Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02572
StatusFinaled
Name EMPIRE BUILDING
Site Address 205 N 10TH ST
Project NameEMPIRE BLDG-SHELL
Customer Number 
ePlanReviewNo
Description
(THE EMPIRE BUILDING - PHASE 1) This building will be fire sprinkered under the provisions of the 1994 UCBC to allow it to be 2 stories and 26 feet too tall. To upgrade an existing building to comply with the seismic and exiting provisions of the 1994 UCBC. Work is to include two full height interior braced frames with supporting concrete footings and pillars, a new full height 2-hr noncombustible stair enclosure, modifications to the existing full height stairway, masonry shear walls in the basement, concrete moment frames on the first floor at the South and East exterior walls, masonry pillars in the basement to support the first floor concrete moment frames, floor/roof infills on the 4th, 5th, and 6th floors, wall infills at the West wall, a modified bitumen roof membrane, a Class I standpipe system, and a new mechanical well on the roof all per approved drawings, engineering, and plan review conditions on file. A demo permit was issued earlier. This permit does not establish a Certificate of Occupancy for any tenant. Occupancy of the building is not approved under this permit. The fire sprinkler system, to be completed under a future permit, shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-685-99 DRH99-0163/DRH99-0164 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/24/1999 3/21/2001 DONE
Letter of compliance  12/29/2000 PART
Letter of Compliance #21304 issued 12-29-00 to Wensel Construction for Phase I of the Empire Bldg. shell only.
BLD-Final12/26/200012/26/200012/26/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2000 at 07:52:18. Contact: ###-####.
BLD-Conference12/22/200012/22/200012/22/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/22/2000 3:56:02 PM w bldr, call insp for tenants...supply copies of eng's/spec. insp affidavit letters re shell & seismic upgrades,file misplaced??? c/n issued re lobby/ bsmt stair rails
BLD-Final12/21/200012/21/200012/21/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/21/2000 at 07:19:02. Contact: ###-####.
BLD-Final12/20/200012/20/200012/20/2000PPART
DetailsCarl Dependahl
fn occ ed ###-#### , c/n issued re stairs at bsmt and smt corridor (airflow above grid clg???); need submittal for rails. ok for t/o 12/20/2000 4:01:54 PM 12/20/2000 4:03:58 PM
FIRE-Final Inspection12/18/200012/18/200012/18/2000PPASS
DetailsRick Jackson
ED-- ###-#### FIRE FN
BLD-Conference12/15/200012/15/200012/15/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/15/2000 3:17:38 PM w/ bldr re c/n
FIRE-Final Inspection11/22/200011/27/200011/27/2000AFAIL
DetailsRick Jackson
fire alarm final lyle ###-####////// alarms tested and complete 11/27/2000 10:45:47 AM
FIRE-Final Inspection11/16/200011/17/200011/17/2000PFAIL
DetailsRick Jackson
Lyle ###-####
BLD-Final11/16/200011/17/200011/17/2000PFAIL
DetailsCarl Dependahl
FN ED-- ###-#### ; c//n issued 11/17/2000 5:03:28 PM
BLD-Conference11/15/200011/16/200011/16/2000PFAIL
DetailsCarl Dependahl
Ed ###-####; c/n re stairs, rails, bsmt corridor not done, etc. 11/16/2000 1:31:46 PM
BLD-Conference11/15/200011/15/200011/15/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/15/2000 at 10:46:53. Contact: ###-####.
BLD-Conference11/15/200011/15/200011/15/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/15/2000 5:32:08 PM w/ cont & westfall
Code Occupancy Approval  11/14/2000 PASS
AFTER REVIEWING THE FILES FOR THIS BUILDING (DRH99-00163 & DRH99-00164) THE OUT SIDE OF THIS BUILDING APPEARS TO BE IN COMPLIANCE WITH THE NOTED REQUIREMENTS, FINAL OCCUPANCY HAS BEEN SIGNED OFF.
