Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD99-02651
StatusFinaled
Name CALVARY CHAPEL "BLD A"
Site Address 123 S AUTO DR
Project NameCALVARY CHAPEL BLDG. A
Customer Number 
ePlanReviewNo
Description
(CALVARY CHAPEL SANCTUARY - BUILDING "A") (6-19-03 PLAN MODIFICATION - TO ENCLOSE THE WEST COURTYARD AND USE THE AREA FOR 45 ADDITIONAL SEATS.) This building is fire sprinklered to substitute for 1-hr fire-resistive construction of the building. To convert a former automobile show room/repair garage to a church. When completed, the first floor will have a floor area of 19,800 square feet and the 2nd floor will have a floor area of 2,900 square feet. Additions total 3,400 square feet. Work is to include constructing new shear walls, strengthing the roof diaphragm, constructing a roof structure at the perimeter of the existing roof, building a new second floor, installing columns and beams, installing a fire alarm system, upgrading the fire sprinklers system, etc. all per approved drawings, engineering, and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1996 as regulated by the Fire Department. A demo permit (BLD99-0687) and a foundation permit (BLD99-1232) were issued earlier. DRH98-0208 PC#705-99 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/17/2009 DONE
Case Summary (BLD)  7/1/2004 DONE
Fee Review-notes1/14/20001/14/20004/21/2004 DONE
Fee Review-notes9/7/19999/7/19994/21/2004 DONE
LINDA THIS PERMIT WAS ACCEPTED WITH THREE BUILDINGS. I HAD MR. BUTLER SEPARATE INTO THREE PERMITS. INITIAL PROJECT VALUE FOR ALL THREE BUILDINGS WAS $625,359. THANKS KMM
Fee Review-notes9/2/1999 4/21/2004 DONE
Permanent Occupancy 4/19/20044/19/2004 DONE
Details
BLD-Final4/19/20044/19/20044/19/2004PPASS
DetailsRuss Owen
###-#### tim ok perm 4/18/2004 11:03:24 PM
Permanent occupancy  4/19/2004 DONE
Perm. Occ. Cert. # 10102 issued 4-19-04 to Calvary Chapel.
Temporary occupancy  1/12/2004 DONE
Temp. Occ. Cert. # 5060 issued 1-12-04 to Calvary Chapel, Bldg. A.
BLD-Final1/8/20041/9/20041/9/2004APART
DetailsRuss Owen
###-#### steve .OK TEMP OC PENDING PUBLIC WOTKS FOR FINAL. 1/9/2004 12:20:59 PM
Override - Parcel Holds  1/8/2004  
Override - Parcel Holds  1/8/2004  
(F) Reprint permit  1/7/2004 DONE
(F) Reprint permit  1/7/2004  
(F) Reprint permit  1/7/2004 DONE
Print Occupancy Form  1/7/2004 DONE
Print Occupancy Form  1/7/2004  
CHANGE STATUS TO (ISS)  1/7/2004 DONE
per carl westfall change status to issued should not be in exp status-customer came in from steed const & picked up permit/mls--see comments for more info
CHANGE STATUS TO (ISS)  12/10/2003 DONE
Permit not yet picked up//plan modification done//12/10/03 BAM
Telephone call  12/10/2003 DONE
Spoke with Scott R at ACHD and he still wants the hold on this parcel due to them moving drainage pipes without permits or approval from them //12/10/03 BAM
Telephone call  10/29/2003 DONE
left mess with terry that scott rudell with the a.c.h.d.needs plans for grading & drainage 1st before releasing this one
Telephone call  10/22/2003 DONE
Spoke with Terry to remind that permit is ready and that the grading & drainage plans need to be taken to Scott R at ACHD, and also told the fees
Telephone call  9/24/2003 DONE
left mess for terry butler that fees are due
Plan Reviewer's activity  7/2/2003 PASS
Plan modification approved and taken to the permits desk.
Print Occupancy Form  7/2/2003 DONE
Telephone call  7/2/2003 DONE
revised plans ready
Routing - FIRE6/20/2003 6/23/2003 PASS
Bldg permit approved. Sprinlker and alarm permits are required.
