
Fee Review-notes8/19/1999 7/24/2000 DONE
Fee Review-notes8/24/19998/24/19997/21/2000 DONE
LINDA I RECEIVED A REVISED CERT. OF VALUE BECAUSE THEY ARE PULLING A GRADING PERMIT. REVISED CERT. MINUS GRADING IS PROJECT VALUE $1,170,000 ELECT. $45,000 PLUMB. $27,000 MECH. $30,000 FIRE SPRINKLER $44,000 THANKS KATHY 2/18/00-additional value from subs...lh
Override - Parcel Holds  6/1/2000  
Permanent occupancy  6/1/2000 DONE
Perm. Occ. Cert. #8250 issued 6-1-00 to Business Interiors.
Permanent Occupancy 5/31/20005/31/2000 DONE
Details
BLD-Final5/30/20005/31/20005/31/2000PPASS
DetailsCarl Dependahl
###-#### 726877 P&Z ok, ok for C/O. 6/1/00 11:25:42 AM
Override - Parcel Holds  5/30/2000  
BLD-Final5/22/20005/23/20005/23/2000APASS
DetailsCarl Dependahl
Carl, this is the one we talked about and I have the card - Cathy Ok for C/O. 5/24/00 11:11:57 AM
Override - Parcel Holds  5/22/2000  
Override - Parcel Holds  4/20/2000  
Override - Parcel Holds  4/14/2000  
Receive PAYMENT IN FULL  4/14/2000 DONE
(F) Reprint permit  2/18/2000 DONE
BLD-Conference2/14/20002/14/20002/14/2000PPASS
DetailsCarl Dependahl
REVIEWED SPEC. INSP. REPORTS
Temporary occupancy  2/3/2000 DONE
Temp. Occ. Cert. #3972 issued 2-3-00 to Business Interiors.
Temporary occupancy  2/3/2000 PART
Temp. Occ. Cert. #3972 issued 2-3-00 has been extended until 6-3-00 as per TJH.
FIRE-Final Inspection1/27/20001/28/20001/28/2000PPASS
DetailsRick Jackson
MMike ###-#### early afternoon
BLD-Final1/24/20001/25/20001/25/2000APART
Details
mike ###-#### temp granted for fire signoff by Lan Smith as long as there is security watch after hours. 1/26/00 7:59:04 AM
FIRE-Final Inspection1/24/20001/24/20001/24/2000PPART
DetailsJoe Tawney
###-#### Awaiting phone line for alarm monitoring. 1/25/00 1:32:31 PM
BLD-Final1/24/20001/24/20001/24/2000PFAIL
DetailsCarl Dependahl
###-#### need fire recall 1/31/00 9:01:03 AM
FIRE-Final Inspection1/20/20001/21/20001/21/2000PCANC
DetailsJoe Tawney
Mike ###-####
BLD-Final1/20/20001/21/20001/21/2000PCANC
DetailsCarl Dependahl
Mike ###-####
Code Occupancy Approval  1/6/2000 FAIL
Inspected to bond for temporary - Bond amount is $53,800 + 10% $5,380 for a total of $$59,180.00 to bond for the landscaping, striping and painting.
Bond received and signed occupancy card on 01/13/00.
BLD-Framing/Rough-in1/5/20001/5/20001/5/2000PPASS
DetailsTom Arcoraci
mike ###-####. Need eng. letter by final.
BLD-Conference12/8/199912/8/199912/8/1999APART
DetailsCarl Dependahl
rec'd spec insp reports, w.i.p...
BLD-Footing11/10/199911/12/199911/12/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/10/1999 at 14:24:17. Contact: ###-####. Placed W/SI on 11/11/99 pending report.
BLD-Foundation11/8/199911/9/199911/9/1999PPART
DetailsCarl Dependahl
MIKE ###-####--PANELL 15,17,14,23,18,26,31,30,28,29,32,27 Sp. Insp. Onsite.
BLD-Framing/Rough-in11/3/199911/4/199911/4/1999APART
Details
TILT PANEL REINFORCING MIKE PANELS 1-9 12-14-34-36 * ###-#### Sp insp. Make ok - rain ok to pour
BLD-Concrete11/1/199911/1/199911/1/1999PPART
DetailsCarl Dependahl
REBAR MIKE ###-#### PANELS 16 9 20 21 22 24 25 14 9 11 13 Spec. insp. Onsite
FIRE-Sprinkler Rough-in10/20/199910/21/199910/21/1999APART
DetailsJoe Tawney
JEFF-- ###-#### --FIRE MAIN UNGROUND Ok to cover supply line except connection to water supply and hydrant
FIRE-Supply Line Cover10/21/199910/21/199910/21/1999PPART
DetailsJoe Tawney
Ok to cover all underground piping.