BLD-Final11/9/200011/13/200011/13/2000ANR
DetailsCarl Dependahl
partail final Ed ###-####, need fire, engs ok. spoke w/ ed ( wensel) 11/13/2000 3:47:26 PM
BLD-Framing/Rough-in8/16/20008/16/20008/16/2000PPART
Details
ED-- ###-#### FR INSP-FIRE CALUKING ON STAIR with ed and drywaller on the fire caulking of inside of the inner layer 8/16/2000 3:32:35 PM
BLD-Framing/Rough-in8/10/20008/11/20008/11/2000APART
Details
ed-- ###-#### partial fr-not between 2:30 & 3:30 ??????? madeok to cover stairs after fire caulking is completed and inspected, need drywall iner inshaft damper penes 8/11/2000 2:58:56 PM
BLD-Framing/Rough-in8/2/20008/3/20008/3/2000APART
Details
STAIR TOWER INSP--ED-- ###-#### ok for the install of the outer layers 8/3/2000 3:27:45 PM
Plan resubmittals received  6/28/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS A6.4 AND A6.5. ROUTED TO PERRY PAINE. KMM
BLD-Conference6/27/20006/27/20006/27/2000PPART
Details
ed ###-#### walked all floors misc q's on the stair 6/27/00 4:36:23 PM
BLD-Framing/Rough-in5/30/20005/30/20005/30/2000PPART
Details
Ed ###-#### 5thflor ok to cover core walls at the restroom area 6/2/00 4:13:03 PM
BLD-Framing/Rough-in5/16/20005/16/20005/16/2000PPART
Details
ed ###-#### part fr & energy code walked al floors with all floors with bob and ed checked out fire caulking and framing of the core and infil area, must seperate all hdronics and elec conduits from the stair enlosure. 5/17/00 7:24:50 AM
BLD-Framing/Rough-in5/10/20005/12/20005/12/2000APART
Details
###-#### fire caulking verbal corrections and a little destructive lok at the fire caulk not installed per listing 5/12/00 9:43:58 AM
BLD-Framing/Rough-in5/2/20005/2/20005/2/2000PPART
Details
partial framing and fire caulking ###-#### with all trades on the fire caulking at all levels 5/4/00 5:26:08 PM
BLD-Framing/Rough-in4/20/20004/21/20004/21/2000PPART
Details
fire caulking\\###-#### ed please call first on firecaulking with all subs 04/24/2000 7:30:24 AM
BLD-Conference4/19/20004/19/20004/19/2000APART
Details
ok to cover 1-side of framed walls, still need to onspect the floor ceiling concealed penetrations, drywall is required behind the sheathing on the paraput walls of new infill construction of the building west side infill, per the approved plans 04/20/2000 8:42:42 AM
BLD-Framing/Rough-in4/12/20004/17/20004/17/2000APART
Details
Scheduled by Inspector: 338 On 04/12/2000 early as poss. in progress 04/17/2000
BLD-Framing/Rough-in4/13/20004/14/20004/14/2000APART
Details
Scheduled by a contractor via Hello! on 04/13/2000 at 12:06:00. Contact: ###-####. walked all floors still connecting at ext and covering /patchng old plaster 04/14/2000
BLD-Framing/Rough-in4/11/20004/12/20004/12/2000AFAIL
Details
ed ###-#### reccheduled to 4/17/00 04/12/2000
BLD-Framing/Rough-in3/24/20003/27/20003/27/2000APART
Details
partial framing inspection bob ###-#### made ok to continue on the ceiling cover for the 2nd floor 03/28/2000
BLD-Framing/Rough-in3/21/20003/22/20003/22/2000APART
Details
###-#### conf on the perimeter bolt attachmenta and drywall cover on the extisting plaster patches 03/23/2000 8:07:58 AM
BLD-Foundation3/15/20003/15/20003/15/2000PPART
Details