Routing - PLANNING6/19/2003 6/20/2003 PASS
Approve. There is adequate parking for the additional seating proposed.
Routing - PLAN CHECK6/6/2003 6/19/2003 PASS
PLAN MODIFICATION - Received on June 6, 2003. Work involves enclosing the West courtyard and using the area for seating (45 additional seats - 999 total occupant load of Sanctuary).
Plan resubmittals received  6/6/2003 DONE
Received three copies of revised sheets A-1, A-2, A-3, A-4. For Building A. One copy of cover letter. Routed to Carl W. kmm
Plan resubmittals received  5/13/2003 DONE
Received oney copy of shet. letter requesting occ. count change and 2 sheet 8 1/2 x 11 plans - showing add. seating. Routed to Carl W. kmm
BLD-Conference4/7/20034/7/20034/7/2003ADONE
DetailsRuss Owen
Meet on site with George Slain and Steve Carlson. The building has no CO. The tenants have been given both a 5 day notice on 1/24/03 and 25 day on 2/3/03. Now we have instructed them to submit to the director a letter of intent for all violations on property, also to check with the plan review dept and related office personel for any questions that they may have. 4/7/2003 11:29:24 AM
BLD-Conference3/13/20033/13/20033/13/2003PPART
DetailsRuss Owen
Meetr with Steve Carlson will be submitting letter of request for extension and intent for all violations on property. 3/13/2003 2:52:40 PM
FIRE-Final Inspection3/4/20033/5/20033/5/2003PPASS
DetailsTroy Cobbley
STEVE; Phone #: ###-#### Fire life safety finaled 3/5/2003 3:26:39 PM
Code Occupancy Approval  2/5/2003 PASS
ALL IN AS REQUIRED PER BUILDING A FINAL SIGNED OFF.
BLD-Other2/4/20032/4/20032/4/2003PDONE
DetailsTroy Cobbley
I dropped off a copy of the original correction notice Joe Tawney had written up. I left the copy with Donna
BLD-Conference4/29/20024/30/20024/30/2002ACANC
DetailsRuss Owen
###-#### BRYAN
BLD-Framing/Rough-in1/8/20011/8/20011/8/2001PPART
DetailsRuss Owen
###-####needs achd,public works for a temp. also handrail at stairs need raised,all rest room rear grab bars need relocating. 1/8/2001 2:58:11 PM
FIRE-Final Inspection12/14/200012/15/200012/15/2000APART
DetailsJoe Tawney
Bryan ###-#### Reinsp OK for temporary occupancy 12/17/2000 8:31:15 PM
FIRE-Final Inspection12/13/200012/14/200012/14/2000ACANC
DetailsJoe Tawney
FIRE FN BRIAN ###-#### Cancel not ready 12/14/2000 12:38:41 PM
FIRE-Sprinkler Rough-in12/11/200012/12/200012/12/2000PFAIL
DetailsJoe Tawney
Brian ###-#### Final Fail C/N issued 12/13/2000 8:02:25 AM
FIRE-Final Inspection12/5/200012/6/200012/6/2000AFAIL
DetailsJoe Tawney
Brian ###-#### Fail NOT READY FOR FINAL INSP 12/6/2000 12:58:08 PM
FIRE-Sprinkler Rough-in11/30/200012/1/200012/1/2000PCANC
DetailsJoe Tawney
CALL FIRST ###-#### Cancel resched for 12/4/00 12/1/2000 4:12:49 PM
FIRE-Sprinkler Rough-in11/30/200012/1/200012/1/2000PCANC
DetailsJoe Tawney
CALL FIRST ###-#### Cancel resched for 12/4/00 12/1/2000 4:12:49 PM
BLD-Framing/Rough-in11/28/200011/29/200011/29/2000APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/28/2000 at 17:33:38. Contact: ###-####. grid ok 11/29/2000 10:58:16 AM
BLD-Framing/Rough-in11/17/200011/20/200011/20/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/17/2000 at 16:56:01. Contact: ###-####. front entry truss ok to cover 11/20/2000 10:06:19 AM
BLD-Conference11/20/200011/20/200011/20/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/20/2000 5:08:55 PM w/ Tom re w.i.p.
