BLD-Final | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | PASS |
Tony Young
|
|
|
FN OCC BOB-- ###-#### CELL
c of c # 19858 issued 10/25/2000 3:22:13 PM
|
BLD-Final | 10/18/2000 | 10/19/2000 | 10/19/2000 | A | FAIL |
Tony Young
|
|
|
###-####
c/n posted, see owner 10/19/2000 10:32:01 AM
|
FIRE-Final Inspection | 10/18/2000 | 10/18/2000 | 10/18/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 10/18/2000
|
BLD-Grading Inspection | 10/5/2000 | 10/5/2000 | 10/5/2000 | | PASS |
Rita DeYoung
|
|
|
Grading complete and approved
|
FIRE-Supply Line Cover | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 14:21:42. Contact: ###-####.; called the number above and they don't know why this was called in
|
FIRE-Supply Line Cover | 7/14/2000 | 7/14/2000 | 7/14/2000 | A | FAIL |
Joe Tawney
|
|
|
Fail uncover thrust blocks at riser.
|
BLD-Energy code compliance | 3/2/2000 | 3/3/2000 | 3/3/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 19:35:42. Contact: ###-####.
|
BLD-Energy code compliance | 3/1/2000 | 3/2/2000 | 3/2/2000 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 18:24:57. Contact: ###-####. Still need to complete upper floor vapor burrier. 3/2/00 2:26:06 PM
|
BLD-Energy code compliance | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 11:15:42. Contact: . Still not done upper floor vapor C/N. posted 2nd trip today. 3/3/00 9:05:44 AM
|
BLD-Framing/Rough-in | 2/22/2000 | 2/23/2000 | 2/23/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/22/2000 at 08:21:15. Contact: ###-####. Fireblocking at upper floor area, fire sprinkler approval. 2/24/00 1:26:37 PM
|
BLD-Framing/Rough-in | 1/18/2000 | 1/19/2000 | 1/20/2000 | A | PART |
Jim Sly
|
|
|
###-#### Keep C/N; need eng's ok for drag strut & blocking 342 area. Shear nails ok. 1/20/00 8:56:18 AM
|
BLD-Framing/Rough-in | 1/19/2000 | 1/19/2000 | 1/19/2000 | A | PART |
Carl Dependahl
|
|
|
"Shear Insp." nailing ok; C/N: need eng's ok for blocking attachment @ drag strut & extend hold downs.
|
Receive PAYMENT IN FULL | | | 1/11/2000 | | DONE |
|
|
|
|
Telephone call | | | 12/8/1999 | | DONE |
|
|
|
I have left three seperate message the approximate dates were 10-28-99 a couple days later and today on 12-8-99. The other messages I left just stated that I neede to speak with them and asked if they could call me back my third message today left the amount of money that they were going to be billed for.
|
BLD-Foundation | 11/10/1999 | 11/10/1999 | 11/10/1999 | P | PASS |
|
|
|
CHRIS ###-#### FOUND R-bar placed.
|
BLD-Framing/Rough-in | 11/2/1999 | 11/3/1999 | 11/3/1999 | A | PASS |
Wes Worcester
|
|
|
STEVE--- ###-#### RE-BAR Eng. letter recieved by 342.
|
BLD-Footing | 11/2/1999 | 11/2/1999 | 11/2/1999 | P | FAIL |
Wes Worcester
|
|
|
FOR T INSP-- STEVE-- ###-#### Need eng's letter 3, rebar in place.
|
Print Pending Permit.LaserJet4 | | | 10/6/1999 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/6/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/6/1999 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/6/1999 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 10/4/1999 | | 10/5/1999 | | DONE |
|
|
|
SUBDIVISION HAS BEEN RECORDED? SENT BACK TO PW FOR CORRECT ADDRESSING.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/1999 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/5/1999 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 8/26/1999 | | 10/5/1999 | | PASS |
Dan Overy
|
|
|
10/5/99 14:10:42 DJO - activity updated through activity BLDA022 from case BLD99-02585.
|
Routing - PUBLIC WORKS | 8/26/1999 | | 9/27/1999 | | DONE |
|
|
|
took to terry records, subdivision has not been recorded yet, temp address, submitted per tim hogland, tim h had him pay the plan review fee up front. pe 8/26/99
|
Routing - PUBLIC WORKS GRADING | 9/27/1999 | 9/27/1999 | 9/27/1999 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3
|
Routing - PLANNING | 9/27/1999 | 9/27/1999 | 9/27/1999 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/30/1999 | | 8/30/1999 | | PEND |
Rita DeYoung
|
|
|
Grading plan must indicate that roof drainage will be routed to the storm drain stubout that is provided to the lot and identify location on the plan. The setback from the ascending slope is only two feet on the plan, while the UBC requirement is fifteen feet. Left message with Dean Briggs about these two required revisions.
|
Meeting | | | 8/26/1999 | | PASS |
|
|
|
per Tim Hogland pay plan check up front.
|
Application received | | | 8/26/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 10/5/1999 | 10/5/1999 | | | PEND |
|
|
|
address changed from temp. 101 w thornberry dr. pe
|
Routing - PLAN CHECK | 10/4/1999 | 10/4/1999 | | | PEND |
|
|
|
TEMP ADDRESS 101 W THORNBERRY/RECORDED 10/4/99 ASSIGNED NEW ADDRESS 222 W THORNBERRY DR. PE
|
Inspection Record Card- Bld | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Routing - PLAN CHECK | 9/27/1999 | | | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
RECEIVED PLANS 9-27-99. HAVE COMPLETED MY REVIEW AND AWAITING FOR SUBDIVISION TO THE RECORDED.
|