###-#### Ed made ok with sp insp approvals 03/16/2000 7:55:24 AM
BLD-Foundation3/13/20003/14/20003/14/2000APART
Details
Scheduled by a contractor via Hello! on 03/13/2000 at 16:30:21. Contact: ###-####. made ok with sp insp approvals 3/14/00 5:12:19 PM
BLD-Concrete3/8/20003/8/20003/8/2000PPART
Details
r-bar placed 1st lift at ext shear walls
BLD-Framing/Rough-in3/8/20003/8/20003/8/2000PPART
Details
need eng to signoff strap nailing
BLD-Foundation3/1/20003/2/20003/2/2000APART
Details
masonary - ed ###-####-chervon shear wall r-bar placed ok to pour pending sp insp approvals 3/2/00 3:46:43 PM
BLD-Concrete2/16/20002/17/20002/17/2000APART
DetailsTom Arcoraci
###-#### Ok pending spec. insp. report. 2/17/00 2:14:37 PM
BLD-Concrete2/1/20002/2/20002/2/2000APART
Details
Ed Cuttlers ###-#### made ok to pour with sp insp approvals 2/14/00 10:58:19 AM
BLD-Concrete1/24/20001/25/20001/25/2000PPART
Details
Ed ###-#### madeok to on r-bar for new columns 1/26/00 8:22:24 AM pending sp insp approvals 1/26/00 8:22:52 AM
Routing Off Site - STRUCTURAL10/21/1999 1/24/2000  
CONTACTED PDQ TO TAKE PLAN RESUBMITTALS DATED 10/20/99 TO OUT SIDE ENG. KMM
1/24/2000 RECEIVED REVIEW FROM CH2MHILL. ROUTED TO CARL W. KMM
BLD-Concrete1/19/20001/20/20001/20/2000APART
Details
CONCRETE COLUMS---ED--- CELL ###-#### made ok to pour r-bar placed and sp insp approved 1/20/00 11:48:00 AM
BLD-Concrete1/13/20001/13/20001/13/2000PPART
DetailsJim Storey
grouting at 2pm john ###-#### Topout & grout lift on e8,e7,e6&e1 ok to first floor elevation. Rebar & form repair pier engineering
BLD-Framing/Rough-in1/7/20001/10/20001/10/2000APART
Details
Masonry steel inspection John Carter ###-#### between 8-10 made ok with sp onsp approvals 2/10/00 11:31:21 AM
BLD-Concrete1/4/20001/5/20001/5/2000APART
Details
Scheduled by a contractor via Hello! on 01/04/2000 at 13:55:10. Contact: ###-####made ok to po0r six columns in lower level for e/w brace frames 2" slump,weel barrow and 6" trinniy used with elec vibrator
BLD-Footing12/29/199912/29/199912/29/1999PPART
Details
Scheduled by a contractor via Hello! on 12/29/1999 at 10:40:23. Contact: ###-####. Ok for R-bar conc. colums center shear East to West.
BLD-Concrete12/28/199912/28/199912/28/1999APART
Details
Spoke with engineer on epoxy bolting @ column to new.
Plan resubmittals received  12/27/1999 DONE
RECEIVED PLAN RESUBMITTALS FROM ZGA ARCHITECTS, MICHAEL SIMMONDS, FORWARDED SAME TO PERRY PAINE AS DIRECTED BY THE TRANSMITTAL. 12/27/99 DAR
BLD-Footing12/22/199912/23/199912/23/1999AFAIL
Details
Scheduled by a contractor via Hello! on 12/22/1999 at 17:48:41. Contact: ###-####. R-bar placement must be corrected.
BLD-Footing12/17/199912/20/199912/20/1999AFAIL
Details
Scheduled by a contractor via Hello! on 12/17/1999 at 17:51:19. Contact: ###-####. R-bar not complete.
Issue PAID IN FULL permit  11/16/1999 DONE
Print Occupancy Form  11/12/1999 DONE
Inspection Record Card- Bld  11/12/1999 DONE
Telephone call  11/12/1999 DONE
called permit ready and fees due. Left message with receptionist. ###-####
Plan assigned to (CJW)8/26/1999 11/10/1999 PASS
DetailsCarl Westfall
11/10/99 14:32:45 CJW - activity updated through activity BLDA022 from case BLD99-02572.
