BLD-Final | 2/22/2000 | 2/23/2000 | 2/23/2000 | A | PASS |
Russ Owen
|
|
|
###-#### Temp. code compliance at guardrails and handrail, note: will most likely be changed. 2/23/00 2:17:31 PM
|
BLD-Final | 2/18/2000 | 2/22/2000 | 2/22/2000 | P | FAIL |
Russ Owen
|
|
|
travis ###-#### fn Handrails not in compliance. 2/23/00 2:06:01 PM
|
BLD-Final | 2/17/2000 | 2/18/2000 | 2/18/2000 | P | FAIL |
Russ Owen
|
|
|
Travis, ###-#### Posted C/N 2/23/00 11:19:58 AM
|
BLD-Grading Inspection | 2/17/2000 | 2/17/2000 | 2/17/2000 | | BOND |
Rita DeYoung
|
|
|
Rough grading complete. Fine grading and revegetation not. Engineer has recommended an $850.00 bond for incomplete work. Upon receipt of this surety the grading and drrainage is conditionally approved by Public Works
|
Receive PAYMENT IN FULL | | | 2/17/2000 | | DONE |
|
|
|
recived $275 on 11-16-99
|
BLD-Framing/Rough-in | 12/17/1999 | 12/20/1999 | 12/20/1999 | A | PASS |
Jim Storey
|
|
|
FOR SHEET ROCK INSP--TRAVIS-###-#### Interior sheer ok.
|
BLD-Energy code compliance | 12/8/1999 | 12/9/1999 | 12/9/1999 | P | PASS |
Wes Worcester
|
|
|
TRAVIS ###-####
|
BLD-Framing/Rough-in | 12/6/1999 | 12/7/1999 | 12/7/1999 | A | PART |
Wes Worcester
|
|
|
TRAVIS ###-#### FR R/I Finishing truss engineering.
|
BLD-Framing/Rough-in | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | PART |
Tom Arcoraci
|
|
|
TRAVIS ###-#### SHEAR NAILING INSP Ok to side.
|
BLD-Framing/Rough-in | 11/19/1999 | 11/19/1999 | 11/19/1999 | P | FAIL |
Carl Dependahl
|
|
|
342's area; unable to find plans, recall.
|
BLD-Framing/Rough-in | 11/18/1999 | 11/19/1999 | 11/19/1999 | P | FAIL |
|
|
|
done by 408 SHEAR WALL TRAVIS ###-####
|
Receive PAYMENT IN FULL | | | 11/16/1999 | | DONE |
|
|
|
|
Telephone call | | | 10/28/1999 | | DONE |
|
|
|
called $275.00 hillside fee due. Will be due before a permanent occ. can be issued. Left message w/ # in case of questions. (FEES WERE MISSED.)
|
BLD-Foundation | 10/5/1999 | 10/6/1999 | 10/6/1999 | P | PASS |
Wes Worcester
|
|
|
Randy ###-####
|
BLD-Foundation | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | PART |
Wes Worcester
|
|
|
randy ###-#### fd insp rear retaining wall ok
|
BLD-Footing | 9/28/1999 | 9/29/1999 | 9/29/1999 | A | PART |
Wes Worcester
|
|
|
RANDY ###-#### FT INSP- Ftg. Ok
|
Plan Reviewer's activity | | | 9/28/1999 | | DONE |
|
|
|
appeal period is over. additional info req. has been rec.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/1999 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/28/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/28/1999 | | DONE |
|
|
|
|
Telephone call | | | 9/28/1999 | | DONE |
|
|
|
permit ready
|
Issue PAID IN FULL permit | | | 9/28/1999 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 8/25/1999 | | 9/28/1999 | | PASS |
Dan Overy
|
|
|
9/28/99 10:44:47 DJO - activity updated through activity BLDA022 from case BLD99-02579.
|
Plans ACCEPTED BY PLAN CHECK | | | 9/17/1999 | | DONE |
|
|
|
PLANS SENT OVER FOR STRUCURAL REVIEW. APPEAL PERIOD ENDS ON 09-27-99.
|
Plan Reviewer's activity | | | 9/17/1999 | | DONE |
|
|
|
HAVE REVIEWED PLANS. STILL NEED INFORMATION FROM DESIGNER. PERMIT CANNOT BE ISSUED UNTIL APPEAL PERIOD IS OVER 09-27-99
|
Routing - PLANNING | 9/14/1999 | 9/14/1999 | 9/14/1999 | | PASS |
Susan Riggs
|
|
|
tHIS HAS AN APPEAL DATE OF 9-27-99. NO PERMITS TO BE ISSUED UNTIL 5:00 ON 9-27-99 SRIGGS
|
Routing - PUBLIC WORKS GRADING | 8/31/1999 | | 8/31/1999 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 1. Comply with conditions of approval for CFH99-2579.
|
Routing - PUBLIC WORKS | 8/25/1999 | | 8/31/1999 | | PASS |
|
|
|
took to terry records. 8/25/99
|
Routing - PUBLIC WORKS GRADING | 8/26/1999 | | 8/26/1999 | | FAIL |
Rita DeYoung
|
|
|
Grading plan needs revision to provide swale behind house and to prevent runoff from being discharged to adjacent lot. Spoke with engineer and contractor.
|
Application received | | | 8/25/1999 | | |
|
|
|
|
Routing - PLANNING | 8/31/1999 | | | | PEND |
|
|
|
|
CHANGE STATUS TO (F) | | | | | |
|
|
|
275.00 FEE DUE FROM MISSED DRAINAGE FEES
|