BLD-Foundation10/18/199910/20/199910/20/1999PPART
DetailsCarl Dependahl
GRID LINE C THROUGH F -MIKE-- ###-#### Spec. insp. Onsite
BLD-Framing/Rough-in10/18/199910/19/199910/19/1999PPART
DetailsCarl Dependahl
WALL PANEL RE-INFORCING--33, 35 37 PANELS #--MIKE- ###-#### Met w/ Mike, supt. Spec. insp. Onsite
BLD-Concrete10/14/199910/14/199910/14/1999PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/14/1999 at 08:10:08. Contact: ###-####. Sp. Insp. Onsite
BLD-Footing10/12/199910/13/199910/13/1999APART
DetailsCarl Dependahl
MIKE--- ###-#### FT INSP Tilt-up, spec. insp. Onsite ( Kriezenbeck const. Job)
(F) Reprint permit  10/13/1999 DONE
Routing Off Site - A.C.H.D10/12/199910/12/199910/12/1999 DONE
brought in impact cert
PLANS/APPL TAKEN TO FRONT DESK  10/12/1999 PASS
Inspection Record Card- Bld  10/12/1999 DONE
Print Occupancy Form  10/12/1999 DONE
Telephone call  10/12/1999 DONE
Spoke with Mike ###-#### and left message about the fees and I also spoke with him and he said that he would be down after he got ACHD
Issue PAID IN FULL permit  10/12/1999 DONE
Routing - PLAN CHECK9/17/1999 10/12/1999 PASS
ROUTED ISSUE COPY TO JOHN M. OFFICE COPY WAS FED EXED TO FLOYD ON THE 15TH. WHEN IT RETURNS WILL ROUTE TO JOHN. GRADING PERMIT WAS ISSUED ON 9/17/99 (BL###-####6)
Plan assigned to (JCM)8/19/1999 10/12/1999 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL9/22/1999 10/11/1999 PASS
FAXED THE CONSULTING ENGINEER A COPY OF THE RESPONSES FROM THE ENGINEER OF RECORD FOR THIS PROJECT.
Routing - FIRE9/15/19999/15/19999/17/1999 PASS
FED EXED TO FLOYD. KMM Previously reviewed by Bill (awaiting resubmittal information). Received required resubmittal information 09/16/1999.
9/21/99 RECEIVED OFFICE COPY BACK FROM FLOYD. ROUTED TO BILL. KMM
Plan resubmittals requested  9/17/1999 PEND
FAXED JEFF FOSTER AT MARK KNOWLES OFFICE A COPY OF THE PLAN REVIEW COMMENTS FROM THE CONSULTING ENGINEER REQUESTING REVISIONS.
Plan resubmittals received  9/16/1999 PASS
RECEIVED ADDITIONAL INFORMATION AND APPLICATION REVISIONS FROM THE ARCHITECT.
Routing - PLAN CHECK9/8/19999/8/19999/15/1999 PEND
Routing - PLAN CHECK9/2/1999 9/15/1999
Routing Off Site - STRUCTURAL8/20/1999 9/13/1999 PEND
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
9/20/99 RECEIVED RESPONSES TO THE PLAN REVIEW COMMENTS FROM DARIN PEDERSEN OF AHJ TO JEFF FOSTER (MARK KNOWLES ARCH.) ROUTED TO JOHN M. KMM
Routing - FIRE9/3/19999/9/19999/7/1999 FAIL
NEED WATER SUPPLY INFORMATION. NEED COMMODITY ELEVATION AND CLASSIFICATION ALL FOR FIRE SPRINKLER DESIGN REQUIREMENTS.
Plan Review Completed(1st rev)  9/7/1999 FAIL
Plan Reviewer's activity  9/3/1999 PASS
PLANS REVIEWED AND APPROVED WITH ATTACHED PLAN REVIEW COMMENT LIST.
Routing - PLANNING8/31/1999 9/1/1999 PASS
DRH99-0068
Routing - PLUMBING8/26/1999 8/30/1999 PASS
OFFSET RAINDRAINS AWAY FROM TRUCK RAMP TO DRAIN TO PARKING LOT.
Received Certificate of Value  8/24/1999 PASS
RECEIVED REVISED CERT. OF VALUE. NEW PROJECT VALUE $1,170,00 ELECT. $45,00 PLUMB. $27,000 MECH. $30,000 FIRE SPRINKLER $44,000. ROUTED TO JOHN M. AND PUT ONE IN FILE. KMM REVISED DUE TO GRADING PERMIT. KMM
Plans ACCEPTED BY PLAN TECH  8/20/1999 PASS
Received Certificate of Value  8/20/1999 PASS
Plan routing begun/NEW & ADDTN8/20/1999 8/20/1999
Application received  8/19/1999
Plan assigned to (MYS)8/19/1999 8/19/1999 PASS
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  8/19/1999
Routing - PUBLIC WORKS8/20/1999 8/26/1996 PASS