BLD-Framing/Rough-in11/17/200011/17/200011/17/2000PPART
DetailsCarl Dependahl
Bryan ###-####; conf re roof const...scuppers, etc. for overflow 11/17/2000 5:21:23 PM
FIRE-Sprinkler Rough-in11/14/200011/14/200011/14/2000PPART
DetailsJoe Tawney
Brian ###-#### OK on rough in for South & East canopies 11/15/2000 8:04:42 AM
BLD-Framing/Rough-in10/31/200010/31/200010/31/2000PPART
DetailsCarl Dependahl
Bryan ###-####; n.s.&w portico roof frames ok 10/31/2000 2:59:44 PM
BLD-Framing/Rough-in10/30/200010/30/200010/30/2000PNR
DetailsCarl Dependahl
Bryan ###-#### recall 10/30/2000 4:44:54 PM
BLD-Framing/Rough-in10/19/200010/20/200010/20/2000APART
DetailsCarl Dependahl
Brian ###-####; draft stop, firesops at passageway framing ok. ok to cover those areas 10/20/2000 2:29:02 PM
BLD-Framing/Rough-in10/19/200010/19/200010/19/2000PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 10/19/2000 c/n, firestops & lid const at exit passage at rear; also rfi for s/f dampers same location;seal draft stops 10/19/2000 2:54:59 PM
BLD-Framing/Rough-in10/5/200010/5/200010/5/2000PPART
DetailsCarl Dependahl
###-####; ok to cove 1s 10/5/2000 12:16:36 PM t fl mezz; question re roof drains, will advise 10/5/2000 12:17:04 PM
BLD-Framing/Rough-in10/2/200010/2/200010/2/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/02/2000 at 11:12:10. Contact: ###-####... 10/2/2000 3:02:30 PM ok to cover 1st fl below mezz & foyer at west end
(exit passage) 10/2/2000 3:05:00 PM
FIRE-Conference9/25/20009/26/20009/26/2000APART
DetailsJoe Tawney
###-####. Conf on soffits around bldg. Non combustible constr no spklrs req 9/26/2000 12:17:07 PM
BLD-Framing/Rough-in9/25/20009/25/20009/25/2000PPART
DetailsCarl Dependahl
###-####; prelim. at parapet/ soffit... chk w/ fire for sprinklers 9/25/2000 3:52:40 PM
BLD-Framing/Rough-in9/19/20009/19/20009/19/2000PPART
Details
BRIAN-- ###-#### ok to cover foyer area both floors in process of making fire block draft stop seals, also ok to cover the perimeter walls of the assy area south and east 9/19/2000 2:47:45 PM
BLD-Framing/Rough-in9/19/20009/19/20009/19/2000PPART
Details
BRIAN-- ###-#### ok to cover foyer area both floors in process of making fire block draft stop seals, also ok to cover the perimeter walls of the assy area south and east 9/19/2000 2:47:45 PM
BLD-Conference9/11/20009/12/20009/12/2000APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/11/2000 at 18:50:28. Contact: ###-####.
BLD-Framing/Rough-in8/14/20008/15/20008/15/2000APART
DetailsCarl Dependahl
JASON -- ###-#### FR
BLD-Framing/Rough-in8/14/20008/14/20008/14/2000PNR
DetailsCarl Dependahl
JASON -###-#### FR
BLD-Final8/11/20008/11/20008/11/2000PCANC
DetailsTony Young
JASON -- ###-#### FN
canceled by contractor, Jason 8/11/2000 4:55:02 PM
FIRE-Conference8/10/20008/10/20008/10/2000PPART
DetailsJoe Tawney
jason ###-#### for conf Conf. with contractor & architect. 8/11/00 12:01:54 PM
FIRE-Conference5/11/20005/11/20005/11/2000PPART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 05/11/2000 at 09:45:48. Contact: ###-####. Conf. with centr. regarding exit signs & fire extinguisher placement. 5/12/00 8:59:27 AM
BLD-Framing/Rough-in4/12/20004/13/20004/13/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/12/2000 at 10:32:36. Contact: ###-####. Conf. on framing 4/13/00 1:04:40 PM
BLD-Footing1/13/20001/14/20001/14/2000APART
DetailsCarl Dependahl
###-#### BRIAN Int. ftg. ok to continue. 1/14/00 2:57:37 PM
BLD-Foundation11/23/199911/23/199911/24/1999PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/23/1999 at 10:43:03. Contact: ###-####. Rec'd eng's detail for SH. Wall connection to beam; discussed cold protection for remainder masonry- no "anti-freeze".