Plan Reviewer's activity  11/9/1999 PASS
Drawings approved, with conditions, after resubmittal reviews by the plans examiner and consultant structural engineer. See the office copy of the approved plans for a complete history of resubmittals, rejections, and approvals.
PLANS/APPL TAKEN TO FRONT DESK  11/9/1999 PASS
Routing - PUBLIC WORKS10/28/1999 10/28/1999 PASS
Plan resubmittals received  10/25/1999  
RECEIVED PLAN RESUBMITTALS FROM ZGA ARCHITECTS, FORWARDED SAME TO CARL WESTFALL. 10/25/99 DAR
Plan resubmittals received  10/21/1999 DONE
10/21/99 RECEIVED THIRD COPY OF REVISED SHEETS S3.1 AND S3.3 WITH RIVISION DATE 10/18/99 ROUTED TO CARL W. KMM
Plan resubmittals received  10/20/1999  
RECEIVED TWO COPIES OF REVISED SHEETS S3.1, S3.3, DATED 10/18/99 ROUTED TO CARL W. CONTACTED DAN LITTLE ASKING FOR ONE MORE COPY OF REVISED SHEETS S3.1, AND S3.3 DATED 10/18/99. THE LAST REVISION I HAD ON THESE SHEETS WAS 10-11-99 KMM
Plan resubmittals received  10/11/1999  
PLAN RESUBMITTALS RECEIVED FROM ZGA ARCHITECTS, DAVID RUBY, FORWARDED SAME TO CARL WESTFALL. 10/11/99 DAR
Plan Review Completed(1st rev)  10/7/1999 PEND
Routing - FIRE9/27/1999 10/7/1999 PASS
Have some standpipe and sprinkler stipulations (before installation).
10/8/99 OFFICE COPY BACK FROM FLOYD. ROUTED TO BILL A. KMM
Routing - PUBLIC WORKS8/26/1999 9/29/1999 FAIL
REQUIRES FURTHER EXAMINATION OF DISCHARGE BY PUBLIC WORKS PRIOR TO APPROVAL. 9/29/99 DAR
Routing Off Site - STRUCTURAL9/16/1999 9/28/1999  
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
RECEIVED RESPONSE FROM CONSULTING ENGINEER. 9/28/99 DAR
Routing - PLAN CHECK9/3/1999 9/27/1999
Plan Reviewer's activity  9/23/1999  
UBC plan review started September 23, 1999 and finished September 27, 1999. A response from the architect is required. See the conditions list.
Plan resubmittals received  9/15/1999  
RECEIVED PLAN RESUBMITTALS FROM DAVID RUBY, ZGA ARCHITECTS,FORWARDED SAME TO CARL WESTFALL..9/15/99 DAR
Routing - PLANNING8/26/1999 9/3/1999 PASS
Plan assigned to (MYS)8/24/1999 8/26/1999
DetailsMarlene Southard
Plan routing begun/TENANTS  8/26/1999
Route to outside structural engineer, PLANNING (Marty Santoyo and Trish Canaday), PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  8/25/1999 PASS
Received Certificate of Value  8/25/1999 PASS
Recd Pcfee & Taken To Pln CK  8/24/1999
Application received  8/24/1999
BLD-Concrete2/8/20002/8/20002/10/1999PPART
Details
###-#### ed madeok to pour lower beam s on the east side 2nd floor level walked project with cwestfall observed the attachments at brace frames and drag strut assemblies in progress 2/10/00 10:04:58 AM
Routing Off Site - STRUCTURAL10/13/1999    
CONTACTED PDQ TO TAKE ONE COPY OF PLAN RESUBMITAL OF 10-11-99 OUT TO OUTSIDE ENG. KMM
Routing - PLAN CHECK10/7/1999    
Routing Off Site - STRUCTURAL8/26/1999  
Sent out to engineer via PDQ.