BLD-Foundation11/22/199911/22/199911/22/1999PNR
DetailsCarl Dependahl
BLOCK INSPECTION BRYAN ###-#### Need verify resubmittal for masonry shear wall met w/supt. & mason recall.
Issue PAID IN FULL permit  11/8/1999 DONE
Routing - PLAN CHECK10/29/1999 11/5/1999 PASS
Plan assigned to (CJW)9/8/1999 11/5/1999 PASS
DetailsCarl Westfall
11/5/99 10:56:47 CJW - activity updated through activity BLDA022 from case BLD99-02651.
PLANS/APPL TAKEN TO FRONT DESK  11/5/1999 PASS
Print Occupancy Form  11/5/1999 DONE
Inspection Record Card- Bld  11/5/1999 DONE
Telephone call  11/5/1999 DONE
TALKED TO TERRY BUTLER ###-#### GAVE DOLLAR AMOUNT
Plan Reviewer's activity  11/3/1999 PASS
Drawings approved, with conditions, after resubmittal review. Drawings relating to building "B" and "C" were removed from the package. The owner was not ready to pull those permits.
Routing - FIRE10/25/199910/29/199910/29/1999 PASS
Plan Review Completed(1st rev)  10/29/1999 PEND
Plan resubmittals received  10/28/1999 PEND
PLAN RESUBMITTALS RECEIVED FROM TERRY BUTLER, ARCHITECT, FORWARDED SAME TO CARL WESTFALL. 10/28/99 DAR
Plan Reviewer's activity  10/25/1999  
Routing was held up while waiting for a response from the Architect about 1-hr construction, fire sprinkler system, and alarm systems. The original plan review report was altered to reflect the Architects direction.
Routing - PLAN CHECK9/23/1999 10/25/1999  
Plan Reviewer's activity  9/30/1999  
UBC plan review started Sept. 30, 1999 and finished Oct. 8, 1999. A response from the architect is required. See the conditions list.
Routing - PLANNING9/14/1999 9/23/1999 PASS
Approval subject to submittal of a landscape plan which meets Forestry requirements and recommendations. DRH99-00191
Additional plans submitted  9/17/1999  
RECEIVED TWO COPIES OF SHEETS M-10, M-11, M-12, M-20 M-21, M-22, E-1, E-2, E-3E-4, E-9 E-5, E-6 ROUTED TO CARL W. KMM
Routing - PUBLIC WORKS9/8/1999 9/14/1999 PASS
Plans ACCEPTED BY PLAN TECH  9/10/1999 PASS
RECEIVED FIVE COPIES OF CIVIL DRAWINGS. KMM
Plan assigned to (MYS)9/2/1999 9/8/1999  
DetailsMarlene Southard
Assigned to CJW
Received Certificate of Value  9/7/1999 DONE
INITIAL CERT. OF VALUE WAS FOR ALL THREE BUILDINGS. I HAD APPLICANT SEPARATE INTO THREE PERMITS. INITIAL CERT. OF VALUE WAS $625,359. NEW VALUE FOR BUILDING A IS PROJECT VALUE $312,680
KMM
Recd Pcfee & Taken To Pln CK  9/2/1999
Application received  9/2/1999
Routing Off Site - A.C.H.D11/5/199911/5/1999  PEND
TALKED TO TERRY WILL BRING IN LETTER FROM ACHD
Plans ACCEPTED BY PLAN TECH    PEND
REQUIRES FIVE COPIES OF GRADING AND DRAINAGE WITH CALCS. TWO FOR ME AND THREE FOR BRIAN M. KMM
Plan routing begun/TENANTS     
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
Routing - PLAN CHECK6/24/2003